Computer integrated design of industrial control

Obiettivo



To maintain the competitive edge of European industry it is essential that quality and productivity are maximised in manufacturing. For most processes this means that advanced control should be used which integrates quality assurance and economic efficiency. Model Based Preditive Control (MBPC) has been shown in many real systems to provide such integration and can often give a pay back time on capital expenditure of less than a year. The Working Group believes that a sustained campaign to spread the benefits of MBPC will be of great significance.

The installation of MBPC requires skills not generally found in industry, as control design traditionally has been at a low level. The inclusion of economic and quality factors (ISO 9000) into an integrated control scheme requires planning and cooperation between control technologists, process engineers, and management. It is important to provide demonstrators of the technology and mechanisms by which the economic benefits can be assessed before installing any MBPC system.

The crucial step of MBPC is the acquisition of a process model which is used to provide predictions of the effects of hypothesised control actions. Sometimes the most appropriate model is a black box model or even a qualitative model. Often the model is not accurate over the whole operating region of the process, and it is vital to research methods which provide robust models (particularly in non-traditional areas) and MBPC designs which are still effective despite inevitable modelling errors.

Most industrial processes involve constraints : for example torque saturation in robotic actuators or temperature limits in a catalytic cracker. It is generally found that the best economic operation of a process is near or on a constraint boundary. MBPC is the only modern control approach which can handle constraints as a natural part of the algorithm. However, the use of constraints imposes several burdens on the optimization algorithm : computational load (significant for fast processes) ; lack of feasilibility (for over constrained systems) : potential instability (for particular types of process dynamics). The best way in which to deal with these problems is a matter for urgent research.

Campo scientifico (EuroSciVoc)

CORDIS classifica i progetti con EuroSciVoc, una tassonomia multilingue dei campi scientifici, attraverso un processo semi-automatico basato su tecniche NLP. Cfr.: Il Vocabolario Scientifico Europeo.

È necessario effettuare l’accesso o registrarsi per utilizzare questa funzione

Programma(i)

Programmi di finanziamento pluriennali che definiscono le priorità dell’UE in materia di ricerca e innovazione.

Argomento(i)

Gli inviti a presentare proposte sono suddivisi per argomenti. Un argomento definisce un’area o un tema specifico per il quale i candidati possono presentare proposte. La descrizione di un argomento comprende il suo ambito specifico e l’impatto previsto del progetto finanziato.

Invito a presentare proposte

Procedura per invitare i candidati a presentare proposte di progetti, con l’obiettivo di ricevere finanziamenti dall’UE.

Dati non disponibili

Meccanismo di finanziamento

Meccanismo di finanziamento (o «Tipo di azione») all’interno di un programma con caratteristiche comuni. Specifica: l’ambito di ciò che viene finanziato; il tasso di rimborso; i criteri di valutazione specifici per qualificarsi per il finanziamento; l’uso di forme semplificate di costi come gli importi forfettari.

ACM - Preparatory, accompanying and support measures

Coordinatore

Association pour le Développement de l'Enseignement et de la Recherche en Système Appliqué
Contributo UE
Nessun dato
Indirizzo
7 boulevard du Maréchal Juin
91371 Verrières-le-Buisson
Francia

Mostra sulla mappa

Costo totale

I costi totali sostenuti dall’organizzazione per partecipare al progetto, compresi i costi diretti e indiretti. Questo importo è un sottoinsieme del bilancio complessivo del progetto.

Nessun dato