A new standard for LNG Fueling Coupling (ISO) has been developed and is being reviewed by the ISO group. Investigation on filling process (1d, 3d simulations) as well as on spraybar layout has been done in order to provide valuable input for the development and layout of the tank development. Definition of system layout, its interfaces and of system requirements has been done. Base tank system with pump compatibility has been developed including Low, medium and high pressure system. Tank and pump systems have been provided to the OEM partners and integrated into the vehicles. A Novel aftertreatment system has been developed for dedicated lean natural gas application which reduces the impact of ageing on the methane oxidation catalyst. Dedicated SCR catalyst has been specified for lean NG application due to exhaust temperature window (higher exhaust temperatures than Diesel) and minimized N2O formation. A sulphur removal strategy has been developed to maintain high efficiency of methane oxidation catalyst.
1D and CFD simulation of stoichiometric and lean burn concepts has been performed. Single cylinder testing testing has been done in order to select the hardware for the multi cylinder testing. Both concepts have been tested on the multi cylinder engines. All targets have been achieved (GHG reduction of -10%, range of >800km) except the pollutant emissions compliance to EU VI. Benchmarking was done in order to get an understanding of the performance of current products. A specific dual fuel ECU has been developed. A SPI system has been adapted to the engine and tested and later on a MPI system. Combustion CFD work was done in order to define possible hardware for the single cylinder testing, followed by single cylinder testing in order to select the best hardware for the multi cylinder testing. The multi cylinder tests included a full calibration (steady state and transient) which was finished by supervised testing from TÜV showing emission compliance to EU VI. Also the GHG target of -20 has been reached, actually overachieved. Pems tests have been performed on another vehicle (not HDGAS) with the same technology showing emission compliance also in the vehicle. (-22%) The range requirement of 800km has been achieved with large margin (1172 km).
The procedure for the independent testing for emission compliance has been defined as well as the procedure for GHG reduction demonstration and range calculation. Pems testing was done with a Volvo vehicle with similar specification of the system as HDGAS and showed emission compliance leading to the conclusion that the HDGAS vehicle also would have shown emission compliance. The cost assessment for the main concepts has been developed and are all showing a direct amortization. The payback period for the IVECO vehicle amounts to 1,4 years, the MAN one to 4,6 and the Volvo to 1,7 years. Payback periods below 2 years are usually a qualifier for acceptance at the OEMs
A Final event has taken place in Turin Italy (150 people from 55 companies and 14 different countries attended).
The positive ignited concept has overachieved the targets in terms of CO2 reductions, especially the lean burn concept as well as the range fulfilment. Due to irregularities of the injectors emissions compliance with EU VI could only be demonstrated partly. The involved partners are confident that proper working injectors would have ensured emission compliance.
The dual fuel concept has overachieved the target of range before refuelling. However, additional efforts would need to be taken in order to achieve emission compliance as well as the targeted CO2 reductions.
The HPGI concept has fulfilled / overachieved all targets (emission compliance to EU VI, CO2 reduction of 22% and range fulfilment of almost 1200km)
All the results have been disseminated.