Risultati finali Websites, patent fillings, videos etc. (9) Promotional material Press releases, articles, leaflets, videos, social media campaign. Month 12 batch. Promotional material (update 3) Promotional material. Press releases, articles, leaflets, videos, social media campaign. Month 48 batch. Project website Development of a multipurpose project website for widespread communication, but also as share-point for the consortium. Promotional material (update 1) Press releases, articles, leaflets, videos, social media campaign. Month 24 batch. Guided visits to demo sites Report gathering the guided visits for stakeholders (architects, engineers, construction sector professionals, students, etc.) to PVSITES demonstration installations, performed during months 30-42. Guidelines for project’s visual identity Specific information and related materials to inform the partners about the rules to be applied for coherent and consistent presentation of project communications. Promotional material (update 2) Press releases, articles, leaflets, videos, social media campaign. Month 36 batch. Training courses for installers Report gathering all the onsite training sessions for installers at the project demonstration sites performed in order to transfer the generated know-how to this key actor in the BIPV value chain. At least one training session in each demo site. Webinars for BIPV product portfolio Webinars for relevant stakeholders on the different formats and possibilities of the product portfolio. Documents, reports (35) Design pack for every demo site The deliverable will include a guide for architectural integration of the BIPV products in every demo site, guide for commissioning and maintenance, installation guides, guide for electrical integration and available operation strategies, control strategies for each demo site. Health, safety and security procedures. Lessons learnt in PVSITES BIPV installation process: acceptance, drivers and barriers Description of the difficulties encountered in executing the demonstrators, in particular those related to the acceptance and use of the BIPV elements (as opposed to normal construction elements). Results of modelling at element and building level, CIGS products Optical, thermal, mechanical and electrical simulation reports at element level. The aim is to generate part of the information needed to show compliance with building codes and standard and extract conclusions which might lead to re-design needs. At building level, simulation of energy efficiency, lighting (for semitransparent curved CIGS elements) and all parameters determining the optimal architectural integration as a function of building typology, location, etc. The project demo buildings will also be simulated with two purposes: (1) to select the optimum implementation for the product and have a first feedback on expected performance levels and (2) to validate the software output data with the results coming from the demo installations. Guidelines and recommendations for replicability of PVSITES approach Starting from the analysis in deliverable 8.16, a complete and specific set of guidelines and recommendations for the replicability of PVSITES products, approaches and actions will be gathered to support further steps towards market deployment of the demonstrated products and technologies. Results of installation and commissioning for every demonstration site Report gathering all the processes followed and their corresponding results for the successful consecution of the demonstration installations, matching the timing and quality-related objectives of the project. Formulation of architectural and aesthetical requirements for the BIPV building elements to be demonstrated within the project 3D representation of architectural and aesthetical specifications regarding colour, transparency levels, integration aspects, etc. Dissemination and communication plan The dissemination and communication plan sets the most appropriate strategies for dissemination and communication, in line with the strategies for exploitation of results. To be updated in months 12, 24, 36. Annual report on held events (update 2) Month 36 update Annual report on held events Project related dissemination in major relevant conferences and other events by project partners. First version. To be updated in months 24, 36 and 42. Specific monitoring plan for every demo site Specific actions that need to be conducted in each pilot site and will be designed according to key parameters depending on pilot site configuration (BIPV technologies implemented, location of the BIPV implementation,etc.). 8 Structure, contents and operation mechanisms of BIPV products portfolio (update 3) Final version of the documents, containing the updates related to the results of the demonstration activities. Structure, contents and operation mechanisms of BIPV products portfolio (update 2) Month 36, final version. Energy audit of buildings and identification of BIPV possibilities in every demo site For every building site, an energy analysis will be done to identify the thermal and electrical real behavior of the buildings and their interactions with their districts. The deliverable will include 2-3 pre-dimensioning possibilities for every demo site, including the description of total surfaces of BIPV and storage installation. Training courses on the BIPV software tool Report gathering the results on the training courses on the BIPV software tool, performed during project implementation. Dissemination and communication plan (update 1) Month 12 update European climate zones and bio-climatic design requirements Formulation of requirements attending to European climate zones and bio-climatic design considerations. These requirements will consider comfort, indoor climate, heating, cooling and daylight specifications as a function of climatic zones. Dissemination and communication plan (update 2) Month 24 update Structure, contents and operation mechanisms of BIPV products portfolio (update 1) Month 24 update Common monitoring guidelines Activities and technical requirements that must be completed and met to successfully achieve the monitoring and assessment tasks at building and BIPV system level. Standardization needs Summary report on main current legislative standards in place needed standardization activities prior to marketization of the innovative products and tests needed for market introduction Result of modeling and BIPV strategies for every demo site The description of every pre-dimensioning will be analyzed through the BIPV modeling tool developed in WP7, with the support of TRNSys and Modelica for installations. Results will include real layouts and operation results of the new systems in the demo sites, as well as heat/cool/electricity load charts (energy demand) for a whole year of usual operation of every building. Installation and execution of monitoring of BIPV systems Completion of the installation of the monitoring equipment and start of BIPV systems monitoring process. Structure, contents and operation mechanisms of BIPV products portfolio The deliverable will define the technical information needed for each product: PV technology, nominal power, possible architectural applications, customization, life cycle, price, etc. As for operation mechanisms, it will describe a search tool able to select the optimum product at project design level; as well as preliminary production estimates as a function of location, orientation, tilt, etc. to facilitate a first evaluation of economic viability of the BIPV products. To be updated in months 24 and 36. Annual report on held events (update 1) Month 24 update Report on the baseline assessment of the demo sites Target buildings will be monitored for one year period prior to the retrofitting. This will allow to establish the energy consumption baseline to compare the new consumptions after renovation and then for assessing the energy savings. Annual report on held events (update 3) Month 48 update Regulatory framework Summary report providing and overview of relevant current and foreseen legislation regarding renewables, grid and buildings and their implications for the BIPV market. Second revision of detailed project management plan This deliverable will contain the second version of the project management plan, updated after 27 months of project execution. Revision of detailed project management plan This deliverable will contain the second version of the project management plan, updated after 15 months of project execution. Recommendations on storage systems for BIPV systems Justification in terms of costeffectiveness of the selected PV storage topology and technology for each of every single use case categorized in task 22 at least 6 use cases Quality management plan The quality management plan will include an updated, detailed project management plan, Gantt chart and Work Breakdown Structure. It will display at least a schedule per task, responsible partner, related subtasks, related deliverables and dependencies to other tasks. Revisions of the project management plan will be made on month 15 and month 27. Market and stakeholder analysis Summary report on market and stakeholder analysis and trends including market potential/challenges and expected desirable benefits for different stakeholders. NZEB building concepts for the application of BIPV building elements Collection of BIPV related concepts reaching the NZEB level. Dissemination and communication plan (update 3) Month 36 update Report on simulation work, c-silicon based BIPV elements Optical, thermal, mechanical and electrical simulation reports at element level. The aim is to generate part of the information needed to show compliance with building codes and standard and extract conclusions which might lead to re-design needs. At building level, simulation of energy efficiency, lighting and all parameters determining the optimal architectural integration as a function of building typology, location, etc. The project demo buildings will also be simulated with two purposes: (1) to select the optimum implementation for the product and have a first feedback on expected performance levels and (2) to validate the software output data with the results coming from the demo installations. Demonstrators, pilots, prototypes (11) Prototypes of framing systems compatible with XL-formats and large thickness BIPV units Mechanical aspects and hidden wiring strategies elucidated for large dimension BIPV units (up to 4,5x2,5 m). Roofing tiles and façade elements prototypes with 10%-14% efficiency modules of 0.5x1 m2 and 1x1 m2 area 10%-14% efficiency CIGS modules implemented as BIPV roofing tiles and façade elements with no performance loss. Prototypes for demo sites – first batch The manufacturing of prototypes for demo sites has been divided in two batches to allow the manufacturers coping with this request in reasonable times. The content and distribution between batches will be a result of the project development. Samples for indoor validation tests, c-Si based products Complete manufacturing, according to specifications, of all the samples needed for the indoor validation tests of c-Si based products. Operational prototypes, see-through back contact solar cells Laminated glass units with back contact solar cells. Module efficiency 16% measured by solar simulator at 35% light transmission. Samples for validation testing, CIGS elements Completed manufacturing, in accordance with specifications, of all the CIGS-based roofing and façade elements for testing process. Prototypes for demo sites – second batch Second and last group of prototype products for the demonstration installations. Curved CIGS glass elements Prototypes of curved CIGS glass elements complying with specifications and protocols defined for testing. Operational prototypes with hidden busbars and L-interconnections Fully opaque laminated glass units with hidden busbars and L interconnections with no performance loss. Large area roofing and façade elements of 0.5x2-3 m2 or 1x2-3 m2 using 10%-14% efficiency modules 10%-14% efficiency CIGS modules implemented as large area BIPV roofing and façade elements with no performance loss. Prototypes for test benches and experimental building Manufacturing of the necessary samples for test benches (CIGS curved glass) and commercial installation (CIGS roofing elements) completed. Other (7) BIPV product portfolio Implementation of the BIPV products portfolio from WP2 in a physical format and an online catalogue, as well as implementation of a tool for preliminary assessment of the products in the portfolio. E-catalogs delivery (update 1) Updated information on the BIPV products incorporated as corresponding BIM objects. First prototype of web services platform First version of web service model defined and implemented. Second prototype of BIPV simulation tool It will include building description, accurate description of building elements, occlusion elements, heating/cooling differentials computed on specific areas of the building, impact on natural lighting. E-catalogs delivery Containing BIM objects representing PVSITES products. Prototype of BIPV simulation tool, first version Hourly amount of solar income on the building and separate elements. Hourly PV production. Heating and cooling deltas. Pre-commercial version of web services platform User friendly interfaces implemented, updates after optimization process. Pubblicazioni Other (17) PVSites, l’avenir du photovoltaïque Autori: Agnieszka Bogucka (VILOGIA) Pubblicato in: Métropoles - Newsletter, 2016 Editore: VILOGIA Lecole Hoteliere de Geneve est fiere de ses panneaux solaries en façade Autori: Fédération des Entreprises Romandes Genève Pubblicato in: Fédération des Entreprises Romandes Genève, 2020 Editore: Fédération des Entreprises Romandes Genève Energia pulita in tutti gli edifici grazie ai pannelli solari fotovoltaici efficienti e belli da vedere Autori: Il Fatto Pubblicato in: Press article in il Fatto Quotidiano, 2019 Editore: il Fatto Quotidiano EKZ Solar Carport: Thin-film modules undegoing practical testing Autori: FLISOM Pubblicato in: Press release at Schweizer am Wochenende, 2019 Editore: Schweizer am Wochenende Will new BIPV technologies finally see the concept go mainstream? Autori: Kathryn Porter Pubblicato in: Watt-logic - press article, 2017 Editore: Watt-logic Building integrated photovoltaics – Europe's next wave of renewables? Autori: Engerati Pubblicato in: Engerati - press article, 2017 Editore: Engerati Solar technology brings Europe closer to nearly-zero energy buildings Autori: EC Pubblicato in: Results in Brief. Results for Pack on Harnessing Solar Power, 2019 Editore: EC - CORDIS Onyx Solar en la nueva fachada fotovoltaica de Tecnalia Autori: Interempresas media Pubblicato in: Interempresas.net - press article, 2019 Editore: Interempresas media Onyx Solar fostering knowledge and innovation in Europe Autori: ONYX SOLAR Pubblicato in: ONYX Newsletter 55, 2016 Editore: ONYX OVERVIEW | Building integrated photovoltaics (BIPV) as a viable option among renewables Autori: EC Pubblicato in: Press release at BUIL UP portal, 2019 Editore: EC - BUILD UP See-Thru Back-Contact Solar Cells / BIPV solution Autori: Elena Rico Pubblicato in: State-of-the-art and SWOT analysis of building integrated solar envelope systems, 2019 Editore: IEA SHC DOI: 10.18777/ieashc-task56-2019-0001 Neuartiger Solar-Carport als tail eines EU-Forschungsprogramms Autori: Der Landbote Pubblicato in: Der Landbote - press article, 2019 Editore: Der Landbote Le développement durable dans le secteur de la construction trouve sa source à Anglet Autori: Fabien Jans Pubblicato in: SudOuest website, 2016 Editore: SudOuest website PVSITES: tetti e facciate fotovoltaici, chiamarli pannelli è riduttivo Autori: R2M /Tom's hardware Pubblicato in: Tom's Hardware - press article, 2019 Editore: Tom's Hardware PVSITES, a new innovation challenge for Onyx Solar Autori: ONYX SOLAR Pubblicato in: ONYX Newsletter 49, 2016 Editore: ONYX Una economía baja en carbono requiere una integración a gran escala de productos fotovoltaicos en la edificación Autori: Maider Machado Pubblicato in: TECNALIA website - press article - FOTOPLAT website, 2016 Editore: TECNALIA - FOTOPLAT Integración de tecnología solar fotovoltaica en elementos constructivos de la edificación, BIPV Autori: Interempresasmedia Pubblicato in: Interempresas portal - press article, 2020 Editore: Interempresas media Conference proceedings (12) Best practices for the architectural design of building-integrated photovoltaics in Europe Insights and demonstration cases from the PVSITES project Autori: Tjerk Reijenga, Maider Machado, Eduardo Roman, Dominique Deramaix, Philippe Alamy, Nguyen Van Khai, Pascale Brassier Pubblicato in: Proceedings of Grand Renewable Energy 2018 Conference, 2018 Editore: Grand Renewable Energy 2018 Conference Optimized Building Integrated Photovoltaic solutions for large scale market deployment – PVSITES Project Autori: Vicente Velasco (ONYX SOLAR) Pubblicato in: Proceedings from the 16th International Conference on Sustainable Energy Technologies (SEP 2017), 2017 Editore: Conference on Sustainable Energy Technologies PVSITES software tools for BIM-based design and simulation of BIPV systems Autori: Philippe Alamy Pubblicato in: Proceedings from 13th Conference on Advanced Building Skins, 2018, ISBN 978-3-9524883-4-8 Editore: Advance Building Skins C-Si photovoltaics integrated in buildings - PVSITES experience Autori: Teodosio del Caño (ONYX) Pubblicato in: Proceedings from the 12th Advanced Building Skins Conference (ABS), 2017 Editore: Advanced Building Skins PVSITES: Supporting large-scale market uptake of Building-Integrated Photovoltaic technologies Autori: Ingrid Weiss, Maider Machado, Simon Challet, Eduardo Roman Pubblicato in: 2018 IEEE 7th World Conference on Photovoltaic Energy Conversion (WCPEC) (A Joint Conference of 45th IEEE PVSC, 28th PVSEC & 34th EU PVSEC), 2018, Page(s) 0650-0653, ISBN 978-1-5386-8529-7 Editore: IEEE DOI: 10.1109/pvsc.2018.8547471 BIM based software tools for the design and simulation of building-integrated photovoltaic systems Autori: Philippe Alamy, Van Khai Nguyen, Maider Machado, Ingrid Weiss Pubblicato in: Full paper for the VIII International Congress on Architectural Envelopes, 2018 Editore: International Congress on Architectral Envelops Supporting Market Uptake of Building-Integrated Photovoltaic Technologies with the PVSITES Project Autori: M. Machado, S. Challet, I. Weiss, E. Román Medina, J.M. Espeche, F. Noris, T. Reijenga, E. Rico, I. Huerta, Y.B. Assoa, F. Burgun, J.C. Esteban, J. Escribano Troncoso, P. Alamy, V.K. Nguyen Pubblicato in: Proceedings from the 33rd European Photovoltaic Solar Energy Conference and Exhibition (EUPVSEC), 2017, ISBN 3-936338-47-7 Editore: European Photovoltaic Solar Energy Conference and Exhibition DOI: 10.4229/eupvsec20172017-7dv.1.29 BIM a Driver for Energy Transition and BIVP Adoption Autori: Van Khai Nguyen, Maider Machado Pubblicato in: Proceedings of EuroSun 2018, 2018, Page(s) 1-10, ISBN 978-3-9820408-0-6 Editore: International Solar Energy Society DOI: 10.18086/eurosun2018.11.12 BIM – A Booster for Energy Transition and BIPV Adoption Autori: P. Alamy, V.K. Nguyen, E. Saretta, P. Bonomo, E. Román Medina, J.M. Vega de Seoane, P. Alonso Pubblicato in: Proceedings EU PVSEC 2019, 2019, ISBN 3-936338-60-4 Editore: Proceedings EU PVSEC 2019 DOI: 10.4229/eupvsec20192019-6do.8.6 Demonstration of a Novel Low Concentration and Solar Control Photovoltaic System for Building Integration Autori: D. Valencia, M. Machado, A. Sanz Martinez, Y.B. Assoa, F. Burgun, J. Escribano Troncoso, E. Rico, T. Reijenga, P. Brassier, P. Surguy, L. Chan, V. Francisco, P. Alonso, I. Weiss Pubblicato in: Proceedings EU PVSEC 2019, 2019, ISBN 3-936338-60-4 Editore: Proceedings EU PVSEC 2019 DOI: 10.4229/eupvsec20192019-6do.8.4 NUEVOS AVANCES EN EL DESARROLLO DE PRODUCTOS DE INTEGRACIÓN FOTOVOLTAICA PARA EDIFICIOS SOSTENIBLES Autori: David Martín; Elena Rico; Teodosio del Caño Pubblicato in: Greencities. Convocatoria de Comunicaciones Científicas, Issue 1, 2016 Editore: Greencities DOI: 10.5281/zenodo.3938948 DEMONSTRATING NOVEL BUILDING INTEGRATED PHOTOVOLTAIC TECHNOLOGIESWITH THE PVSITES PROJECT Autori: Maider Machado, Ingrid Weiss, Simon Challet , Van Khain Nguyen Philippe Alamy, Ricardo Alonso, José M. Vega de Seoane, Federico Noris, Elena Rico, Tjerk Reijenga, Pascale Brassier, Paul Surguy(8), Victor Francisco, Julian Perrenoud, Henry Delgado, Françoise Burgun, José Carlos Esteban, Dominique Déramaix, Agnieszka Bogucka Pubblicato in: EUPVSEC 2018 - Conference in the Plenary session, 2018 Editore: EUPVSEC Non-peer reviewed articles (3) PV Sites: intègrer le photovoltaique dans le logement social Autori: VILOGIA Pubblicato in: Mosaiques magazine (VILOGIA internal newspaper), 2019, ISSN 2114-2793 Editore: Mosaique Magazine PVSITES: Building-Integrated Photovoltaic Technologies and Systems for Large-Scale Market Deployment Autori: Juan Manuel Espeche, Federico Noris, Zia Lennard, Simon Challet, Maider Machado Pubblicato in: Proceedings, Issue 1/7, 2017, Page(s) 690, ISSN 2504-3900 Editore: MDPI DOI: 10.3390/proceedings1070690 La innovación en la integración de fotovoltaica hará posibles edificios de consumo energético casi nulo (NZEB) Autori: EDUARDO ROMÁN, ANA ISABEL HUIDOBRO, JAVIER DEL POZO, PACO CANO Pubblicato in: Energetica21, Issue 1, 2020, Page(s) 38-40, ISSN 1577-7855 Editore: OMNIMEDIA S.L. DOI: 10.5281/zenodo.3939040 Peer reviewed articles (2) On the analytical calculation of the solar heat gain coefficient of a BIPV module Autori: T. Baenas, M. Machado Pubblicato in: Energy and Buildings, Issue 151, 2017, Page(s) 146-156, ISSN 0378-7788 Editore: Elsevier BV DOI: 10.1016/j.enbuild.2017.06.039 Advancing BIPV in Europe Autori: Dr. Maider Machado; Jose M. Vega de Seoane; Dr. Francoise Burgun; Dr. Ya Brigitte Assoa; Simon Challet Pubblicato in: PV Tech Power Volume 15, 2018, ISSN 2057-438X Editore: Solar Media Ltd DOI: 10.5281/zenodo.3938972 È in corso la ricerca di dati su OpenAIRE... Si è verificato un errore durante la ricerca dei dati su OpenAIRE Nessun risultato disponibile