Skip to main content

Solution for cost-effective integration of renewable intermittent generation by demonstrating the feasibility of flexible large-scale energy storage with innovative market and grid control approach

Obiettivo

The objective of eStorage is to develop cost-effective solutions for the widespread deployment of flexible, reliable, GWh-scale storage across EU, and to enhance grid management systems to allow the integration of large share of renewable.

The key issue we plan to address is the need for power regulation during low demand periods, when only inflexible baseload generation and intermittent renewable generation are operating. In contrast to conventional generation, a storage plant able to regulate its consumption could help to avoid curtailing wind.

Conventional Pumped Storage Hydro Plants (PSP) can only regulate their power in generation mode; variable speed technology for PSP can bring the additional flexibility in pumping mode as well. Developing technically and economically feasible solutions in eStorage will allow upgrading a significant part of European PSP capacity to variable speed, providing up to 10 GW of additional regulation capability with no environmental impact and little administrative burden, all at a much lower cost than developing new plants.

We will also develop and demonstrate solutions for coupling the dispatch of storage plants with renewable generation using advances Energy Management Systems. This will enable storage plants to maximise their value in the balancing markets.. From simulation studies, demonstration results and storage potential analysis we will evaluate the system-level benefits of storage and identify development barriers in order to draw recommendations for efficient market and regulatory framework to maximise the impact of project outcomes.

eStorage gathers major stakeholders from the entire value chain across EU (Elia – TSO, EDF – Generation Company, Imperial College – Academic Institution, Kema – Engineering Consultancy and Alstom – Equipment Manufacturer).

Parole chiave

Invito a presentare proposte

FP7-ENERGY-2011-2
Vedi altri progetti per questo bando

Meccanismo di finanziamento

CP - Collaborative project (generic)

Coordinatore

GE HYDRO FRANCE
Indirizzo
204 Rond Point Du Pont De Sevres
92100 Boulogne Billancourt
Francia

Mostra sulla mappa

Tipo di attività
Private for-profit entities (excluding Higher or Secondary Education Establishments)
Contatto amministrativo
Alexandra Agogue (Ms.)

Partecipanti (6)

ELECTRICITE DE FRANCE
Francia
Indirizzo
Avenue De Wagram 22
75008 Paris 08

Mostra sulla mappa

Tipo di attività
Private for-profit entities (excluding Higher or Secondary Education Establishments)
Contatto amministrativo
Henri Jacquet-Francillon (Mr.)
ELIA SYSTEM OPERATOR
Belgio
Indirizzo
Boulevard De L'empereur 20
1000 Bruxelles

Mostra sulla mappa

Tipo di attività
Private for-profit entities (excluding Higher or Secondary Education Establishments)
Contatto amministrativo
Christophe Druet (Mr.)
GRID SOLUTIONS SAS
Francia
Indirizzo
204 Rond Point Du Pont De Sevres
92100 Boulogne Billancourt

Mostra sulla mappa

Tipo di attività
Private for-profit entities (excluding Higher or Secondary Education Establishments)
Contatto amministrativo
Said Kayal (Mr.)
IMPERIAL COLLEGE OF SCIENCE TECHNOLOGY AND MEDICINE
United Kingdom
Indirizzo
South Kensington Campus Exhibition Road
SW7 2AZ London

Mostra sulla mappa

Tipo di attività
Higher or Secondary Education Establishments
Contatto amministrativo
Shaun Power (Mr.)
KEMA NEDERLAND BV
Paesi Bassi
Indirizzo
Utrechtseweg 310
6812 AR Arnhem

Mostra sulla mappa

Tipo di attività
Private for-profit entities (excluding Higher or Secondary Education Establishments)
Contatto amministrativo
Derek Riezebos (Mr.)
ALGOE SA
Francia
Indirizzo
9 Bis Route De Champagne
69130 Ecully Cedex

Mostra sulla mappa

Tipo di attività
Private for-profit entities (excluding Higher or Secondary Education Establishments)
Contatto amministrativo
Fabienne Proisy-Le Cocq (Ms.)