Skip to main content
Vai all'homepage della Commissione europea (si apre in una nuova finestra)
italiano it
CORDIS - Risultati della ricerca dell’UE
CORDIS

Disruptive process for the construction of railway transition zones, reducing drastically construction and maintenance costs

Obiettivo

When a train crosses from an embankment area (soil) to a bridge, tunnel, viaduct or box culvert, there is an abrupt change in support conditions (strength and hardness, also known as vertical stiffness). Trying to to deal with these changes, that accelerate track degradations and generate vibrations, the embankment at the approaches to these concrete structures (transition zones) are designed and constructed differently compared to the rest of the track, using cement-treated soil to constitute a wedge shaped backfill. The construction process of current solution is complex, uncertain and time-consuming for construction companies.

Besides, the change of vertical stiffness is still not solved with present construction processes. This makes that maintenance needs of transition zones are up to 6 times higher than regular tracks being an additional cost for railway infrastructure managers (mainly public companies). It is estimated that annually 471M€ (10% European investment in track maintenance) is allocated to maintenance operations in transition zones, while these only account for 2,8% of the network length.

TORRESCAMARA has developed DIGITALIA, an innovative solution for transition zones based on precast concrete slabs that properly smooth vertical stiffness and maintain this performance over time, with the aim of: 1) Simplifying, speeding up and reducing costs of the construction process, as DIGITALIA is 60% cheaper than current solutions while taking just 10% of time 2) Reducing maintenance operations needed (equaling regular track needs) and costs, while increasing track availability for train operating companies, 3) Reducing the associated vibrations to improve passenger comfort.

Looking at Europe only, DIGITALIA opens the way to a market worth nearly 140 M€ by the 5th year.

In Phase 1, we will focus on the elaboration of a comprehensive business plan that ensures a quick market deployment through the development of a demonstration element in Phase 2.

Campo scientifico (EuroSciVoc)

Programma(i)

Argomento(i)

Meccanismo di finanziamento

SME-1 - SME instrument phase 1

Vedi tutti i progetti finanziati nell’ambito di questo schema di finanziamento

Invito a presentare proposte

(si apre in una nuova finestra) H2020-SMEInst-2014-2015

Vedi tutti i progetti finanziati nell’ambito del bando

Coordinatore

TORRESCAMARA Y CIA DE OBRAS SA
Contributo netto dell'UE
€ 50 000,00
Indirizzo
CL FONTETA DE SORIA 4 OLIVA
46780 VALENCIA
Spagna
PMI
Sì
Regione
Este Comunitat Valenciana Valencia/València
Tipo di attività
Private for-profit entities (excluding Higher or Secondary Education Establishments)
Collegamenti
Costo totale
€ 71 429,00