Skip to main content
Weiter zur Homepage der Europäischen Kommission (öffnet in neuem Fenster)
Deutsch Deutsch
CORDIS - Forschungsergebnisse der EU
CORDIS

Large demonstratIoN of user CentrIc urban and long-range charging solutions to boosT an engaging deployment of Electric Vehicles in Europe

CORDIS bietet Links zu öffentlichen Ergebnissen und Veröffentlichungen von HORIZONT-Projekten.

Links zu Ergebnissen und Veröffentlichungen von RP7-Projekten sowie Links zu einigen Typen spezifischer Ergebnisse wie Datensätzen und Software werden dynamisch von OpenAIRE abgerufen.

Leistungen

Saragossa urban area energy model and UC-6 and UC-7 complete solution description (öffnet in neuem Fenster)

This deliverable will collect the main conclusions reached after finalizing the modelling basic and detail engineering and equipment development activities before the deployment of the UC6 and UC7

Paris urban area UC-2 complete solution description (öffnet in neuem Fenster)

This deliverable will collect the main conclusions reached after finalizing the modelling basic and detail engineering and equipment development activities before the deployment of the UC2

Update of Report on user centric EV charging infrastructure (öffnet in neuem Fenster)

Update of DLV35 The Update will be based on the conclusions reached during the Iterative validation loop phase

Tallinn extra-urban area UC-5 complete solution description (öffnet in neuem Fenster)

This deliverable will collect the main conclusions reached after finalizing the modelling, basic and detail engineering and equipment development activities before the deployment of the UC-5.

Future strategies and recommendations to support e-mobility (öffnet in neuem Fenster)

A document including the main conclusions reached thanks to the activities carried out during WP2 will be summarized here. Specifically, the DLV will include propositions to incentivize different categories of users in the use of EVs.

Use cases evaluation from the users' perspective (öffnet in neuem Fenster)

This Report includes bio signal and acceptance studies addressing user experience in real conditions

Proposal for pricing and revenue models in the 7 uses cases (öffnet in neuem Fenster)

Based on D9.4, the price for the services will be here detailed based on the competitive landscape. Additionally, this deliverable will include dynamic pricing strategies.

Mid-term Dissemination and Communication report (öffnet in neuem Fenster)

Update of D101 previously delivered

Project synergies report (öffnet in neuem Fenster)

This deliverable is the outcome of Task 10.3. The main output of this document is to set the basis of the collaborations with the other mobility initiatives and other relevant EU funded projects.

First Update of ICT Data Management Plan (öffnet in neuem Fenster)

First Update of DLV 5.4 The Update will be based on the conclusions reached during the Iterative validation loop phase.

Regulation and standards recommendations on electric infrastructure charging (öffnet in neuem Fenster)

This deliverable will collect a set of specific recommendations for the public authorities of Europe. These recommendations will raise the awareness about the amendments needed in regulation towards the implementation of the most feasible and economical interventions for the EV wide implementation. Additionally, this deliverable will include the conclusions of the overall amendments that shall be done to the European Islands regulation in order to facilitate their transition to a greener environment while preserving the ecosystems

Grid, urban and road infrastructure upgrading for meeting users expectations report (öffnet in neuem Fenster)

This DLV will consist in a report summarizing the developments of WP4 tasks. This DLV will made publicly available the general information of the reference charging solutions there designed.

Final report on communication and dissemination activities (öffnet in neuem Fenster)

Update of D10.5 previously delivered.

Citizens and tourism engagement (öffnet in neuem Fenster)

A final report including all the impressions, acceptance and feedback of the citizens and other local stakeholders, collected during the project activities of the INCIT-EV. This report will show the point of view of the cities´ stakeholders after the execution of the INCIT-EV project.

Final Update of Dissemination and Communication Plan (öffnet in neuem Fenster)

Final Update of Dissemination and Communication Plan previously delivered.

Dissemination and Communication Plan including project identity set (öffnet in neuem Fenster)

This DLV corresponds to Task 10.1. This deliverable explains how the project will communicate its developments and outcomes, and how the consortium will ensure visibility of the project and dissemination of its results throughout its duration. The main outcomes will be a plan identifying a set of dissemination activities to be implemented and a general communication strategy to follow during the project lifetime.

Update of User characterization: patterns and habits (öffnet in neuem Fenster)

An update of DLV 21 will be here included base on the work developed during the first two years of the project

Turin peri-urban area UC-4 complete solution description (öffnet in neuem Fenster)

This deliverable will collect the main conclusions reached after finalizing the modelling basic and detail engineering and equipment development activities before the deployment of the UC4

Use cases value proposition considering the whole ecosystem (öffnet in neuem Fenster)

This DLV will consist on a report including the proposition of the use cases once the whole ecosystem has been considered It will include the definition of the technical architecture of the global system to be designed to highlight how activities and resources are combined to deliver value

First Update of Dissemination and Communication Plan (öffnet in neuem Fenster)

First Update of Dissemination and Communication Plan previously delivered.

Report on user centric EV charging infrastructure (öffnet in neuem Fenster)

This DLV will consist in a report summarizing the developments of WP3 tasks. This DLV will made publicly available the general information of the reference charging solutions there designed.

Zaragoza urban area UC-7 complete solution description (öffnet in neuem Fenster)

This deliverable will collect the main conclusions reached after finalizing the modeling basic and detail engineering and equipment development activities before the deployment of the UC7

Replication potential of technologies in the EU. Action plans for the INCIT-EV cities and TEN-T corridors (öffnet in neuem Fenster)

This DV will propose an ad-hoc action plan for each INCIT-EV city. This Action Plan will include the a) setting-up of the top-level Solutions (Use-Cases) configuration for those that are of interest for each city, among the seven available, b) the description of the setting goals for each city, c) the guided steps that need to be followed to ensure success and d) a rough time plan associated by a preliminary Investment plan.

Amsterdam-Utrecht urban area UC-1 complete solution description (öffnet in neuem Fenster)

This deliverable will collect the main conclusions reached after finalizing the modelling basic and detail engineering and equipment development activities before the deployment of the UC1

ICT Data Management Plan (öffnet in neuem Fenster)

A report including the ICT Data management plan for the data generated during the project.

Users expectations and concerns about e-mobility (öffnet in neuem Fenster)

This report will include the conscious implicit associations and discrete choice analysis on users drivers motives and concerns about EVs

User characterization: patterns and habits (öffnet in neuem Fenster)

The DLV consists of a report including a series of User characterization, patterns and habits.

Versailles extra-urban area UC-3 complete solution description (öffnet in neuem Fenster)

This deliverable will collect the main conclusions reached after finalizing the modelling, basic and detail engineering and equipment development activities before the deployment of the UC-3.

Update of Grid, urban and road infrastructure upgrading for meeting users expectations report (öffnet in neuem Fenster)

Update of DLV46 The Update will be based on the conclusions reached during the Iterative validation loop phase

Final Update of ICT Data Management Plan (öffnet in neuem Fenster)

Second update of DLV 54 and consequently of DLV 510 The Update will be based on the conclusions reached during the Iterative validation loop phase

Demand Scenarios (Roadmap) for the different use cases through PESTEL and estimation of penetration curves (öffnet in neuem Fenster)

Report including penetration curves for the different competing technologies estimated with the consequent stochastic approach through a PESTEL analysis among other methodologies.

LCCA for the 7 use cases (öffnet in neuem Fenster)

Life Cycle Cost Assessment of the use cases that will be demonstrated during the INCIT-EV project. It will include a roadmap to include the expected technology maturity over time.

List of users and stakeholders engaged for the use cases (öffnet in neuem Fenster)

The DLV consists of a report including a list of users to be involved in the activities of the project, especially in the Use cases demonstration activities.

INCIT-EV user interfaces (öffnet in neuem Fenster)

This DLV consists on the designs and system to monitor the performance of the platform and its management

Implementation of INCIT-EV ICT platform (öffnet in neuem Fenster)

Developed INCITEV platform where the ICT developments of the project will be included

Second stage of Implementation of INCIT-EV ICT platform (öffnet in neuem Fenster)

Update of the Developed INCIT-EV platform where the ICT developments of the project will be included. The Update will be based on the conclusions reached during the Iterative validation loop phase.

Second stage of INCIT-EV user interfaces (öffnet in neuem Fenster)

Update of DLV 5.6. The Update will be based on the conclusions reached during the Iterative validation loop phase.

Project visual materials (öffnet in neuem Fenster)

This DLV corresponds to Task 10.2. It will define the style guideline to be used in the material developed during the project, generating among others, the templates, working papers or the promotional materials.

Final Update of Project visual materials (öffnet in neuem Fenster)

Final Update of Project visual materials previously delivered.

Second Update of Project visual materials (öffnet in neuem Fenster)

Second Update of Project visual materials previously delivered.

First Update of Project visual materials (öffnet in neuem Fenster)

First Update of Project visual materials previously delivered.

Project website (öffnet in neuem Fenster)

This deliverable will contain the main features that the website of the INCIT-EV project will contain. Including the release of the website itself.

Veröffentlichungen

Design and analysis for dynamic wireless charging infrastructure in INCIT-EV H2020 project (öffnet in neuem Fenster)

Autoren: Z. Obeid, V. Deniau, A. De Bernardinis, K. Boukir, Z. Meira, G. Salim, G. Fernandez, R. A. Igea
Veröffentlicht in: CIRED Porto Workshop 2022: E-mobility and power distribution systems, 2022
Herausgeber: Institution of Engineering and Technology
DOI: 10.1049/icp.2022.0713

Four-Leg EV Chargers for Grid Supporting (öffnet in neuem Fenster)

Autoren: Antonio Miguel Munoz Javier Ballestin-Fuertes Gregorio Fernandez Daniel Marquina Ricardo Igea
Veröffentlicht in: IEEE Pcim 2022, Ausgabe EVERY YEAR, 2022
Herausgeber: VDE
DOI: 10.30420/565822235

Discrete Choice Experiments to identify user preference for electric mobility (öffnet in neuem Fenster)

Autoren: Davide La Gamba; Miriam Pirra; Francesco Deflorio; Luis Montesano; Angela Carboni; Maurizio Arnone
Veröffentlicht in: 2022 IEEE 46th Annual Computers, Software, and Applications Conference (COMPSAC), Ausgabe 27 June 2022 - 01 July 2022, 2022, ISSN 0730-3157
Herausgeber: IEE
DOI: 10.1109/compsac54236.2022.00270

An Interoperable 50 kW Inductive Power Transfer Design for Opportunity Wireless Vehicle Charging (öffnet in neuem Fenster)

Autoren: Torres-Alfonso, Irene-Maria; Costas-Sos, Carlos; Munoz-Gomez, Antonio-Miguel; Perie-Buil, Juan M.; Bernal-Martinez, Antonio (CIRCE Foundation, Spain) Villa, Juan L.; García-Izquierdo, Oscar (CIRCE Research Institute, University of Zaragoza, Spain)
Veröffentlicht in: PCIM Europe 2023, 2023, ISBN 978-3-8007-6091-6
Herausgeber: VDE
DOI: 10.30420/566091102

Grid Impact of Frequency Regulation Provided by V2Gs Aggregated at HV, MV, and LV Level (öffnet in neuem Fenster)

Autoren: Marta Bernal-Sancho; Roberto Rocca; Gregorio Fernández-Aznar; María Paz Comech; Noemí Galán-Hernández
Veröffentlicht in: IEEE Access,, Ausgabe 24, 2023, Seite(n) Vol 11, Pp 76768-76780 (2023), ISSN 2169-3536
Herausgeber: Institute of Electrical and Electronics Engineers Inc.
DOI: 10.1109/access.2023.3296220

Pavement integration of an inductive charging system for electric vehicles. Results of the INCIT-EV project (öffnet in neuem Fenster)

Autoren: Brahim Mazhoud; Thomas Gabet; Karim Kadem; Zariff Meira; Arnaud Sanzel; Eric Coquelle; Pierre Hornych
Veröffentlicht in: Transportation Engineering, Ausgabe VOL 10 DEC 22, 2022, ISSN 2666-691X
Herausgeber: ELSEVIER ltd
DOI: 10.1016/j.treng.2022.100147

Estimating charging demand by modelling EV drivers' parking patterns and habits (öffnet in neuem Fenster)

Autoren: Macaluso, Piero; Carboni, Angela; Botta, Cristiana; Lazzeroni, Paolo; Deflorio, Francesco; Arnone, Maurizio
Veröffentlicht in: Crossref, Ausgabe 19, 2023, ISSN 1825-3997
Herausgeber: Universita degli Studi di Trieste
DOI: 10.48295/et.2023.90.5

Extracting travel patterns from floating car data to identify electric mobility needs: A case study in a metropolitan area (öffnet in neuem Fenster)

Autoren: Giuseppe Brancaccio; Francesco Paolo Deflorio
Veröffentlicht in: INTERNATIONAL JOURNAL OF SUSTAINABLE TRANSPORTATION, Ausgabe 1, 2022, ISSN 1556-8318
Herausgeber: Taylor and Francis
DOI: 10.1080/15568318.2021.2004629

Design and Experimental Validation of Power Electric Vehicle Emulator for Testing Electric Vehicle Supply Equipment (EVSE) with Vehicle-to-Grid (V2G) Capability (öffnet in neuem Fenster)

Autoren: García-Martínez, E.; Muñoz-Cruzado-Alba, J.; Sanz-Osorio, J.F.; Perié, J.M.
Veröffentlicht in: Advances on Smart Cities and Smart Buildings, Ausgabe Special Ausgabe, 2021, Seite(n) Appl. Sci. 2021, 11(23), 11496, ISSN 2076-3417
Herausgeber: MDPI
DOI: 10.3390/app112311496

Estimation of charging demand for electric vehicles by discrete choice models and numerical simulations: Application to a case study in Turin (öffnet in neuem Fenster)

Autoren: Sica, Lorenzo; Deflorio, Francesco
Veröffentlicht in: Green Energy and Intelligent Transportation, - (2023), Ausgabe 16, 2023, Seite(n) Vol 2, Iss 2, Pp 100069, ISSN 2773-1537
Herausgeber: Elsevier
DOI: 10.1016/j.geits.2023.100069

INCIT-EV The first e-mobility project with a touch of neuroscience

Autoren: Družba ELES
Veröffentlicht in: NOVO, Ausgabe No. 1 (one issue per year), 2021, Seite(n) 1
Herausgeber: NOVO

First results of the INICT-EV project are visible

Autoren: Maša Repež Gril,ELES
Veröffentlicht in: NAŠ STIK, Ausgabe c2685 printed copiues + online access, 2022, Seite(n) 32-33
Herausgeber: ELES

An important milestone has been reached within the framework of the INCIT-EV project

Autoren: Maša Repež Gril
Veröffentlicht in: NAŠ STIK, Ausgabe 06 March 2023, 2023
Herausgeber: ELES

Thermo-viscoelastic analysis of an inductive charging system included in an eRoads. Incit-ev project (öffnet in neuem Fenster)

Autoren: Gabet, Thomas; Mazhoud, Brahim; Kadem, Karim; Meira, Zariff; Sanzel, Arnaud; Coquelle, Eric; Sedran, Thierry; Hornych, Pierre
Veröffentlicht in: Transportation Engineering, Ausgabe 21, 2023, Seite(n) 11, pp.100161.
Herausgeber: ELSEVIER
DOI: 10.1016/j.treng.2023.100161

INCIT-EV project has successfully launched its activities

Autoren: Dr JANEZ HUMAR
Veröffentlicht in: NAŠ STIK, Ausgabe N° 5/2020, 2020, Seite(n) 44-45
Herausgeber: ELES

ELES to cooperate in new e-mobility project

Autoren: Dr. Draško Veselinovič
Veröffentlicht in: MOST Bulletin, Ausgabe N° 63, 2020, Seite(n) 1
Herausgeber: Slovenian Business and Research Association

Rechte des geistigen Eigentums

Electrical Chargers

Antrags-/Publikationsnummer: ES 009015290-0001
Datum: 2022-05-06
Antragsteller: FUNDACION CIRCE CENTRO DE INVESTIGACION DE RECURSOS Y CONSUMOS ENERGETICOS

Suche nach OpenAIRE-Daten ...

Bei der Suche nach OpenAIRE-Daten ist ein Fehler aufgetreten

Es liegen keine Ergebnisse vor

Mein Booklet 0 0