The project aimed at developing two new filler wires, one for WAAM and one for LBW, implementing the new Al filler wires in the LBW and WAAM processes.
One of the exploitable outputs of IAWAS are the wires with the new compositions able to be used in the LBW and WAAM. The wire developed for LBW does not contain Lithium but showed good results when considered for LBW of Al-Li sheets. The wire for WAAM showed to be difficult to extrude and drawn.
At the beginning of the project, it was expected to reach TRL 9 and to have a product ready to be commercialized. However, due to the difficulty to extrude and mostly to draw the wires, it is not possible to reach an industrial production of these new wires now. Indeed, due to the large difficulties encountered for the production of these wires, UACE and SelectArc focused on the production of some spools in a non-industrial way (not scalable used processes). Additional drawing steps were needed and, in some cases, the spool was obtained by welding parts of wires together, which would not be conceivable for an industrial production.
At this step, it is not possible to estimate the production costs of these wires in comparison with standard ones. Further developments of the production of Al-Cu-Li wires would be needed to increase the TRL of this process to enable the industrial production. However, the results of the IAWAS project are a good first step in the definition and production of wires made of Al-Li alloys suitable for WAAM and/or LBW processes.
Concerning the WAAM development with Al-Li wires, a start-up company has been formed for exploitation of the developments of WAAM technology from the WAAMMat programme and other activities at Cranfield University. The results from IAWAS feed directly this commercial initiative as a route for exploitation – particularly to inform end-users about the capability for WAAM to produce Al/Li structures using the new developed wire compositions.
For the developments of the LBW with Al-Li alloys, all results (good results and failures) will be exploited in further projects on Sonaca’s and CRM’s side. For all future parts made of Al-Li, an LBW solution could be considered based on the knowledge acquired during the IAWAS project.