D&C plan I
(öffnet in neuem Fenster)
The initial D&C Plan will be designed by REVOL, agreed by all partners and submitted as D7.2.
Cooperation strategy with JRC
(öffnet in neuem Fenster)
A cooperation strategy with JRC and timeline for the meetings (at least one meeting per year) will be established throughout the project to the share of project progress and available results or data (D7.4 in M6).
Smart solutions preliminary parameters identified by end users
(öffnet in neuem Fenster)
For smart solutions, a preliminary list of inputs and smart solutions will be requested from end users (e.g., requirements for integrated data usage, preferences for irrigation strategies and soil health management, and insights for user interface design for maximum usability) to adjust the parameters and the programming of the systems.
Co-creation results for adaptation of RAINS solutions
(öffnet in neuem Fenster)
Two regional co-creation sessions with end users (M6, M9) will take place to consider their feedback in the adaptation and programming of the RAINS solutions, adapting to the reality and needs they have as future adopters of the practices. The results of all co-creation workshops will be delivered.