CORDIS fornisce collegamenti ai risultati finali pubblici e alle pubblicazioni dei progetti ORIZZONTE.
I link ai risultati e alle pubblicazioni dei progetti del 7° PQ, così come i link ad alcuni tipi di risultati specifici come dataset e software, sono recuperati dinamicamente da .OpenAIRE .
Risultati finali
Report on the organization of dissemination activities to a broader public, visits to the demo facilities and introducing the project to the stakeholders, and training materials like online presentations and webinars, etc.
Dissemination and Communication Plan Update 1 (si apre in una nuova finestra)The updated plan for dissemination and communication will be reported based on the reflection on the initial plan and feedback from the partners and target groups.
Preselection of biomasses based on the regions (si apre in una nuova finestra)Based on relevance for stakeholders in the consortium and industry in Europe, composition with respect to reactive ash species, and availability at scales and sizes applicable for testing, four biogenic fuels will be selected for use in the 10 kW and 20 kW reactor at CTH and CSIC, where of two of these fuels will be tested in the 1 MW unit at TUDA.
Public project website (si apre in una nuova finestra)D7.4 is the design and production of public version of the project website for external communication and to showcase the project objectives, progresses and results. The website will be maintained by 1cube for the entire duration of the project. After the project ends, a small version of the website will be maintained under 1cube own website.
Project logo and set of public document templates (si apre in una nuova finestra)D7.3 will cover the generation of the project logo and visual identity of the project and production of project templates to be used for internal and external communication.
Dissemination video 1 (si apre in una nuova finestra)One video of introduction of the project, its concept and benefits at M6. The video will highlight the potential benefits of implementing the proposed technology in the CHP plants.
Dissemination and Communication Plan (si apre in una nuova finestra)Plan for dissemination and communication, including target group identification, channels to be used, etc. will be reported in D7.5. The first version of D7.5 will be at M3 and it will updated periodically with the inputs of all partners at M12, M24 and M42.
Optimization of the post-oxidation chamber design by CFD modelling (si apre in una nuova finestra)D2.3, similarly to D2.2 provides the packing configurations for the same plants. The effect of the solids packing onto the pressure drop and achievable heat transfer rates, will be reported.
Results on CFD modelling of fuel reactors with packings (si apre in una nuova finestra)D2.2 provides the design specifications for the post-oxidation chambers, i.e. the pilot-scale plants of 10kW and 20kW and of the 1 MW Bio-CLC plant. The results of the parametric investigation related to i) air staging ii) optimal ratio of O2 injection will be reported.
È in corso la ricerca di dati su OpenAIRE...
Si è verificato un errore durante la ricerca dei dati su OpenAIRE
Nessun risultato disponibile