The Maritime industry is in a frantic search for ways to design and operate marine vessels that generate less CO2 and further modify the existing fleet to reduce emissions. The shipping industry alone accounts for 4% of the EU greenhouse gas emissions. Presented situation has propelled the implementation of Hybrid Propulsion Systems (Hybridization) at a large scale which offers significant reductions in fuel consumption, lower maintenance costs and emissions for today’s marine industry.
PerMarDrive represents an innovative approach in providing Parallel Hybrid Marine Propulsion Systems (MPS) with a solution that includes TEMA patent protected Permanent Magnet AC motor (PMAC) coupled with an integrated clutch drive-
The overall objective is to build, demonstrate and deliver an integrated PMAC-clutch controlled drive for Parallel Hybrid MPS applications that range up to 1500kW electric (kWe) which matches our full PMAC product range.
This is a summary report of the Feasibility study carried by TEMA for the PerMarDrive project. Phase 1 of the PerMarDrive project focused on 6 main objectives:
1.To conduct an assessment and quantification any risks, including mitigation of technical, financial, commercial, management, legislative and political risks that could affect the project’s success and come up with a contingency plan.
2.To conduct a global market study detailing key customers, market size and conduct competitor analysis across the largest MPS markets.
3.To conduct a partner search and form collaborations with potential distribution and supply chain partners in the maritime propulsion systems industry, and have access to global markets.
4.To optimize the system capabilities according to results from user engagement and feedback from an independent validation process and further assert its fitness for purpose in 2 months.
5.To reinforce the product with additional patents within 6 months and beyond by developing an Innovation Management Strategy to document Legal and Intellectual Property (IP) issues associated with our solution, as may originate from insights gained through user engagements in our target markets.
6.To develop a comprehensive business plan including a project risk assessment to update and refine our existing business plan into a comprehensive document with a 5 year outlook consolidating our feasibility study activities and add a detailed work plan.