Skip to main content

Furthering Improvements in Integrated Mobility Management (I2M), Noise and Vibration, and Energy in Shift2Rail

Deliverables

Description of the Prototype and Validation Report

The outputs of Task 13.1 and Task 13.4 shall provide a description of the use cases and the high level design of the prototype and integration layer connectivity to be implemented; as well as a description of the validation test cases of the prototype and implemented integration layer connectivity. The document will summarise the results of the testing and validation.

Assessment of Hybrid SiC converter energy improvements

Report describing the Hybrid SiC converter efficiency estimations and real measurements deviation assessment results.

Description of the Prototype Report

This deliverable will provide a description of the use cases and the high level design of the prototype and integration layer connectivity to be implemented.

Specification of test scenarios and requirements for methodologies

Technical specification of the requirements to be fulfilled by the methodologies proposed by the S2R Open Call project S2R-OC-CCA-01-2019. The test scenarios in which the methodologies will be assessed will be specified.

Description of Advanced Business Services Use Case(s) and Asset Criticality Model Advanced Business Services Use Case Definition

The output of Tasks 14.3 and 14.4 is to provide an outline operational concept and define ABS use cases and HMIs, and Asset Criticality Model ABS use case respectively. This report will detail the results of this activity.

Specification for reference cases and validation targets

A technical specification with the reference cases to be used, simulation requirements, validation targets and uncertainty assessment cases.

State of the Art of HVAC Technologies, definition of HVAC KPI and evaluation methods

Documentation of HVAC technologies and HVAC KPI methodology.

Specification of model requirements including descriptors for vibration evaluation

The deliverable will include the specifications for the prediction tool. In detail, the relevant input and output parameters will be defined. Moreover, the interfaces allowing the inclusion of measured data will be described and specifications for the graphical user interface will be given. The deliverable 8.1 is an essential input to the S2R project anticipated to start in 2020.

System Requirement Specification (SRS) for the Integration Layer for Shift2Rail IP and External Data Sources

The output of Task 14.1 is to provide functional and non-functional requirements for the Integration Layer data structures identified as a review of other Shift2Rail IP. The output of task 14.2 is to provide functional and non-functional requirements for the Integration Layer data structures identified as a review of other external data sources. Where appropriate the document will reference to other IP specification documents for detail and / or propose common formats where necessary.