Skip to main content
Weiter zur Homepage der Europäischen Kommission (öffnet in neuem Fenster)
Deutsch de
CORDIS - Forschungsergebnisse der EU
CORDIS
Inhalt archiviert am 2024-06-18

Tool-supported policy-development for regional adaptation

Ziel

Adaptation in the face of climate change is currently a major challenge, not only in the EU, but all around the world. Climate change has two distinct characters: the slower trends in climatic variables such as sea water temperatur, and the extreme weather phenomena, such as heavy precipitation. The fundamental driver for regional adaptation are regional climate scenarios. Crucial for local societies is the resilience of critical infrastructures, such as Energy and Transport, against the envisaged climate scenarios. Without proper functioning of such infrastructures, many service sectors, such as Tourism, will be negatively affected. ToPDAd developes state-of-the-art socioeconomic methods&tools for an integrated assessment supporting regional adaptation decision-making. Based on these, conjectures with respect to EU level policies for the considered sectors Energy, Transport, as well as, Tourism are made. Two time frames are specified; 2010-2050 and 2050-2100 for mid-term and long-term strategy formulations. Regional strategies and EU-level policies need to be consistent across the time frames in order to avoid maladaptation. ToPDAd will also develop the European Climate Adaptation Platform (DCLIMATE-ADAPT). The CLIMATE-ADAPT is key for continuous learning, and a repository of data and tools supporting adaptation decision-making.

Wissenschaftliches Gebiet (EuroSciVoc)

Programm/Programme

Thema/Themen

Aufforderung zur Vorschlagseinreichung

FP7-ENV-2012-two-stage
Andere Projekte für diesen Aufruf anzeigen

Finanzierungsplan

CP - Collaborative project (generic)

Koordinator

TEKNOLOGIAN TUTKIMUSKESKUS VTT OY
EU-Beitrag
€ 920 053,00
Adresse
TEKNIIKANTIE 21
02150 Espoo
Finnland
Region
Manner-Suomi Helsinki-Uusimaa Helsinki-Uusimaa
Aktivitätstyp
Research Organisations
Links
Gesamtkosten
Keine Daten

Beteiligte (10)