The development of a cost effective railway, attractive for its users, is a new paradigm required for competing with the new transport modes and mobility concept.
X2R2 has been aimed at introducing innovative technologies and solutions into some functional blocks of a new generation of a traffic management system. It started the design and the development of:
a) A new Fail-Safe Multi-Sensor Train Positioning (WP3) functional block by applying GNSS, IMU, Digital Map and Radio Localisation technologies to the current ERTMS/ETCS core components for implementing the Virtual Balise concept. It will guarantee the backward compatibility with existing ERTMS systems and the key interoperability requirements.
b) The Safe On-Board Train Integrity (WP4) components to verify autonomously the completeness of the train, detecting the loss of its integrity and the train lenght. These functions are one of the steps for removing the trackside track circuits and axle counters.
c) The use of Formal Methods (WP5) and standardisation to address the challenges to ensure correct behaviour, interoperability, safety, and reliability in rail control systems, given that schedules to deliver such systems are long and unpredictable, and they are costly to procure, develop and maintain.
d) An Advanced Traffic Management System (WP6) that integrates all rail operation track-side based services. Since today, the Data exchange between different applications and business services involved in Traffic Management are not standardized, limiting the integration of data and the automation for decision processes to optimize traffic flow.
In order to introduce new technologies minimizing the impact on ERTMS, preserving its train location & positioning principles, a common view of the Virtual Balise concept was agreed, estimating the train position by a combination of different technologies. The Fail-Safe Train Position specs and functional architecture were defined and described taking into the backward compatibility and interoperability requirements. In addition, a strong collaboration with ESA and GSA European agencies has been settled, fostering the usage of the next EGNOS version as public augmentation network for the sat-based railway applications, improving its development cycle by leveraging on the expertise and needs of railways stakeholders. GSA collaboration also helped WP3 by carrying out the Cost-Benefit Analysis of Satellite Positioning in the railway context. In addition to this stream of WP3 activities, a second stream has been included defining an enhanced safe train positioning subsystem to be consumed by other subsystems. It aimed to develop a SIL4 subsystem that calculates the train travelled distance, speed and absolute position including the analysis and solution of the track discrimination problem. Stream 2 do not include an integration of the output into ERTMS solution.
As far as the On-board Train Integrity is concerned, starting from a state of the art analysis of existing technologies & related products, target scenarios and product classes has been defined. The wireless sensors and transponders technologies have been investigated. The feasibility study included the use of GNSS-based solution for train tail localization. The analysis of installation options considered operational rules. Finally, the specification phase included also the safe train length determination functionality. The demonstration of the achieved WP4 results has been obtained with laboratory tests on prototypes and mock-ups, aimed at verifying and demonstrating right technical choices and to allow the performance analysis.
The analysis of existing Formal Methods was performed focusing the classification of different types of FMs for various uses, including facilitating communication, transparency and collaboration. Moreover, associated survey of FMs in the railway signalling industry was performed. The main use cases for requirement capture, design, development, and verification and validation of railway signalling systems have been defined. They are applied for case studies at the subsystem level, including a variety of different state-of-the-art methods and tools. This will provide results reflecting the potential of FMs at the rail control subsystem level, including the business case perspective. A Level Crossing application area was selected to be used as a basis for the formal methods application, taking into account considerations and trade-offs towards demonstrating the overall project objectives.
With regard to the Traffic Management System (TMS) Evolution, following IN2RAIL2 initial results, progresses were made on system requirement specifications, descriptions of use-cases representing advanced TMS principles and prototypes. Business service applications within a TMS were analysed and the performed activities included: (a) review and complement the required data elements for the Integration Layer, (b) the definition of the system requirement specification for Application Framework and the IF to external clients and services; (c) the development of Key Principles for Design & Test of Prototypes, and of the Key Principles for execution of development and for Design & Test Concepts incl. Report Structure; (d) analysis of applied principles in a TMS, including grouping them into logical clusters and the definition of the list of use-cases to be further elaborated and detailed.
In addition, existing applications for Traffic Management have been benchmarked and together with new functionalities such as ATO a set of use-cases has been developed benefitting from the new technical concepts and representing the base for a future improved and advanced Traffic Management concept.
The WP2 ensured the technical coordination and system coherence between the above technical WPs as well as with the open call projects. It performed a system integration of the deliverables of these WPs, ensuring the technical continuity with X2Rail-1 as with the IP2 Technology Demonstrators (TDs).
The WP2 worked on the functional “Reference Architecture”, including elements coming from the various X2Rail-2 needs, the scope being the overall signalling, control, automation and communication system for railways, covering all the market segments: HS Lines, Low Traffic/Regional Lines, Urban/Suburban and Freight.
Finally worked on the creation of a joint WG between EUG and IP2 about Digital Maps and GNSS Augmentation, and the creation of the Sherpa Group regarding the preparation of the inputs from the CCS TSI (in particular CCS TSI 2022).
Train Position is one of the SIL 4 functions of the ERTMS system. Up to now, none has used the GNSS, IMU, Digital Map and Radio Localization technologies for guaranteeing this SIL 4 function in the ERTMS standard and interoperable constituents.
The On-Board Train Integrity function and its development in accordance with the different installation needs were not addressed before in other R&D projects. A cost effective solution is the main target for supporting the application of ERTMS Level 3 functions.
Control, command and signalling are at the core of railway operations; they essentially determine safety and performance of the network. In this context, a central and innovative traffic management remains significant for network-wide optimisations. The TMS Evolution will enable the definition and implementation of new services and functions and the optimization of existing ones.