Periodic Reporting for period 3 - PJ14 EECNS (Essential and Efficient Communication Navigation and Surveillance Integrated System)
Periodo di rendicontazione: 2019-01-01 al 2019-12-31
• Optimised ATM Network services
• Advanced air traffic services
• High-Performing airport operations
• Enabling aviation infrastructure
PJ14 EECNS in order to act as a single entity, and to pursue its defined objectives, in an unambiguous manner, has provided itself with a transversal solution: PJ14.01.01 which provides CNS evolution roadmap and strategy and addresses the evolution of CNS applications with integrated view of the three domains.
ML1 V1 Gate for solution 14-01-01 EUROCONTROL 08/10/2019
ML2 TRL4 Gate for solution 14-02-01 FRQ(FSP) 17/10/2019
ML3 TRL4&TRL6 for solution 14-02-02 THALES AIR SYS 27/11/2019
ML4 TRL4 Gate for solution 14-02-04 FRQ(FSP) 15/10/2019
ML5 V2 Gate for solution 14-02-04 FRQ(FSP) 15/10/2019
ML7 V2 Gate for solution 14-02-05 DFS 24/10/2019
ML8 TRL6 Gate for solution 14-02-06 LDO 19/11/2019
ML9 TRL4 Gate for solution 14-03-01 INDRA 07/11/2019
ML10 V2 Gate for solution 14-03-02 Honeywell SAS 22/10/2019
ML11 TRL2 Gate for solution 14-03-04 DLR(AT-ONE) 29/10/2019
ML12 TRL4 Gate for solution 14-03-04 DLR(AT-ONE) 29/10/2019
ML13 TRL4 Gate for solution 14-04-01 EUROCONTROL 10/10/2019
ML14 TRL4 Gate for solution 14-04-03 THALES AIR SYS 30/10/2019
ML16 Gate for IRIS precursor Multilink Result THALES AIR SYS 03/06/2019
ML17 ATN IPS Equipment Availabilty THALES AIR SYS 28/06/2019
Following main deliverables delivered in the reporting period are:
PJ14 - WP01 D1.2 Final Project Report
PJ14 - WP02 D2.1.030 CNS evolution roadmap and strategy v3 TRL2
PJ14 - WP02 D2.1.040 CNS robustness study v1 TRL2
PJ14 - WP02 D2.1.080 GNSS core constellations monitoring v1 TRL2
PJ14 - WP02 D2.1.090 Civil-Military CNS information exchange requirements v1 TRL2
PJ14 - WP02 D2.1 - 14-01-01-V1 Data Pack TRL2
PJ14 - WP02 D2.2.020 Functional requirements - PB CNS v2 TRL2
PJ14 - WP03 D3.3.030-Updated LDACS A/G Specification TRL4
PJ14 - WP03 D3.4.020-Final LDACS Deployment Options and Recommendations TRL4
PJ14 - WP03 D3.2.030-Final TS-IRS TRL4
PJ14 - WP03 D3.1.030-TVALR TRL4
PJ14 - WP03 D3.1.040-Updated TVALP defining the validation roadmap for phase V3 TRL4
PJ14 - WP03 D3.8-FRD for LDACS A/A Mode (for TRL2 Gate) TRL4
PJ14 - WP03 D3.9-TVALP for LDACS A/A Mode defining the validation roadmap for TRL4 (for TRL2 Gate) TRL4
PJ14 - WP03 D3.6.020-Final LDACS Standardization and Global Harmonization Report TRL4
PJ14 - WP04 D4.1.010 SATCOM OSED V2
PJ14 - WP04 D4.1.020 SATCOM SPR V2
PJ14 - WP04 D4.1.030 TS-IRS (V2) V2
PJ14 - WP04 D4.1.040 SATCOM INTEROP V2
PJ14 - WP04 D4.1.050 SATCOM CBA V2
PJ14 - WP04 D4.1.060 SATCOM Class A VALP V2
PJ14 - WP04 D4.1.090 SATCOM VALR – Class A V2
PJ14 - WP04 D4.2.100 SATCOM VALR Class B V3
PJ14 - WP05 D5.3.020 Technical Validation Plan (TVALP)
PJ14 - WP05 D5.3.040 Technical Validation Report (TVALR)
PJ14 - WP05 D5.3.050 Technical Validation Plan (TVALP) defining the validation roadmap for phase V3(TRL6)
PJ14 - WP05 D5.3 - 14.02.04-V2 Data Pack
PJ14 - WP05 D5.4.010 Technical Requirements (TS/IRS)
PJ14 - WP06 D6.3.010 SPR-INTEROP/OSED V2
PJ14 - WP06 D6.3.020 Validation Plan V2
PJ14 - WP06 D6.3.021 Validation report (V2)
PJ14 - WP06 D6.3.070 Initial V3 VALP
PJ14 - WP06 D6.3 - 14-02-05-V2 Data Pack
PJ14 - WP06 D6.4.010 TS/IRS (V2)
PJ14 - WP06 D6.4.030 CBA V2
PJ14 - WP07 D7.1.020 TVALP
PJ14 - WP07 D7.1.030 TVALR
PJ14 - WP07 D7.1 - 14.2.6-V3 Data Pack
PJ14 - WP07 D7.3.010 - Final TS/IRS
PJ14 - WP08 D8.1.020-14-03-01-V2-TVALR
PJ14 - WP08 D8.1.070 V3 Roadmap TVALP
PJ14 - WP08 D8.1 - 14-03-01-V2 Data Pack
PJ14 - WP08 D8.2.010-14-03-01-TS-IRS (V2)
PJ14 - WP08 D8.2.010-V2 Final TS/RS
PJ14 - WP08 D8.5.010-FRD (V1) ESV
PJ14 - WP08 D8.5.020 TVALR (V1) ESV
PJ14 - WP08 D8.5.030 Roadmap TVALP (V2) ESV
PJ14 - WP08 D8.5-14-03-01-Partial-V1-Data Pack
PJ14 - WP08 D8.8.010-TVALP GAST F
PJ14 - WP08 D8.8.020-TVALR GAST F
PJ14 - WP08 D8.8.040-TS/IRS GAST F
PJ14 - WP08 D8.8.060-TVALP Roadmap V2/TRL4
PJ14 - WP08 D8.9.020-Safety/Security Assessment
PJ14 - WP08 D8.9.040-Roadmap TVALP V2
PJ14 - WP08 D8.9-14-03-01-V1-Data-Pack
PJ14 - WP09 D9.1.020 - V2_TS/IRS - GNSS MC/MF Final
PJ14 - WP09 D9.1 - 14-03-02-(V2) Data pack
PJ14 - WP09 D9.2.030 - V2_CBA - MC/MF SBAS GNSS Final
PJ14 - WP09 D9.2.070 - V2_TVALP - GNSS MC/MF Final
PJ14 - WP09 D9.2.080 - V2_TVALR - GNSS MC/MF Final
PJ14 - WP09 D9.2 - 14-03-02-(V2)
PJ14 - WP10 D10.1.01 FRD for the V1 data Pack
PJ14 - WP10 D10.1.02 Technical Validation Plan (TVALP)
PJ14 - WP10 D10.1 - Data Pack V1
PJ14 - WP10 D10.2.01 Technical Validation Plan (TVALP)
PJ14 - WP10 D10.2.03 Technical Validation report (TVALR)
PJ14 - WP10 D10.2.04 Final Technical Validation Plan (TVALP)
PJ14 - WP10 D10.2.05 Technical specifications / Interface Requirements Specifications (TS/IRS)-V2
PJ14 - WP10 D10.2 - Data Pack V2
PJ14 - WP10 D10.3.01 Final Technical Requirements (TS/IRS) – V3
PJ14 - WP10 D10.3.02 Econonmical Appraisal and or CBA for V3
PJ14 - WP10 D10.5 - Data Pack V3
PJ14 - WP11 D11.1.070 Verification Report
PJ14 - WP11 D11.1.080 Technical Verification Plan defining the Verif. Roadmap for V3
PJ14 - WP11 D11.1.090 Verification Plan
PJ14 - WP11 D11.1.110 Verification Report
PJ14 - WP11 D11.1.120 Technical Verif. Plan V2 defining verif. Roadmap for V2
PJ14 - WP11 D11.1 - 14-04-01-V2 Data Pack
PJ14 - WP11 D11.2.040 Update TS/IRS
PJ14 - WP11 D11.2.050 Functional Requirements Definition
PJ14 - WP11 D11.3 - 14-04-01 V1 Data Pack
PJ14 - WP12 D12.1.170 TVALP
PJ14 - WP12 D12.1.190 TVALR
PJ14 - WP12 D12.1.200 Updated TVALP
PJ14 - WP12 D12.1 - 14-04-03-V2 Data Pack
PJ14 - WP12 D12.2 - 14-04-03-TS-IRS (V2)
• Consortium Requested Amendment AMD-734168-53
Technical Impact
Main impact is in general on the integrated approach of the three domains. CNS as unique entity and not as three separated domains as seen in the past. PJ14 has developed this idea through its solutions, based on the support of the PJ14.01.01 an integrated CNS suites able to provide a mature and consolidated CNS evolution, full addressing the vision, the strategy and the roadmap agreed.
Economic Impact
A reduction of the costs based on the rationalization of the CNS structures can be reflected in beneficial impact on all the actors involved up to the final users.
Social Impact
The social impact of the whole project 14 can be considered very positive, as all solutions provide innovative results. In other words, the state of the art for CNS developments has been produced in a connected way by all stakeholders. This, without any doubt, can bring benefits to the whole European community by leading it towards a dominant position in the ATM technology market.
As a consequence, this will create new opportunities and growth of European companies, with the creation of new job opportunities.