CERTIFIABLE LOCALISATION UNIT WITH GNSS IN THE RAILWAY ENVIRONMENT

CORDIS fornisce collegamenti ai risultati finali pubblici e alle pubblicazioni dei progetti ORIZZONTE.

I link ai risultati e alle pubblicazioni dei progetti del 7° PQ, così come i link ad alcuni tipi di risultati specifici come dataset e software, sono recuperati dinamicamente da .OpenAIRE .

Risultati finali

Preliminary Definition of the System Performances and Interfaces (si apre in una nuova finestra)

It provides the mission definition and requirements for a train localisation unit the preliminary definition of Failsafe multisensor localisation system sub system internal and potential external interfaces the feasibility performances and assessed safety of life level of Failsafe multisensor localisation unit

Final Dissemination Report (si apre in una nuova finestra)

The report presents the project communication and dissemination activities results

Operational Scenarios Definition (si apre in una nuova finestra)

Public document with the definition of scenarios of railway operation, relevant for the project.

Ground Truth (si apre in una nuova finestra)

The ground truth true position of the train generated for the individual test runs will be delivered in an agreed format supplemented by a description on how the ground truth has been generated This will allow the involved parties to reevaluate the collected raw data at a later stage against the true position of the train

Definition of the Required maps for Localisation (si apre in una nuova finestra)

It defines according of the results of the different WPs a comprehensive definition of the digital map for the train localisation system

Identified Validation Certification Methods (si apre in una nuova finestra)

D27 identifies the most suitable methods for validation and certification considering work from WP23 WP 26 and WP27 and taking into account the legal background D27 is the main input for D510 the prototypical certification

High Level Mission Requirements Definition (si apre in una nuova finestra)

Public document with the definition of the high level mission requirements that are the basis for the deviation of high level system requirements.

Project website (continuously updates to M36) (si apre in una nuova finestra)

Public project website including the dissemination of public deliverables.

Raw Data (si apre in una nuova finestra)

The raw data collected with the test trains on a large number of runs over various tracks in different environments will be delivered in agreed formats supplemented by a detailed description on how the data has been collected This will allow the involved parties to reuse the data at a later stage as collecting such data requires major efforts

Project brochure (si apre in una nuova finestra)

Public project brochure

Pubblicazioni

Infrastructure free solution for train positioning using track database

Autori: Philippe Brocard, Raphael Pons, Gabriele Ligorio, Jan Wendel, Alexia Le Quilliec, Antoine Barré
Pubblicato in: ION, Numero September 21 - 25, 2020, 2020
Editore: Philippe Brocard, Raphael Pons, Gabriele Ligorio, Jan Wendel, Alexia Le Quilliec, Antoine Barré

Machine Learning Based Overbound Modeling of Multipath Error for Safety Critical Urban Environment (si apre in una nuova finestra)

Autori: * Carl Milner, ENAC, Université de Toulouse, France * Heekwon No, ENAC, Université de Toulouse, France
Pubblicato in: ION, Numero 2021, 2021, Pagina/e 1-15
Editore: Carl Milner , Heekwon No
DOI: 10.33012/2021.17874