CORDIS proporciona enlaces a los documentos públicos y las publicaciones de los proyectos de los programas marco HORIZONTE.
Los enlaces a los documentos y las publicaciones de los proyectos del Séptimo Programa Marco, así como los enlaces a algunos tipos de resultados específicos, como conjuntos de datos y «software», se obtienen dinámicamente de OpenAIRE .
Resultado final
This deliverable will summarise all progress and final results for WP3 for task T3.2 and T3.3 concerning the track and track component requirements, design and assessment. This report includes simulation and demonstration related to track and track components show also what TRL level has been reached. It will show what was generated in this WP, the result from this and who has contributed to the results (broken down into activities). It will also show how these results meet the KPIs which were defined for this WP. The report shall include what needs to continue to the work to reach TRL6 and propose further research work. The report will include a gap analysis of IN2TRACK results.
Tunnel and Bridge I2T2 report (se abrirá en una nueva ventana)Final summary report compiling major results, needs for further research in planned project and plan for implementation. Report will be divided into two parts Tunnels and Bridges. Each task above will have a dedicated chapter and subtask leaders will be responsible for reporting of associated work, results and next actions. For this deliverable, the GAP analysis of IN2TRACK will be included.This deliverable will also include:oReview of the existing load models for design and classification of bridges, will be done to some extent as new approach is likely to be developedoA proposal for dynamic load models which cover existing rolling stock depending on speed, axle load and axle arrangement or speed and line category according to EN 15528 5.5.3
Rail Profiling Improvement - The Evaluation of Superabrasive Grinding (se abrirá en una nueva ventana)This deliverable will compare superabrasive rail grinding with conventional grinding in a relevant but controlled environment. The report will build upon the work reported in D3.3 Chapter 5.1.6 to cover the design, construction and use of a test facility to evaluate rail grinding performance. Trials will be designed to capture information on grinding quality and efficiency to allow a comparison between rail grinding methods.
Dissemination and exploitation plan for IN2TRACK2 (se abrirá en una nueva ventana)Report defining the project dissemination communication and exploitation strategies including the events and conferences to be targeted for dissemination opportunities This deliverable will include a first report of task84 activities
Next generation track (se abrirá en una nueva ventana)Report to describe the research carried out into track design, installation, maintenance and monitoring of next generation track solutions. Recommendations will also be made for continuation of work into AWP20. The report will include a gap analysis of IN2TRACK results.
Integration Final Report (se abrirá en una nueva ventana)Report defining the final outcomes of the integrated demonstrators and possible route to market This will include a consolidation of outputs from WPs This deliverable will include the planning and implementation of demo plans
Enhancements to Switch and Crossing System Demonstrated (se abrirá en una nueva ventana)Final summary report compiled from major results and further research efforts necessary to complete WP1. The report will be structured according to the tasks in the WP, while each task leader and subtask leader will be responsible for contributing to the report. The report will reflect the indivisible nature of all necessary tasks to develop, install, operate and access a demonstrator, although they are divided in the WP for the reason of manageability. The report will include a gap analysis of IN2TRACK results
Report: Track and Track Component Maintenance and Asset Management (se abrirá en una nueva ventana)This deliverable will summarise all progress and final results for WP3 for task T3.4, T3.5 and T3.6 concerning the track and track component requirements in terms of maintenance and asset management. This report includes the maintenance actions that include tasks T3.4, T3.5 and T3.6. Detailed descriptions of all simulations and demonstrations performed will also be included. It will also show what TRL level has been reached. It will show what was generated in this WP, the result from this and who has contributed to the results (broken down into activities). Furthermore, it will show how these results meet the KPIs which were defined for this WP. The report shall include what needs to continue to the work to reach TRL6 and propose further research work.
Next Generation Switches & Crossings (se abrirá en una nueva ventana)Deliverable D2.2 will present the detailed next generation switch and crossing technology developments and prototypes (virtual and physical) at component, sub-system and system level. Plans for delivering the final TD3.2 system demonstrator will also be presented alongside recommendations for further work within AWP20 [up to TRL6]. The report will include a gap analysis of IN2TRACK results.
Creation of communications materials to support the JU’s communications strategy (se abrirá en una nueva ventana)Communications and Marketing plan implementation and creation of materials to raise the profile of IN2TRACK2 and the SHIFT2RAIL JU which may include newsletters, presentations, social media accounts and videos.
Mid-term Integration Plan (se abrirá en una nueva ventana)Report summarising the mid-term system integration achievements, activity, relationships, demonstrators and further foreseen development. Plan to be produced to map how the integrated demonstrator will be delivered including interface with relevant Open Calls.
Dissemination and Exploitation activities (se abrirá en una nueva ventana)Report summarising the results/impacts of all the dissemination, communication and exploitation activities. This report will contain a complete summary of task 8.4 activities and achievements.
Publicaciones
Autores:
Mohammadmahdi Abedi, Raul Fangueiro, António Gomes Correia
Publicado en:
Materials, Edición 13/16, 2020, Página(s) 3484, ISSN 1996-1944
Editor:
MDPI Open Access Publishing
DOI:
10.3390/ma13163484
Autores:
R. Borinaga-Treviño, A. Orbe, J. Canales, J. Norambuena-Contreras
Publicado en:
Construction and Building Materials, Edición 246, 2020, Página(s) 118522, ISSN 0950-0618
Editor:
Elsevier BV
DOI:
10.1016/j.conbuildmat.2020.118522
Autores:
Mohammadmahdi Abedi, Raul Fangueiro, Aires Camões, Antonio Gomes Correia
Publicado en:
Construction and Building Materials, Edición 260, 2020, Página(s) 120486, ISSN 0950-0618
Editor:
Elsevier BV
DOI:
10.1016/j.conbuildmat.2020.120486
Autores:
Julio Blanco-Lorenzo, Edwin A.H. Vollebregt, Javier Santamaria, Ernesto G. Vadillo
Publicado en:
Tribology International, Edición 154, 2021, Página(s) 106671, ISSN 0301-679X
Editor:
Pergamon Press Ltd.
DOI:
10.1016/j.triboint.2020.106671
Autores:
Borinaga-Treviño, R., Orbe, A., Canales, J., Norambuena-Contreras, J.
Publicado en:
Construction and Building Materials, Edición 284, 2021, ISSN 0950-0618
Editor:
Elsevier BV
DOI:
10.1016/j.conbuildmat.2021.122832
Autores:
Dimosthenis Floros, Anders Ekberg, Fredrik Larsson
Publicado en:
Wear, Edición 448-449, 2020, Página(s) 203184, ISSN 0043-1648
Editor:
Elsevier BV
DOI:
10.1016/j.wear.2020.203184
Autores:
A. Ramos, A. Gomes Correia, R. Calçada, P. Alves Costa, A. Esen, P.K. Woodward, D.P. Connolly, O. Laghrouche
Publicado en:
Construction and Building Materials, Edición 277, 2021, Página(s) 122245, ISSN 0950-0618
Editor:
Elsevier BV
DOI:
10.1016/j.conbuildmat.2021.122245
Autores:
Mohammadmahdi Abedi, Raul Fangueiro, Antonio Gomes Correia
Publicado en:
Journal of Nanomaterials, Edición 2020, 2020, Página(s) 1-20, ISSN 1687-4110
Editor:
Hindawi Publishing Corporation
DOI:
10.1155/2020/6749150
Autores:
Borinaga- Treviño, R., Cuadrado, J., Canales, J., Rojí, E.
Publicado en:
Journal of Building Engineering, Edición 41, 2021, ISSN 2352-7102
Editor:
Elsevier
DOI:
10.1016/j.jobe.2021.102408
Autores:
X. Li, J.C.O. Nielsen, P.T. Torstensson
Publicado en:
Journal of Sound and Vibration, Edición 463, 2019, Página(s) 114949, ISSN 0022-460X
Editor:
Academic Press
DOI:
10.1016/j.jsv.2019.114949
Autores:
Abedi, M., Gomes Correia, A., Fangueiro, R.
Publicado en:
Transportation Engineering, Edición 6, 2021, ISSN 2666-691X
Editor:
Elsevier
DOI:
10.1016/j.treng.2021.100096
Autores:
Knut Andreas Meyer, Magnus Ekh, Johan Ahlström
Publicado en:
European Journal of Mechanics - A/Solids, Edición 82, 2020, Página(s) 103977, ISSN 0997-7538
Editor:
Elsevier BV
DOI:
10.1016/j.euromechsol.2020.103977
Autores:
Meyer, Knut Andreas
Publicado en:
Modeling and experimental characterization of large biaxial strains and induced anisotropy in pearlitic rail steel, Edición 3, 2019
Editor:
Chalmers University of Technology
Autores:
Pedro Miguel Pereira Martins
Publicado en:
Avaliação do comportamento à fadiga de uma ponte ferroviária metálica, Edición 1, 2020
Editor:
MESTRADO INTEGRADO EM ENGENHARIA CIVIL
Autores:
Li, Xin
Publicado en:
Wheel–Rail Impact Loads and Track Settlement in Railway Crossings, Edición 1, 2019
Editor:
Chalmers University of Technology
Autores:
Roque Borinaga Treviño, Aimar Orbe, Javier Canales, Jesus Cuadrado, Jose Norambuena-Contreras
Publicado en:
Proceedings 17th International Conference on Microwave and High Frequency Heating, 2019, ISBN 9788490487198
Editor:
Universitat Politècnica de València
DOI:
10.4995/ampere2019.2019.9776
Autores:
Allahvirdizadeh, R., Andersson, A. and Karoumi, R.
Publicado en:
ESREL 2021, the 31th European Safety and Reliability Conference, 2021
Editor:
European Safety and Reliability Conference
DOI:
10.3850/978-981-18-2016-8_577-cd
Buscando datos de OpenAIRE...
Se ha producido un error en la búsqueda de datos de OpenAIRE
No hay resultados disponibles