Case studies for ancillary services
(öffnet in neuem Fenster)
Models and descriptions of case studies considered for ancillary services of hybrid AC/DC grids. (T3.1)
Project Management Plan
(öffnet in neuem Fenster)
Report on project structure and management and methodology to grant quality of the project deliveries. (T7.1, T.2, T7,3). D7.1 will be delivered in M2, and revised in M18 and M36.
Communication and Dissemination plan first release
(öffnet in neuem Fenster)
Report on strategies of the communication and dissemination plan including D&C material (website, poster, flyers, etc.). (T6.1)
System needs and grid code requirements for future AC/DC grids
(öffnet in neuem Fenster)
This report will describe the system needs for the resilient and secure operation of AC/DC grids in the future and identify the gaps in the current grid codes to facilitate such operation. (T1.1, T1.2)
Modal Identification techniques in AC/DC grids
(öffnet in neuem Fenster)
Software tool and report on the model identification and small-signal analysis of large hybrid AC/DC power systems. (T4.2)
Modular software platform
(öffnet in neuem Fenster)
A modular software platform that enables interoperability between the SCADA/EMS with vendor-dependent models. (T2.1)
Exploitation and IPR Management plan first release
(öffnet in neuem Fenster)
Report on exploitation and IPR management strategies at Partner and Consortium levels. (T6.3)
System architecture guidelines and KPIs definition
(öffnet in neuem Fenster)
This report will describe the system architecture and KPIs needed to assess the techno-economic benefits of the developed decision support tools and their SCADA implementation. (T1.3, T1.4)
Case studies and models for low-frequency oscillation analysis
(öffnet in neuem Fenster)
Report on detailed description of two selected case studies for the identification and analysis of low-frequency oscillation. (T4.1)