Deliverables
The output of tasks 151 and 152 will provide a description of each initial prototype This will be a living document updated for each intended use case data constraints and results as each initial prototype is progressed The document will summarise the results and conclude those use cases to be taken forward for prototyping
The outputs of Task 13.1 and Task 13.4 shall provide a description of the use cases and the high level design of the prototype and integration layer connectivity to be implemented; as well as a description of the validation test cases of the prototype and implemented integration layer connectivity. The document will summarise the results of the testing and validation.
Report describing auxiliary systems management strategy potential for Metro application
Report describing the Hybrid SiC converter efficiency estimations and real measurements deviation assessment results.
This deliverable will provide a description of the use cases and the high level design of the prototype and integration layer connectivity to be implemented.
In the deliverable the relevant models characterising typical vehicles track and soil conditions will be summarised The deliverable 82 is also an essential input to the S2R OC project anticipated to start in 2020
Technical specification of the requirements to be fulfilled by the methodologies proposed by the S2R Open Call project S2R-OC-CCA-01-2019. The test scenarios in which the methodologies will be assessed will be specified.
The output of Tasks 14.3 and 14.4 is to provide an outline operational concept and define ABS use cases and HMIs, and Asset Criticality Model ABS use case respectively. This report will detail the results of this activity.
Report describing DAS energy improvements assessment due to DAS by real measurements
A technical specification with the reference cases to be used, simulation requirements, validation targets and uncertainty assessment cases.
Documentation of HVAC technologies and HVAC KPI methodology.
The deliverable will include the specifications for the prediction tool. In detail, the relevant input and output parameters will be defined. Moreover, the interfaces allowing the inclusion of measured data will be described and specifications for the graphical user interface will be given. The deliverable 8.1 is an essential input to the S2R project anticipated to start in 2020.
The output of Task 14.1 is to provide functional and non-functional requirements for the Integration Layer data structures identified as a review of other Shift2Rail IP. The output of task 14.2 is to provide functional and non-functional requirements for the Integration Layer data structures identified as a review of other external data sources. Where appropriate the document will reference to other IP specification documents for detail and / or propose common formats where necessary.
Functional and nonfunctional description including subroutinesservices API Task 112 for the interfaces between integration layer and TMS freight and asset management services and description of proposal for data elements including attributes for infrastructure and rolling stock and transported goods
Searching for OpenAIRE data...