Skip to main content
European Commission logo
Deutsch Deutsch
CORDIS - Forschungsergebnisse der EU
CORDIS
CORDIS Web 30th anniversary CORDIS Web 30th anniversary

Fostering DIHs for Embedding Interoperability in Cyber-Physical Systems of European SMEs

CORDIS bietet Links zu öffentlichen Ergebnissen und Veröffentlichungen von HORIZONT-Projekten.

Links zu Ergebnissen und Veröffentlichungen von RP7-Projekten sowie Links zu einigen Typen spezifischer Ergebnisse wie Datensätzen und Software werden dynamisch von OpenAIRE abgerufen.

Leistungen

D6.1b: Online presence

D61 Online presence M3 M36 will show the setting up of the project website and the different communication channels created to give visibility to the project and their evolution to create awareness around DIH4CPS

D6.6d: Collaboration with other Smart Anything Everywhere projects and Digital Innovation Hubs

This deliverable do the report of the activities planned in the D66a

D6.3b: Dissemination activities

D63 Dissemination activities M12 M24 M36 will contain the main activities performed by all the partners during the project

D6.6c: Collaboration with other Smart Anything Everywhere projects and Digital Innovation Hubs

This deliverable do the report of the activities planned in the D66a

D6.3c: Dissemination activities

D63 Dissemination activities M12 M24 M36 will contain the main activities performed by all the partners during the project

D6.3a: Dissemination activities

D63 Dissemination activities M12 M24 M36 will contain the main activities performed by all the partners during the project

D6.6b: Collaboration with other Smart Anything Everywhere projects and Digital Innovation Hubs

This deliverable do the report of the activities planned in the D66a

D4.11a: A capacity planning solution to optimize workflow to a changing production environment

D411 A capacity planning solution to optimize workflow to a changing production environment M18 M30 The first at M18 describing the preliminary prototype and implementation roadmap and the second at M30 which will document the final prototype and lessons learned The structure of the deliverables will be streamlined for the whole work package

D4.4b: CPS for energy

D4.4: CPS for energy (M18, M30). The first at M18 describing the preliminary prototype and implementation roadmap and the second at M30 which will document the final prototype and lessons learned. The structure of the deliverables will be streamlined for the whole work package.

D4.2b: IoT/CPS for patient services upgrading in Home Healthcare

D4.2: IoT/CPS for patient services upgrading in Home Healthcare (M18, M30). The first at M18 describing the preliminary prototype and implementation roadmap and the second at M30 which will document the final prototype and lessons learned. The structure of the deliverables will be streamlined for the whole work package.

D4.10b: The urban orchard planter prototype

D4.10: The urban orchard planter prototype (M18, M30). The first at M18 describing the preliminary prototype and implementation roadmap and the second at M30 which will document the final prototype and lessons learned. The structure of the deliverables will be streamlined for the whole work package.

D4.11b: A capacity planning solution to optimize workflow to a changing production environment

D4.11: A capacity planning solution to optimize workflow to a changing production environment (M18, M30). The first at M18 describing the preliminary prototype and implementation roadmap and the second at M30 which will document the final prototype and lessons learned. The structure of the deliverables will be streamlined for the whole work package.

D4.8b: Track and trace scheduled product in an open and hostile environment by deploying CPS

D4.8: Track and trace scheduled product in an open and hostile environment by deploying CPS (M18, M30). The first at M18 describing the preliminary prototype and implementation roadmap and the second at M30 which will document the final prototype and lessons learned. The structure of the deliverables will be streamlined for the whole work package.

D4.2a: IoT/CPS for patient services upgrading in Home Healthcare

D42 IoTCPS for patient services upgrading in Home Healthcare M18 M30 The first at M18 describing the preliminary prototype and implementation roadmap and the second at M30 which will document the final prototype and lessons learned The structure of the deliverables will be streamlined for the whole work package

D4.1b: Safe and Sustainable Aquaculture Farming Prototype

D4.1: Safe and Sustainable Aquaculture Farming Prototype (M18, M30). The first at M18 describing the preliminary prototype and implementation roadmap and the second at M30 which will document the final prototype and lessons learned. The structure of the deliverables will be streamlined for the whole work package.

D4.5a: 3D Audio-visual inmersive installation prototype

D45 3D Audiovisual inmersive installation prototype M18 M30 The first at M18 describing the preliminary prototype and implementation roadmap and the second at M30 which will document the final prototype and lessons learned The structure of the deliverables will be streamlined for the whole work package

D4.5b: 3D Audio-visual inmersive installation prototype

D4.5: 3D Audio-visual inmersive installation prototype (M18, M30). The first at M18 describing the preliminary prototype and implementation roadmap and the second at M30 which will document the final prototype and lessons learned. The structure of the deliverables will be streamlined for the whole work package.

D4.7a: CPS for security and wellbeing of shop floor workers

D47 CPS for security and wellbeing of shop floor workers M18 M30 The first at M18 describing the preliminary prototype and implementation roadmap and the second at M30 which will document the final prototype and lessons learned The structure of the deliverables will be streamlined for the whole work package

D4.6b: Food Processing Prototype

D4.6: Food Processing Prototype (M18, M30). The first at M18 describing the preliminary prototype and implementation roadmap and the second at M30 which will document the final prototype and lessons learned. The structure of the deliverables will be streamlined for the whole work package.

D4.8a: Track and trace scheduled product in an open and hostile environment by deploying CPS

D48 Track and trace scheduled product in an open and hostile environment by deploying CPS M18 M30 The first at M18 describing the preliminary prototype and implementation roadmap and the second at M30 which will document the final prototype and lessons learned The structure of the deliverables will be streamlined for the whole work package

D4.9a: Smart and sustainable mobility prototype

D49 Smart and sustainable mobility prototype M18 M30 The first at M18 describing the preliminary prototype and implementation roadmap and the second at M30 which will document the final prototype and lessons learned The structure of the deliverables will be streamlined for the whole work package

D4.4a: CPS for energy

D44 CPS for energy M18 M30 The first at M18 describing the preliminary prototype and implementation roadmap and the second at M30 which will document the final prototype and lessons learned The structure of the deliverables will be streamlined for the whole work package

D4.7b: CPS for security and wellbeing of shop floor workers

D4.7: CPS for security and wellbeing of shop floor workers (M18, M30). The first at M18 describing the preliminary prototype and implementation roadmap and the second at M30 which will document the final prototype and lessons learned. The structure of the deliverables will be streamlined for the whole work package.

D4.9b: Smart and sustainable mobility prototype

D4.9: Smart and sustainable mobility prototype (M18, M30). The first at M18 describing the preliminary prototype and implementation roadmap and the second at M30 which will document the final prototype and lessons learned. The structure of the deliverables will be streamlined for the whole work package.

D4.3a: CPS for personalised interactive Tourist Platform

D43 CPS for personalised interactive Tourist Platform M18 M30 The first at M18 describing the preliminary prototype and implementation roadmap and the second at M30 which will document the final prototype and lessons learned The structure of the deliverables will be streamlined for the whole work package

D4.10a: The urban orchard planter prototype

D410 The urban orchard planter prototype M18 M30 The first at M18 describing the preliminary prototype and implementation roadmap and the second at M30 which will document the final prototype and lessons learned The structure of the deliverables will be streamlined for the whole work package

D4.6a: Food Processing Prototype

D46 Food Processing Prototype M18 M30 The first at M18 describing the preliminary prototype and implementation roadmap and the second at M30 which will document the final prototype and lessons learned The structure of the deliverables will be streamlined for the whole work package

D4.3b: CPS for personalised interactive Tourist Platform

D4.3: CPS for personalised interactive Tourist Platform (M18, M30). The first at M18 describing the preliminary prototype and implementation roadmap and the second at M30 which will document the final prototype and lessons learned. The structure of the deliverables will be streamlined for the whole work package.

D4.1a: Safe and Sustainable Aquaculture Farming Prototype

D41 Safe and Sustainable Aquaculture Farming Prototype M18 M30 The first at M18 describing the preliminary prototype and implementation roadmap and the second at M30 which will document the final prototype and lessons learned The structure of the deliverables will be streamlined for the whole work package

D2.1: DIH Service Catalogue for Ecosystem, Technology, Business Development

D21 DIH Service Catalogue for Ecosystem Technology Business Development

D6.4: Business Participation Report

D64 Business Participation Report M36 will document the efforts and outcome of the business participation encouragement in task 64

D5.2: Report on the Open Calls Execution and Third Parties Management

D52 Report on the Open Calls Execution and Third Parties Management M36

D7.3: Network Business Model Implementation Report

D73 Network Business Model Implementation Report M36

D6.6a: Collaboration with other Smart Anything Everywhere projects and Digital Innovation Hubs

This deliverable addresses the liaison and cooperation activities with other projects that will contribute to the Smart Anything Everywhere and Digital Innovation Hubs initiatives It entails contributions to the following activities The action will support the SAE network and help achieve broad coverage in technological application innovation and geographic terms and to link up with regionalnational innovation initiatives and other Digital Innovation Hubs Its tasks and services shall include maintaining a single innovation portal sharing of best practices dissemination brokering leveraging further investment and training For these support actions close cooperation with ECSEL and other CSAs funded under the Digitising European Industry focus area is looked for Participate to common dissemination events Exploit synergies between projects eg brokering access to facilities offered by the other projects guiding SMEs to the appropriate project sharing of best practices leveraging further investments and training Link to innovation networks eg Entreprise Europe networks National Contact Point networks in order to multiply innovation beyond projects Contribute to a common web portal and a corporate identity without detriment of the individual identity and web site of each project Join forces on dissemination brokerage events eg innovation sectorspecific events Organise regular meetings to assess the cooperation activities Participation to the development of a Digital Innovation Hub Catalogue

D3.3b: Modelling of DIHs network and partners

D33 Modelling of DIHs network and partners M12 M24 M36 will extend the competence ontology with the network partners information

D6.2a: Dissemination strategy and Promotional Materials

D62 Dissemination strategy and Promotional Materials M3 M18 will explain the dissemination approach from a strategic and planning point of view including the objectives the messages and the audience It will also report on the promotional materials created for the various audiences

D3.6: Navigation Interface

D36 Navigation Interface M24 will implement the network navigation interface

D5.4: Report on the Enrolment of Open Call DIHs

D54 Report on the Enrolment of Open Call DIHs M36

D3.4: Modelling of Network Services

D34 Modelling of Network Services M18 will extend the competence ontology with the network services defined in WP2

D2.2: DIH Service Workflows and Customer Journeys

D22 DIH Service Workflows and Customer Journeys M18

D3.2c: Embedded Systems and CPS Competence Ontology

D32 Embedded Systems and CPS Competence Ontology M09 M18 M34 is a formal ontology updated along the project representing the existing and the new knowledge generated by the interoperations on the network representing all the competences of the network related to Embedded Systems and CPS

D3.7a: Interoperability maturity assessment of the DIHs and partners network

D37 Interoperability maturity assessment of the DIHs and partners network M18 M36 will assessment the interoperability requirements of the network

D3.5: Network Navigation Service Design

D35 Network Navigation Service Design M24 will deliver a detailed specification and design for the network navigation services and interface

D3.1: Modelling framework for knowledge creation

D31 Modelling framework for knowledge creation M06 is a report that defines procedures and methods for analysing network competences

D3.7b: Interoperability maturity assessment of the DIHs and partners network

D37 Interoperability maturity assessment of the DIHs and partners network M18 M36 will assessment the interoperability requirements of the network

D3.2a: Embedded Systems and CPS Competence Ontology

D32 Embedded Systems and CPS Competence Ontology M09 M18 M34 is a formal ontology updated along the project representing the existing and the new knowledge generated by the interoperations on the network representing all the competences of the network related to Embedded Systems and CPS

D5.1: Open Gall Guidelines

D51 Open Gall Guidelines M4

D2.4: Methodology Validation in CPS DIHs networks and Recommendations

D24 Methodology Validation in CPS DIHs networks and Recommendations M36

D6.5: Encourage New Partners to participate in the Open Calls

D65 Encourage New Partners to participate in the Open Calls M30 will document the efforts and outcome of the open call partners encouragement in task 65

D6.2b: Dissemination strategy and Promotional Materials

D62 Dissemination strategy and Promotional Materials M3 M18 will explain the dissemination approach from a strategic and planning point of view including the objectives the messages and the audience It will also report on the promotional materials created for the various audiences

D3.2b: Embedded Systems and CPS Competence Ontology

D32 Embedded Systems and CPS Competence Ontology M09 M18 M34 is a formal ontology updated along the project representing the existing and the new knowledge generated by the interoperations on the network representing all the competences of the network related to Embedded Systems and CPS

D3.3a: Modelling of DIHs network and partners

D33 Modelling of DIHs network and partners M12 M24 M36 will extend the competence ontology with the network partners information

D3.3c: Modelling of DIHs network and partners

D33 Modelling of DIHs network and partners M12 M24 M36 will extend the competence ontology with the network partners information

D2.3: DIH Performance Indicators system

D23 DIH Performance Indicators system M24

D6.1a: Online presence

D61 Online presence M3 M36 will show the setting up of the project website and the different communication channels created to give visibility to the project and their evolution to create awareness around DIH4CPS

D7.2: Exploitation and sustainability model

D72 Exploitation and sustainability model M24

D7.1: DIH4CPS Value proposition and generic business model

D71 DIH4CPS Value proposition and generic business model M21

D5.3: Report on the Work Executed by Third Parties in the Open Call Experiments

D53 Report on the Work Executed by Third Parties in the Open Call Experiments M36

Veröffentlichungen

Obstructive Sleep Apnea compliance: verifications and validations of personalized interventions for PAP therapy

Autoren: Selwyn Joymangul, Aicha Sekhari, Alain Chatelet, Olivier Grasset, Nejib Moalla
Veröffentlicht in: 43rd Annual International Conference of the IEEE Engineering in Medicine and Biology Society, 2021
Herausgeber: IEEE

Digital Innovation Hubs supporting SMEs digital transformation

Autoren: Claudio Sassanelli, Hervé Panetto, Sergio Terzi, and Guy Doumeingts
Veröffentlicht in: 27th ICE/IEEE International Technology Management Conference, 2021, ISBN 9781728134017
Herausgeber: HAL archive-ouvertes

Obstructive Sleep Apnea Compliance: Modeling Home Care Patient Profiles

Autoren: Jensen Selwyn Joymangul, Aicha Sekhari, Nejib Moalla, Olivier Grasset
Veröffentlicht in: 2020 IEEE 33rd International Symposium on Computer-Based Medical Systems (CBMS), 2020, Seite(n) 397-402, ISBN 978-1-7281-9429-5
Herausgeber: IEEE
DOI: 10.1109/cbms49503.2020.00082

Towards a Reference Model for Configuring Services Portfolio of Digital Innovation Hubs: The ETBSD Model

Autoren: Claudio Sassanelli, Hervé Panetto, Wided Guedria, Sergio Terzi, Guy Doumeingts
Veröffentlicht in: Boosting Collaborative Networks 4.0 - 21st IFIP WG 5.5 Working Conference on Virtual Enterprises, PRO-VE 2020, Valencia, Spain, November 23–25, 2020, Proceedings, Ausgabe 598, 2020, Seite(n) 597-607, ISBN 978-3-030-62411-8
Herausgeber: Springer International Publishing
DOI: 10.1007/978-3-030-62412-5_49

The Data-Driven Multi-Step Approach for Dynamic Estimation of Buildings’ Interior Temperature

Autoren: Stefano Villa, Claudio Sassanelli
Veröffentlicht in: Energies, Ausgabe 13/24, 2020, Seite(n) 6654, ISSN 1996-1073
Herausgeber: Multidisciplinary Digital Publishing Institute (MDPI)
DOI: 10.3390/en13246654

Suche nach OpenAIRE-Daten ...

Bei der Suche nach OpenAIRE-Daten ist ein Fehler aufgetreten

Es liegen keine Ergebnisse vor