CORDIS fornisce collegamenti ai risultati finali pubblici e alle pubblicazioni dei progetti ORIZZONTE.
I link ai risultati e alle pubblicazioni dei progetti del 7° PQ, così come i link ad alcuni tipi di risultati specifici come dataset e software, sono recuperati dinamicamente da .OpenAIRE .
Risultati finali
Second version of the Data Management Plan. Related to T1.4
Data Management Plan Version 1 (si apre in una nuova finestra)First version of the Data Management Plan to be followed in the project. Related to T1.4
Task 2.1 will result in this deliverable, which will be (i) a report on the improvements and harmonization of the dynamic carbon footprint assessment, tools and database, (ii) based on the previous point, a dataset of pre-calculated improved dynamic inventories, as an excel-file or another data type file (iii) dynamic and/or prospective characterization factors or models for climate change effects, presented as a dataset or code
List of best available BbS and technologies and inventories of existing technologies (si apre in una nuova finestra)Task 5.2. Report including the identification and selection of the best available BbS and technologies at industrial scale in the relevant sectors
Initial version of the Communication and dissemination Plan (si apre in una nuova finestra)This deliverable is related to T7.1. It compiles the strategy to be followed in the project in relation to the C&D.
Set of circularity indicators for BbS and guidance document for sustainability assessment of circular bio-based strategies (si apre in una nuova finestra)Task 2.2. A set of circularity indicators for BbS is provided as well as a guidance document (scientific paper or report) for sustainability assessment of circular bio-based strategies.
Policy briefs v1 (si apre in una nuova finestra)This deliverable complies the first version of the policy briefs created based on the results obtained at mid-term of the project. Related to T7.5
Stakeholder focus groups creation (si apre in una nuova finestra)Description of the actors selected and interested among the stakeholders analysis to constitute the focus groups that will be integrated in the co-creation process. Related to T7.3
Interim report of the results from WP4 (si apre in una nuova finestra)Tasks 4.1, 4.2, 4.3. A short public report presenting the interim and preliminary results of the entire WP4.
A harmonized set of life cycle impact assessment methods, with additional temporal differentiation (si apre in una nuova finestra)Based on the work of Task 2.3, a report that covers (i) the analysis of existing relevant life cycle impact assessment approaches, and (ii) a harmonization through selection, aggregation and/or improvement of these, (iii) a set of characterization factors or models belonging to the latter, (iv) a further improved temporally differentiated characterization impact modelling, (v) an associated set of prospective characterization factors or models. Conventional and prospective characterization factors and models may also be provided in code or excel lists, compatible with LCA software.
Report with processes and strategies selected for upscaling inventories of low-TRL BbS (si apre in una nuova finestra)Task 3.2. A synthesis of the engineering design approaches for low-TRL processes, describing the most suitable methods and calculation tools for process scaleup and flowsheet design, for a large variety of processes involved in the bio-based products manufacturing.
Review of pLCA approaches, conclusions and orientations for research (si apre in una nuova finestra)Connected to “Task 3.1: Deep review of the “prospective” LCA approaches and applications to bio-based and fossil-based technologies”. A report that synthesizes the existing approaches and definitions of prospective LCA of bio-based emerging technologies will be produced, with the aim to identify differences, similarities and harmonize methods for both foreground and background modelling
Project management guidelines (si apre in una nuova finestra)Task1.1. This deliverable will describe the project management methodology and quality control procedures and the project risk management plan performed to provide methods and processes for identifying and mitigating risks threatening the project, scientific impasses, resource drift, conflict, etc.
Task 3.2. The final strategy of LCA application to low-TRL BbP is synthesized based on the methodologies identified in D3.2 and applied in Task 5.1 and after discussions with the stakeholders.
È in corso la ricerca di dati su OpenAIRE...
Si è verificato un errore durante la ricerca dei dati su OpenAIRE
Nessun risultato disponibile