Ethics plan
(öffnet in neuem Fenster)
This deliverable will be required to ensure proper ethics management of the project. An ethics plan will be provided with the following information:•Details of the forthcoming actions and responsibilities to ensure that the ethics requirements are satisfied in the project. •Schedule to obtain and deliver all documents related to Ethics requirements identified in Part A.D9.1 will include results from T9.3.
Preliminary dissemination, exploitation and communication plan
(öffnet in neuem Fenster)
This deliverable will be the first control point on the status of T8.1. A preliminary version of the plan for dissemination, exploitation and communication will be provided.D8.1 will include results of task T8.1.
First report on fibres and yarns production
(öffnet in neuem Fenster)
This deliverable will be the first control point on the status of WP3 tasks. A report presenting the first results on cellulosic fibres and yarns production will be provided with the following information:•Production methodology of IL-based wet-spun fibres.•Production methodology of Biocelsol wet-spun fibres.•Production methodology of AeoniQ wet-spun fibres.•Preliminary conditions for yarns production through cotton-type spinning.D3.1 will include the first results of tasks T3.1, T3.2, T3.3 and T3.4.
First report on agricultural and algal biomass processing methods
(öffnet in neuem Fenster)
This deliverable will be the first control point on the status of WP1 tasks. A report presenting the first results on agricultural residues collection and treatment and micro- and macroalgae cultivation and extraction procedures will be provided with the following information:•Status on the selection, collection and pre-processing of the agricultural residues and first results on the feedback loop with leaders from tasks T3.1, T3.2, T3.3, T3.4 and T4.1.•Procedures and results on microalgal cultivation and harvesting techniques.•Procedures and results on macroalgal cultivation and harvesting techniques.D1.1 will include the first results of tasks T1.1, T1.2 and T1.3.
Report on the collection system for post-consumer home textiles and methodology for sorting and preparation of post-consumer home textiles
(öffnet in neuem Fenster)
This deliverable will reflect the results of T2.1 and the preliminary results of T2.2. A report on the results from the developed collection system and on the methodology for sorting and preparation of post-consumer home textiles will be provided with the following information:•Methodology for collection of post-consumer home textiles and results/achievements of the collection campaigns.•Results from the sorting and preparation of post-consumer home textiles for reuse, remake, and recycling.D2.1 will include results of tasks T2.1 and T2.2.
First report on the development of bioformulations for textiles dyeing and finishing processes
(öffnet in neuem Fenster)
This deliverable will be the first control point on the status of T4.1. A report presenting the first developments in bioformulations preparation will be provided with the following information:•Modification of raw materials for compatibilisation with the bioformulations to be developed.•First insights on bioformulations development.D4.1 will include the first results of task T4.1.