Risultati finali
Description of demonstration actions carried out in Tasks 2.3 (Integration of Energy Infrastructures and buildings), 2.4 (Integration of local RES & Mobility through ICT) & 2.5 (Others).
"New smart actions: Evolution of citizens app ""La Mia Trento""" (si apre in una nuova finestra)D8.7 Final report on training sessions through the smart Cities Academy. (si apre in una nuova finestra)
E-learning platform to disseminate on-line training sessions such as webinars, video-lessons, providing technical material in Smart Cities concept, renewable energy, e-mobility and ICT tools for smart cities (Task 8.4.3)
D4.6 Report on the electric vehicle models to address both intra-urban and extra-urban (si apre in una nuova finestra)Market study of Evs for urban & extra-urban transport (Subtask 4.4.1)
D9.6 Six monthly Progress Reports (si apre in una nuova finestra)Progress reports (Task 9.3 including summary of 9.4 & 9.5 activities)Due Date (in months): M7, M13, M19, M25, M31, M37, M43, M49, M55, M60
New smart actions: indoor IAQ, safaty & parking smart solutions (si apre in una nuova finestra)D6.6 Monitoring strategy beyond STARDUST (si apre in una nuova finestra)
Monitoring strategy after STARDUST conclussion
Eguillor Water Treatment Plant Hydrothermal-PV pilot project results (si apre in una nuova finestra)Monitoring results of the pilot project that will integrate a heat pump with the water supply (hydrothermal energy) and a PV on the roof. Scope: 0 energy climatization of the office/labs building.
D4.5 Recommendations and guidelines on optimized integration of the electric mobility in the local energy system through energy storage at urban level. (si apre in una nuova finestra)Lessons learnt in the integration of Evs and local grid, using energy storage at urban level
D6.7 Impact assessment of Lighthouse cities (si apre in una nuova finestra)Final impact assessment of lighthouse cities
D5.3 Report on capacity building and knowledge exchange activities (si apre in una nuova finestra)Report of 16 workshops in four areas: planning and coordination, KPI, citizen engagement and social innovation & business modelling including legal/market/regulatory barriers (Task 5.3). Due Date (in months): M24 + annual update
D5.6 Report on stakeholder and citizen engagement activities (si apre in una nuova finestra)Description of the interaction of STARDUST and the affected citizens in the follower cities
D1.7 Report on requirements and architecture for the open city information platform FBK (si apre in una nuova finestra)STARDUST Model for Open City Platform (Task 1.9) based on lighthouse cities
D2.1 Pamplona Pilot Detailed Plan (si apre in una nuova finestra)Smart Action Plan for Pamplona integrating all demo actions in coordination with the local partners & stakeholders (Task 2.2)
D7.4 Development, test and validation of innovative business models and financial schemes on Lighthouse Cities (si apre in una nuova finestra)Alternative proposals for business models looking for synergies and aiming at finding replicaple models (Task 7.4)
D1.3 Report of availability of local /renewable energy sources in situ and potential use in lighthouse and follower cities (si apre in una nuova finestra)Energy supply strategy (Task 1.4) in lighthouse and follower cities
D9.1 Project Management Plan (si apre in una nuova finestra)Project management plan summarizing all the required knowledge for the good management of the project (in terms of administrative forms, financial aspects, quality process, etc.) (Task 9.1) Due Date (in months): M2, M18, M33
D4.1 Trento Pilot Detailed Plan (si apre in una nuova finestra)Smart Action Plan for Trento integrating all demo actions in coordination with the local partners & stakeholders (Task 4.2)
Design and operation of bus electric charge stations including energy storage support and renewable generation (si apre in una nuova finestra)Performance of the UPNA Microgrid (PV+energy storage) connection to the bus electric charging station (Subtasks 2.4.6 and 2.4.7).
D3.4 Hackathon - STARDUST challenge - results and the implementation report (si apre in una nuova finestra)Report on the results of the hackathons organized by the City of Tampere in line with the STARDUST goals with regards to the e-bus & tram.
D9.4 Annual Quality Assurance report. Pamplona-Tampere-Trento (si apre in una nuova finestra)The quality of the implementation of the demonstration measures in each pilot will be followed during the different steps of the project (Subtask 9.4.1)Lead Beneficiary: PAM-TAM-TREDue Date (in months): M13, M25, M37, M49, M60
D6.4 Collaboration plans and protocols for data exchange with the SCIS (si apre in una nuova finestra)Knowledge share and integration of STARDUST performance data with other european initiatives (Task 6.3)
D7.1 Living Labs activities report in each Lighthouse (si apre in una nuova finestra)Activation of living labs in the lighthouse cities (Task 7.1.4)Due Date (in months): M18, M48
D2.7 Report on technical, social and economic solutions with validated business plans (si apre in una nuova finestra)Global STARDUST Business Model for Pamplona out of the complilation of the business models for each intervention, evaluating the economic & social impact, main economic indicators and the analysis of potential synergies.
D6.5 Baseline on Impact assessment of Lighthouse cities (si apre in una nuova finestra)Impact assessment before the implementation of the lighthouse projects
D3.1 Tampere Pilot Detailed Plan (si apre in una nuova finestra)Smart Action Plan for Tampere integrating all demo actions in coordination with the local partners & stakeholders (Task 3.2)
D2.6 Potential of Sewage & Water Network for heating public buildings in Pamplona for Replication (si apre in una nuova finestra)Research of heat transfer capacity on sewage & water networks to evaluate the exploitation potential for integrated Heat Pumps heating Pamplona Public buildings (Subtask 2.4.4)
D5.4 Consolidated report of business models for follower cities (si apre in una nuova finestra)Comparative analysis of lighthouse & follower cities to assess the replication potential of business models (Task 5.4)
D6.3 Implementation of the STARDUST monitoring protocol and Data Management Plan (si apre in una nuova finestra)Implementation of D6.2
New smart actions: Tampere-Finland APP with personal carbon trade & NaaSMaaS program (si apre in una nuova finestra)New smart actions: Tampere-Finland APP with personal carbon trade & NaaSMaaS program
D3.5 Midterm report on implemented actions in Tampere (Energy efficient ICT data center on task 3.3.2; heating and cooling by RES on task 3.3.3, IoT case: Green light optimisation 3.5.2) (si apre in una nuova finestra)Description of demonstration actions carried out in Tasks 3.3 (Integration of Energy Infrastructures and buildings), 3.4(Integration of local RES & Mobility through ICT) & 3.5 (Others).
D6.1 Definition of impact assessment indicators and assessment methodology (si apre in una nuova finestra)Definition of impact assessment indicators and assessment methodology
D7.3 Business models and KPIs analysis and validation for Lighthouse Cities interventions (si apre in una nuova finestra)Analysis and validation of business models and follow up of KPIs for lighthouse cities interventions (Task 7.3)
D3.3 Midterm report on implemented actions in Tampere (Dynamic, demand based adjustment of energy use by BEMS on task 3.3.1, e-transport & mpact of EVs on the grid on task 3.4, IoT cases: Smart street poles and LED lighting task on task 3.5.1) (si apre in una nuova finestra)Description of demonstration actions carried out in Tasks 3.3 (Integration of Energy Infrastructures and buildings), 3.4(Integration of local RES & Mobility through ICT) & 3.5 (Others).
D8.10 Report of collaboration with other projects activities (si apre in una nuova finestra)Integration in smart city networks and cooperation with other city projects (Task 8.6)Due Date (in months): M30, M60
D9.2 Project Management Handbook (si apre in una nuova finestra)Project management plan summarizing all the required knowledge for the good management of the project (in terms of administrative forms, financial aspects, quality process, etc.) (Task 9.1)
D4.3 Midterm report on implemented actions: Madona Bianca nZEB, District Heating, RES and urban mobility plan, shared ICT booking system for the car-sharing, Impact of EVs in the electricity grid. (si apre in una nuova finestra)Description of demonstration actions carried out in Tasks 4.3 (Integration of Energy Infrastructures and buildings), 4.4(Integration of local RES & Mobility through ICT) & 4.5 (Others).
D7.2 Entrepreneurship Discovery Process results report (si apre in una nuova finestra)Involvement of stakeholders in a structured inclusive and interactive bottom-up process in order to produce information about potential new entrepreneurial activites (Task 7.2)
D7.5 Exploitation strategies and business plans for the project results (si apre in una nuova finestra)Identification of exploitable results, assessment of the market potential and evaluation of the IPR to draft exploitation plans (Task 7.5)Due Date (in months): M12, M24, M30, M54
D1.2 Report on Smart City level in lighthouse and follower cities (si apre in una nuova finestra)"Smart City level assessment based on a diagnosis toolkit (Task 1.3) to evaluate the energy demand & supply, electro-mobility, energy efficiency and ""smartness"" of buildings and urban infrastructures "
D8.8 Final report on Dissemination and Communication activities (si apre in una nuova finestra)Analysis of the impacts generated via the implementation of the dissemination, communication and replication strategies adopted by STARDUST
D1.4 Portfolio on smart city integrated solutions (si apre in una nuova finestra)Set of SMART integrated solutions (energy, mobility, buildings & ICT) out of local analysis and SCIS
D8.9 Report on Monitoring and Impact Assessment of D&C activities (si apre in una nuova finestra)Analysis of the impacts generated via the implementation of the dissemination and communication strategy
D6.2 Specifications for STARDUST monitoring protocol and Data Management Plan (si apre in una nuova finestra)Consistent format for data collection including specifications for needed datasets, databases visualization platforms and APIs
D1.1 Report on Smart cities key performance indicators (KPI), for the STARDUST cities, with a common metrics and terminology. (si apre in una nuova finestra)Definition of KPI (Task 1.2) to assess the performance of STARDUST in WP6
D4.7 Report on technical, social and economic solutions with validated business plans (si apre in una nuova finestra)Global STARDUST Business Model for Trento out of the complilation of the business models for each intervention, evaluating the economic & social impact, main economic indicators and the analysis of potential synergies.
D1.6 Technical specifications for BEMS and HEMS (si apre in una nuova finestra)Characteristics, common functions and requirements of BEMs & HEMs to be installed in the lighthouse cities (Task 1.8)
D3.6 Report on technical, social and economic solutions with validated business plans (si apre in una nuova finestra)Global STARDUST Business Model for Tampere out of the complilation of the business models for each intervention, evaluating the economic & social impact, main economic indicators and the analysis of potential synergies.
D2.4 Report on implemented actions: District Heating (si apre in una nuova finestra)Description of new district heating (Task 2.3.2)
A simple flyer for multiple stakeholders, based on infographics and images and inviting recipients to visit the website for more detailed information.
D8.2 Website online (si apre in una nuova finestra)The repository of any communications and public contents but also a major distribution channel designed for multiple audiences.
D8.5 Six web videos for each city (si apre in una nuova finestra)Short videos for public communication
D8.4 Short project video (si apre in una nuova finestra)Short web video to present the project, with voice-over in the different languages.
Each Follower City establishes a Deployment Desk composed of representatives of the follwer cities as well as selected market players whose support will be required for future implementation of the replication plans (Task 5.1)
D8.6 Best Practices kit (si apre in una nuova finestra)Packaging of the best practices developed in WP7 in cooperation with the cities
D2.5 Open City Platform working and published OPEN APIs. (si apre in una nuova finestra)Implementation of City Platform with OPEN APIs published
D1.5 STARDUST Decision Making Tools (Cost-Optimal and SC Matrix) (si apre in una nuova finestra)SC Matrix (Task 1.6): Assessment tool for smart technologies in terms of adequacy and usefulness: COST-OPTIMAL (Task 1.7): Cost-optimal study of integrated smar city solutions evaluating energy consumption and global cost.Due Date (in months): M8, M50
Implementation of City Platform based on FI-ware and study of replication potential
D8.1 Dissemination and Communication Plan (si apre in una nuova finestra)The D&C plan based on a impact-enabling approach will be focussed on the replication involving multiple stakeholders, citizens and cities.
D5.2 Stakeholder mapping (si apre in una nuova finestra)Identification of stakeholders (Task 5.6)
D5.5 Refined Replication Plans (si apre in una nuova finestra)Integration of lighthouse cities' solutions into follower cities' replication plans (Task 5.2)
RDMP focuses on the data management life cycle for the data to be collected, processed and/or generated within the project (Subtask 9.4.3)Due Date (in months): M6, M18, M30, M36
Pubblicazioni
Autori:
Matti Pihlajamaa, Maria Merisalo
Pubblicato in:
European Planning Studies, 2021, Pagina/e 1-19, ISSN 0965-4313
Editore:
Carfax Publishing Ltd.
DOI:
10.1080/09654313.2021.1894097
Autori:
Hicham Klaina, Imanol Picallo Guembe, Peio Lopez-Iturri, Jose Javier Astrain, Leyre Azpilicueta, Otman Aghzout, Ana Vazquez Alejos, Francisco Falcone
Pubblicato in:
IEEE Access, Numero 8, 2020, Pagina/e 132382-132396, ISSN 2169-3536
Editore:
Institute of Electrical and Electronics Engineers Inc.
DOI:
10.1109/access.2020.3010032
Autori:
Jesus Daniel Trigo, Hicham Klaina, Imanol Picallo Guembe, Peio Lopez-Iturri, Jose Javier Astrain, Ana Vazquez Alejos, Francisco Falcone, Luis Serrano-Arriezu
Pubblicato in:
IEEE Sensors Journal, Numero 20/23, 2020, Pagina/e 14453-14464, ISSN 1530-437X
Editore:
Institute of Electrical and Electronics Engineers
DOI:
10.1109/jsen.2020.3007593
Autori:
Riccardo Nanni & Maurizio Napolitano
Pubblicato in:
Public Money & Management, 2024, ISSN 0954-0962
Editore:
Blackwell Publishing Inc.
DOI:
10.1080/09540962.2023.2298260
Autori:
Elisa Braco, Idoia San Martín, Alberto Berrueta, Pablo Sanchis, Alfredo Ursúa
Pubblicato in:
Journal of Energy Storage, Numero 32, 2020, Pagina/e 101695, ISSN 2352-152X
Editore:
Elsevier
DOI:
10.1016/j.est.2020.101695
Autori:
Paula Ala-Kotila, Terttu Vainio, Janne Heinonen
Pubblicato in:
Smart Cities, Numero 3/2, 2020, Pagina/e 157-171, ISSN 2624-6511
Editore:
MDPI or Multidisciplinary Digital Publishing Institute
DOI:
10.3390/smartcities3020009
Autori:
Kari Kankaala , Maarit Vehiläinen , Pellervo Matilainen , Pauli Välimäki
Pubblicato in:
TECHNE - Journal of Technology for Architecture and Environment, 2018, Pagina/e 108-114, ISSN 2239-0243
Editore:
Firenze University Press
DOI:
10.13128/techne-23569
Autori:
A. Calms and S.D. de Garayo Balsategui
Pubblicato in:
Journal of Physics: Conference Series, 2600 (2023) 082029, 2023, ISSN 1742-6596
Editore:
CISBAT International Conference 2023 13/09/2023 - 15/09/2023 Lausanne, Switzerland
DOI:
10.1088/1742-6596/2600/8/082029
Autori:
Dayron Armas, Pablo Zubiate, Carlos R. Zamarreño and Ignacio R. Matias
Pubblicato in:
Sensors Letters Vol.:7(8), 2023, ISSN 2475-1472
Editore:
IEEE
DOI:
10.1109/lsens.2023.3301843
Autori:
Diego Viesi, Luigi Crema, Md Shahriar Mahbub, Sara Verones, Roberto Brunelli, Paolo Baggio, Maurizio Fauri, Alessandro Prada, Andrea Bello, Benedetta Nodari, Silvia Silvestri, Luca Tomasi
Pubblicato in:
Energy, Numero 209, 2020, Pagina/e 118378, ISSN 0360-5442
Editore:
Pergamon Press Ltd.
DOI:
10.1016/j.energy.2020.118378
Autori:
I. Lalinde, A. Berrueta, J. Arza, P. Sanchis, A. Ursúa
Pubblicato in:
Applied Energy, Vol ume 354, Part B, 2024, ISSN 0306-2619
Editore:
Pergamon Press Ltd.
DOI:
10.1016/j.apenergy.2023.122205
Autori:
Nives Della Valle, Sonja Gantioler, Silvia Tomasi
Pubblicato in:
Frontiers in Sustainable Cities, Numero 3, 2021, ISSN 2624-9634
Editore:
Frontiers
DOI:
10.3389/frsc.2021.573174
Autori:
R. Ciria and S.D. de Garayo Balsategui
Pubblicato in:
Journal of Physics: Conference Series, 2023, ISSN 1742-6596
Editore:
CISBAT International Conference 2023 13/09/2023 - 15/09/2023 Lausanne, Switzerland
DOI:
10.1088/1742-6596/2600/13/132009
Autori:
Alberto Berrueta, Adrian Soto, Javier Marcos, Inigo de la Parra, Pablo Sanchis, Alfredo Ursua
Pubblicato in:
IEEE Transactions on Industry Applications, Numero 56/5, 2020, Pagina/e 4670-4678, ISSN 0093-9994
Editore:
Institute of Electrical and Electronics Engineers
DOI:
10.1109/tia.2020.3003562
Autori:
Hicham Klaina, Imanol Picallo Guembe, Peio Lopez-Iturri, Jose Javier Astrain, Leyre Azpilicueta, Otman Aghzout, Ana Vazquez Alejos, Francisco Falcone
Pubblicato in:
IEEE Access, Numero 8, 2020, Pagina/e 124688-124701, ISSN 2169-3536
Editore:
Institute of Electrical and Electronics Engineers Inc.
DOI:
10.1109/access.2020.3007597
Autori:
A. Pérez, I. San Martín, P. Sanchis, A. Ursúa
Pubblicato in:
2023
Editore:
IEEE 32nd International Symposium on Industrial Electronics (ISIE)
DOI:
10.1109/isie51358.2023.10227960
Autori:
I. Lalinde, A. Berrueta, A. Soto, J. Arza, P. Sanchis, A. Ursúa
Pubblicato in:
2023
Editore:
IEEE 32nd International Symposium on Industrial Electronics (ISIE)
DOI:
10.1109/isie51358.2023.10228079
Autori:
F. M. González and S. D. de Garayo Balsategui
Pubblicato in:
37th Conference on Design of Circuits and Integrated Circuits (DCIS), 2022
Editore:
IEEE
DOI:
10.1109/dcis55711.2022.9970098
Autori:
Inaki Ojer, Alberto Berrueta, Julio Pascual, Pablo Sanchis, Alfredo Ursua
Pubblicato in:
2020 IEEE International Conference on Environment and Electrical Engineering and 2020 IEEE Industrial and Commercial Power Systems Europe (EEEIC / I&CPS Europe), 2020, Pagina/e 1-6, ISBN 978-1-7281-7455-6
Editore:
IEEE
DOI:
10.1109/eeeic/icpseurope49358.2020.9160716
Autori:
E. Irujo, A. Berrueta, I. Lalinde, J. Arza, P. Sanchis, A. Ursúa
Pubblicato in:
2023
Editore:
IEEE 32nd International Symposium on Industrial Electronics (ISIE)
DOI:
10.1109/isie51358.2023.10227971
Autori:
Vitoria, E.E. Gallego Martínez, S. Melendi-Espina, M. Hernaez, C. Ruiz Zamarreño, I.R. Matías
Pubblicato in:
Sensors Vol.: 23(3), 2023
Editore:
MDPI
DOI:
10.3390/s23031459
È in corso la ricerca di dati su OpenAIRE...
Si è verificato un errore durante la ricerca dei dati su OpenAIRE
Nessun risultato disponibile