Resultado final
The website of the project up and running. Linked T6.2
Dissemination material: Third yearFinal version of the dissemination material.Linked T6.2
Dissemination material: Second yearUpdated version of the dissemination material to include relevants updates according to the project progressLinked T62
Dissemination material: First yearInitial version of the dissemination material including rollup banners leaflets giveaways folders etcLinked T62
Video with the results of the assessment of HEADSTART and an overview of the demonstrationsPresentation of the assessemt results of HEADSTART and video about the demonstrations carried outLinked T43
Evaluation results of application and demonstrationReport with an evaluation of the test method regarding scalability robustness reproducibility and suitability for assessment of functions based on different Key Enabling TechnologiesLinked T42
This deliverable is aimed at identifying the criteria to be used to select the most significant scenarios each KET must be tested against to be implemented in CAD vehicles, together with the tests required to verify their compliance. Linked to T2.3
State of innovation of existing initiatives and gap analysisThe deliverable provides a comprehensive overview of ongoing projects and initiatives It summarises the methodological approach and identifies white spots overlaps and harmonised aspects of validation and testing methodology for CADLinked T11
Dissemination and Communication strategy: reviewUpdate of the dissemination and communication strategy taking advantage of newer opportunities and initial assessment of the effectiveness of the HEADSTART channels to reach specific target audiencesLinked T61
Assessment method for each of the use cases definedReport with the extensions to the basic testing procedure (described in D2.1). Extensions in procedures are expected for assessment of multiple vehicles in a system of systems, communication technology for localization and V2X. Also technology specific test cases will be given in D2.3. Linked T2.4
Report on efforts towards standardisationReport on the efforts to approach standardisation bodies to the HEADSTART results and promote the project outcomes and findingsLinked T63
Functional requirements of selected use casesThe deliverable contains the description of the use cases selected in task 1.4. The deliverable also describes the functional requirements for the selected cases, taking into account different types of AD functions, as well as environmental aspects such as road conditions and country specific issues. Linked T1.4
Assessment criteria of CAD functionalities for consumer testing and type approvalReport with definitions of the criteria to assess CAD functionalities specifically for consumer testing and type approvalLinked T33
HEADSTART networking mid-term reportMid term overview of the status of the activities related to the creation of the network of experts and working groups setup and related activities including workshops for stakeholder consultation consensus building and expert awareness raising carried out within Task 51 and Task 52Linked T51 and T52
HEADSTART networking reportOverview of the creation and management process of the network of experts and analysis of working groups setup and related activities including position consultation consensus building and expert awareness raising items carried out within Task 51 and Task 52Linked T51 and T52
Stakeholders and user group needsDescription of the stakeholders and user groups needs on methodologies, procedures, tools and standards. Linked T1.2
Technical and functional requirements for KETsThis deliverable contains the collected requirements for the relevant KETs such as V2X communication security positioning The requirements will be collected from relevant stakeholders and from the basis of the work to be done in WP2Linked T13
Harmonisation proposals of test resultsDefinition of ways of harmonisation of test results to be used by the target user groups and stakeholders for standardisation and certificationLinked T34
Dissemination and Communication strategyDefinition of the overall strategy and plan for communication and dissemination activities (initial plan). Linked T6.1
Common methodology for test, validation, certification and criteria to allocate scenariosDescription of high level common methodology for HEADSTART for CAD testing and validation Extension of this methodology for KETs Communication CyberSecurity and PositioningLinked T21 and T22
Demonstrated methods and procedures for the selected UCDeliverable 41 describes the test methods and procedures that have been evaluated within WP4 using the requirements set in WP1 The report will show the suitability scalability cost effectiveness and applicability of the methods based on the selected use cases The deliverable will also report on reproducibility of the testsLinked T41
Dissemination and Communication strategy: beyond HEADSTARTA detailed report of all HEADSTART performed communication and dissemination activities will be delivered presenting their overall impactLinked T61 and T63
Specification of test procedure for the selected Use CasesSpecification of the detailed test procedure for testing the different use casesLinked T35
Toolchain for mixed validation - integration of simulation and physical testingSpecifcation of a toolchains representative for testing validation and certification of CADfunctios usergroup specific Coupling of relevant tools to a usable toolchain for the final HEADSTART procedure Development of a use case specific tool ie it can be used to executedemonstrate an actual test case in one of the use cases within the toolchain for testing cyersecurityLinked T32
Guideline of a comprehensive validation and certification procedure to ensure safe CAD systemsGuideline of a comprehensive validation and certification procedure to ensure safe CAD systems which includes harmonization of methodologies and procedures defined in previous WP. Definition and description of a final HEADSTART procedure for testing, validation and certification. Catalouge developed tools for mapping them to the defined procedure. Linked T3.1
It includes the planning of the data management activities for the pool of data that will be collected within the project. The document will outline how the research data collected or generated will be handled during and after a research project. Linked to T7.5
Publicaciones
Autores:
Martin Skoglund;
Anders Thorsén;
Alvaro Arrue;
Jean-Baptiste Coget;
Mohamed-Cherif Rahal;
Camille Plestan
Publicado en:
2021
Editor:
ITS World Congress
Autores:
Weißensteiner, Patrick; Coget, Jean-Baptiste; Eckstein, Lutz; Bracquemond, Annie
Publicado en:
2020
Editor:
Zenodo
DOI:
10.5281/zenodo.5358057
Autores:
Camp, Olaf Op den; van de Sluis, Jacco
Publicado en:
Edición 1, 2020
Editor:
Zenodo
DOI:
10.5281/zenodo.5040361
Autores:
Fredrik Warg; Martin Skoglund; Matthew Sassman
Publicado en:
2021
Editor:
IEEE
DOI:
10.1109/vtc2021-fall52928.2021.9625202
Autores:
Gelder, Erwin de, and Olaf Op den Camp
Publicado en:
2022
Editor:
SSRN
DOI:
10.2139/ssrn.4182806
Autores:
Skoglund, Martin;
Warg, Fredrik;
Hansson, Hans;
Punnekkat, Sasikumar
Publicado en:
2021
Editor:
diva-portal
DOI:
10.1109/vtc2021-spring51267.2021.9448691
Autores:
Burden,Håkan; Sobiech, Cilli; Andersson, Kristina; Skoglund, Martin; Stenberg, Susanne
Publicado en:
2021
Editor:
ITS World Congress
DOI:
10.5281/zenodo.5948927
Autores:
Olaf Op den Camp; Jacco van de Sluis; Erwin de Gelder; Ihsan Yalcinkaya
Publicado en:
2021
Editor:
Zenodo
DOI:
10.5281/zenodo.5040362
Autores:
Adrian Zlocki, Olaf Op den Camp, Álvaro Arrúe, Satoshi Taniguchi, Manabu Umeda, Sandra Watanabe, Jacobo Antona-Makoshi
Publicado en:
2021
Editor:
SIP-adus
Autores:
Itziar Urbieta; Marcos Nieto; Mikel García and Oihana Otaegui
Publicado en:
Appl. Sci., 2021, ISSN 2076-3417
Editor:
Applied Sciences
DOI:
10.3390/app11177782
Autores:
Patrick Weissensteiner, Georg Stettinger, Johannes Rumetshofer and Daniel Watzenig
Publicado en:
Electronics, Edición 20799292, 2022, ISSN 2079-9292
Editor:
Electronics
DOI:
10.3390/electronics11010072
Autores:
Jacco van de Sluis; Olaf Op den Camp; Jeroen Broos; Ihsan Yalcinkaya; and Erwin de Gelder
Publicado en:
Electronics, 2021, ISSN 2079-9292
Editor:
Electronics
DOI:
10.3390/electronics10192362
Autores:
Martin Skoglund
Publicado en:
2022
Editor:
https://www.diva-portal.org/
Buscando datos de OpenAIRE...
Se ha producido un error en la búsqueda de datos de OpenAIRE
No hay resultados disponibles