Leistungen
The output of Task 4.4 will be a document describing and evaluating on construction site data using the image-based technique for identifying discrepancies between as-built and as-planned construction state
Evaluation of experimental results of the novel methodology tested in a controlled environment. The tests done with the software developed and the acoustic methodology created will be reported in this deliverable. The experimental results will be compared with the results obtained from sound insulation measurements done with conventional equipment.
The final targeted user groups will be identified in a very early stage and during the first months of the project the 6 workshops of task 11 with members of the future user groups will be conducted The output of these workshops will be processed and the needs of the future users regarding selfinspection and quality checks will be identified These requirements will be reported in the deliverable D11
A report that describes and explains the step by step methodologies required to implement the selfinspection techniques for Quality Assurance and Compliance to achieve the required standards of energy performance and IEQ In separate sections for each selfinspection technique the report will provide a detailed performance description or story of what the software must do to provide a convenient easy to use experience for the user of the VCM system This is necessary as input to WP6 so that the software developers have a clear description of how the software has to function
The framework of the integrated approach which is described in the deliverable D13 are based on the outcomes of the 6 workshops processed compiled and supplemented by additional information In this report it will also be documented which out of the numerous amount of the elements of the integrated process are selected for the methodology of Virtual Construction Management Platform VCMP The deliverable D13 directly leads to the development of the system architecture D14
Guidelines organisation and planning for pilot test implementation in different worksites
Final comparative and performance assessment of the field test operation by end-users including feedback.
Validation report of the developed method under laboratory conditions and also, in realistic conditions, at pilot site scale and critical analysis.
In the deliverable D12 which is a report the methodology will be described how the mismatch between planned energy performance and the performance at commissioning stage due to the construction process can be assessed This methodology will be dealing with those parts of the construction process which are being seen as highly influencing the energy performance if not executed as planned
A report defining and describing the characteristics of the data that is required as evidence of compliance with the relevant standards for each self-inspection technique and quality check procedure.
Proposal of IAQ indicatorsIn this report will be described a group of indicators allowing qualifying indoor air quality on the basis of the parameters monitored by the sensor The indicators development will increase the visibility of the results for the workers and the users This development will be based on our knowledge of indoor ambiances regulatory values guide values and health values Plus a thinking will be lead on the use and display of these indicators related to the IAQ interface development following task
Report of acoustic methodology developed for in situ sound insulation measurements with mobile devices and indoor positioning A methodology for the application of these devices to sound insulation measurements and acoustic maps generation will be developed and reported in this deliverable
In this deliverable the detailed specifications for the IAQ interface and for the BIM platform will be described This interface will have an informative role on the presentation of IAQ results but also interactive functions making possible an exchange with the users Especially this platform will propose recommendations or corrective actions according to the IAQ observed results
Description of the different models developed in this task: Wall model, inverse model to determine the building thermal parameters from TIR and direct model to study the impact of actual materials on the building energy balance. Output of task 2.1 and Task 2.2
The characterization of the source will be done in an anechoic room In addition a set of reverberation time measurements in buildings and sound insulation measurements will be done to evaluate the level of noise generated by this source
The output of Task 43 will be a demonstration and report of a prototype of on site 3D model capture with a consumer mobile device
Different plug-ins and iOS apps will be tested and compared with standardized measurements made according to ISO regulation. The uncertainty associated with the use of microphones class 2 in mobile devices and assess will be quantified and the reliability of the information generated in the acoustic measurements performed with these microphones will be evaluated.
Summary of non intrusive instrumentation based on imagery techniques usable in construction sector and benchmark of existing mobile systems. Output of Task 2.1 and part of Task 2.3.
This report will describe the improved BIM technology with different new features like object level non BIM data linking IFC GUIDs integrity workflow and on site mobile usage from BIM tools in the cloud This report is a direct output of Task 45
An efficient method for identifying leakage pathways when using the airtightness tester In this deliverable the most efficient method for identifying the leakage pathways between pulse tests will be evaluated and a methodology developed
Output of Task 4.1 with photo evidence of prototypes and reporting on the modelling developed in Task 4.2
User manuel documents and pedagogic materials for training end users testing the system on the worksites
A free version of the Virtual construction Management platform will be demonstrated at an dissemination event aimed at the stakeholder community.
The project website will be designed and built including project Intranet for the consortium An initial press release highlighting the project will be issues to community stakeholders and partners for further dissemination The website will be continuously updated and press releases be repeated across the project
Output of tasks 4.5 and 4.6.This will include new BIM software open source tools improvements development within the project and will be provided to the BIM community to disseminate the new innovations in the industry
General Communication material on the project will be developed for use at dissemination events websites workshops etc for all of the project partners This will be updated across the project lifetime
A list of the Minimal Survey Data Set which can be efficiently captured to satisfy each selfinspection technique and quality check procedure and test
Veröffentlichungen
Autoren: Daniele Bortoluzzi, Andrea Costa, Sara Casciati
Veröffentlicht in: Proceedings, 1/7, 2017, Page(s) 640, ISSN 2504-3900
Herausgeber: MDPI
DOI: 10.3390/proceedings1070640
Autoren: Magdalena Hajdukiewicz, Jamie Goggins
Veröffentlicht in: Engineers Journal, 2015-07-28, 2015, ISSN 0332-1711
Herausgeber: Engineers Journal
Autoren: Magdalena Hajdukiewicz
Veröffentlicht in: Engineers Journal, 2015-10-13, 2015, ISSN 0332-1711
Herausgeber: Engeeners Journal
Autoren: Shane Newell, Jamie Goggins
Veröffentlicht in: Engineers Journal, 11.04.2017, 2017, ISSN 0332-1711
Herausgeber: Engineers Ireland
Autoren: Shane Newell, Jamie Goggins
Veröffentlicht in: Proceedings of the Institution of Civil Engineers - Structures and Buildings, 170/12, 2017, Page(s) 885-900, ISSN 0965-0911
Herausgeber: ICE Publishing
DOI: 10.1680/jstbu.16.00198
Autoren: Marc Arnela, Oriol Guasch, Patricia Sánchez-Martín, Joan Camps, Rosa Alsina-Pagès, Carme Martínez-Suquía
Veröffentlicht in: Sensors, 18/12, 2018, Page(s) 4317, ISSN 1424-8220
Herausgeber: Multidisciplinary Digital Publishing Institute (MDPI)
DOI: 10.3390/s18124317
Autoren: Jamie Goggins, Paul Moran, Alan Armstrong, Magdalena Hajdukiewicz
Veröffentlicht in: Energy and Buildings, 116, 2016, Page(s) 622-637, ISSN 0378-7788
Herausgeber: Elsevier BV
DOI: 10.1016/j.enbuild.2016.01.016
Autoren: Shane Newell, Jamie Goggins, Magdalena Hajdukiewicz
Veröffentlicht in: Journal of Structural Integrity and Maintenance, 1/4, 2016, Page(s) 147-155, ISSN 2470-5314
Herausgeber: Taylor & Francis
DOI: 10.1080/24705314.2016.1240525
Autoren: Paul Moran, Jamie Goggins, Magdalena Hajdukiewicz
Veröffentlicht in: Energy and Buildings, 139, 2017, Page(s) 590-607, ISSN 0378-7788
Herausgeber: Elsevier BV
DOI: 10.1016/j.enbuild.2017.01.029
Autoren: Magdalena Hajdukiewicz
Veröffentlicht in: Global Magazine of the Concrete Society, 24.03.2017, 2017, ISSN 0010-5317
Herausgeber: The Concrete Society
Autoren: Marc Arnela, Patricia Sanchez-Martın, Marcos Hervas, Joan Camps, Oriol Guasch, Carme
Martınez-Suquıa and Rosa-Maria Alsina-Pages
Veröffentlicht in: Proceedings of NOVEM 2018, November 2018, 2018, Page(s) 175945 - 1-11
Herausgeber: La Salle - Universitat Ramon Llull on behalf of NOVEM International Organizing Committee
Autoren: Vega Pasos, Alan; Zheng, Xiaofeng; Sougkakis, Vasileios; Gillott, Mark; Meulemans, Johann; Samin, Olivier; Alzetto, Florent; Smith, Luke; Jackson, Stephen; Wood, Christopher J.
Veröffentlicht in: Smart Ventilation for buildings, 18.09.2018, 2018
Herausgeber: AIVC
Autoren: Vega Pasos, Alan; Zheng, Xiaofeng; Sougkakis, Vasileios; Gillott, Mark; Meulemans, Johann; Samin, Olivier; Alzetto, Florent; Smith, Luke; Jackson, Stephen; Wood, Christopher J
Veröffentlicht in: Smart ventilation for buildings, 08.08.2018, 2018
Herausgeber: AIVC Conference
Autoren: Edward Cooper, Xiaofeng Zheng, Christopher Wood, Mark Gillot, David Tetlow, Saffa Riffat, Lia De Simon
Veröffentlicht in: Effective ventilation in high performance buildings, 2015-09-23, 2015
Herausgeber: Air infiltration and ventilation centre
Autoren: Andrea Costa, Daniele Bortoluzzi, Germain Adell
Veröffentlicht in: EeB PPP Project Review 2015 - 5th edition of the EeB PPP - Project funded Review, 2015-12-20, 2015
Herausgeber: EeB PPP
Autoren: D. Bortoluzzi, F. Noris, A. Costa, T.B. Messervey, G. Adell, C. Cantau and Julien Roquette
Veröffentlicht in: Procedia – Environmental Science, Engineering and Management - issue 3, vol.2/ 2015 of Procedia-ESEM, 2015-11-03, 2015
Herausgeber: Procedia Environmental Sciences
Autoren: Andrea Costa1, Germain Adell2, Angel Font Fernandez3, Daniele Bortoluzzi1 and Thomas Brian Messervey1 1 R2M Solution Srl - Via Fratelli Cuzio, 42 – Polo Tecnologico di Pavia – 27100 Pavia (PV) - Italy 2 Nobatek - Rue de Mirambeau 67 - 64600 Anglet - France 3 Eurecat - Av. Universitat Autònoma, 23 - 08290 Cerdanyola del Vallès - Spain
Veröffentlicht in: Proceeding of the 12th REHVA World Congress: volume 8, 22.05.2016, 2016, Page(s) Proceeding of the 12th REHVA World Congress: volume 8
Herausgeber: REHVA World Congress
Autoren: Shane Newell, Jamie Goggins, Magdalena Hajdukiewicz, Dave Holleran
Veröffentlicht in: Proceedings of the Civil Engineering Research in Ireland Conference (CERI 2016), 29.08.2016, 2016
Herausgeber: Civil Engineering Research in Ireland Association
DOI: 10.13025/s8ms34
Autoren: Oscar De La Torre, Shane Newell, Michael Flanagan, Jamie Goggins
Veröffentlicht in: Proceedings of the Civil Engineering Research in Ireland Conference (CERI 2016), 29.08.2016, 2016
Herausgeber: Civil Engineering Research in Ireland Association
Autoren: Magdalena Hajdukiewicz, Jamie Goggis, Marcus Keane
Veröffentlicht in: Proceedings of World Sustainable Energy Days (WSED2017) – Young Researchers Conference, 01.03.2017, 2017
Herausgeber: World Sustainable Energy Days (WSED2017)
DOI: 10.13025/s88c7d
Autoren: Magdalena Hajdukiewicz, Jamie Goggins
Veröffentlicht in: Global Magazine of the Concrete Society, September 2015, 2015-09-11, 2015, Page(s) 54-55
Herausgeber: The Concrete Society, UK
Autoren: Magdalena Hajdukiewicz
Veröffentlicht in: NUI Galway News & Events, 09.05.2017, 2017
Herausgeber: NUI Galway