Resultado final
Recommendations on the choice of parameter based on the analysis of the calculation routines from CENTR 168912016 as well as improvements to the Standard
Future rail system with respect to energyThe description of the future railway system first issue was done in FINE1 is updated including further new technologies assessed in S2R
Report on Demonstrators TRL3/4Reports for the Demonstrators developed under this WP The reports will be structured according the requirements of the Data Management Plan of the project addressing prototype reports
Validation and uncertaintiesBased on existing and new measurements, the report addresses the validation of the vibration prediction tool and gives information on the uncertainties.
Description and Results of Use Case Initial PrototypesThe output of tasks 151 and 152 will provide a description of each initial prototype This will be a living document updated for each intended use case data constraints and results as each initial prototype is progressed The document will summarise the results and conclude those use cases to be taken forward for prototyping
Description of the Prototype and Validation ReportThe outputs of Task 13.1 and Task 13.4 shall provide a description of the use cases and the high level design of the prototype and integration layer connectivity to be implemented; as well as a description of the validation test cases of the prototype and implemented integration layer connectivity. The document will summarise the results of the testing and validation.
Improved requirements and a technical validation plan for A&V tools to be developedReport on the improved requirements including basic information on the interfaces of commercial visualisation software and a validation plan.
Auxiliary systems management strategy potential for Metro applicationReport describing auxiliary systems management strategy potential for Metro application
Energy baseline updateThe energy baseline first issue was done in FINE1 is updated including adjustments of simulation input data if necessary and new technologies developed in S2R
Uncertainty assessment of exterior noise simulationsUncertainty models description and application to reference cases.
Pre-standardisation and eco-labellingDocumentation of recommended amendments of EN50591 results of energylabelling survey in rail sector recommendations for benchmarking of rolling stock energy consumption assessment of different methodologies for defining a possible classification scheme documentation of the check of the tradeoff between energy and CO2 efficiency on the one hand and improved comfort and service on the other hand documentation of energy and CO2 labelling progress among transport modes
Description and Results of Use Case Full PrototypesThe output of tasks 153 will provide a description of each full prototype This will be a living document updated for each intended use case data constraints and results as each prototype is progressed The document will summarise the results and conclude those use cases to be taken forward for prototyping The document will define the software interfaces and data schemas used in the prototypes
Final evaluation and analysis of the A&V software toolReport on the activities carried out and evaluation results
Assessment of Hybrid SiC converter energy improvementsReport describing the Hybrid SiC converter efficiency estimations and real measurements deviation assessment results.
Evaluation of Energy KPIThe result of the work carried out in task T31 including S2R energy KPI is documented
Description of the Prototype ReportThis deliverable will provide a description of the use cases and the high level design of the prototype and integration layer connectivity to be implemented.
Feasibility of the use of methodologies and reference track normalisationAssessment of the feasibility of defining methodology to use a reference track to normalise passby noise test
Specification how to define and characterise typical vehicles, track and soil conditionsIn the deliverable the relevant models characterising typical vehicles track and soil conditions will be summarised The deliverable 82 is also an essential input to the S2R OC project anticipated to start in 2020
Prototype Verification and ValidationThis deliverable will provide a description of the validation test cases of the prototype and implemented integration layer connectivity The document will summarise the results of the testing and validation
Specification of test scenarios and requirements for methodologiesTechnical specification of the requirements to be fulfilled by the methodologies proposed by the S2R Open Call project S2R-OC-CCA-01-2019. The test scenarios in which the methodologies will be assessed will be specified.
Description of Advanced Business Services Use Case(s) and Asset Criticality Model Advanced Business Services Use Case DefinitionThe output of Tasks 14.3 and 14.4 is to provide an outline operational concept and define ABS use cases and HMIs, and Asset Criticality Model ABS use case respectively. This report will detail the results of this activity.
Assessment of DAS energy improvementsReport describing DAS energy improvements assessment due to DAS by real measurements
Dissemination, communication and exploitation activity reportReport summarising all communication, dissemination and exploitation activities and their impact, including an updated version of D16.1. The deliverable will also focus on the PESTLE analysis, as conducted in the Risk Analysis, to demonstrate how barriers to exploitation have been overcome.
Specification for reference cases and validation targetsA technical specification with the reference cases to be used, simulation requirements, validation targets and uncertainty assessment cases.
State of the Art of HVAC Technologies, definition of HVAC KPI and evaluation methodsDocumentation of HVAC technologies and HVAC KPI methodology.
Specification of model requirements including descriptors for vibration evaluationThe deliverable will include the specifications for the prediction tool. In detail, the relevant input and output parameters will be defined. Moreover, the interfaces allowing the inclusion of measured data will be described and specifications for the graphical user interface will be given. The deliverable 8.1 is an essential input to the S2R project anticipated to start in 2020.
System Requirement Specification (SRS) for the Integration Layer for Shift2Rail IP and External Data SourcesThe output of Task 14.1 is to provide functional and non-functional requirements for the Integration Layer data structures identified as a review of other Shift2Rail IP. The output of task 14.2 is to provide functional and non-functional requirements for the Integration Layer data structures identified as a review of other external data sources. Where appropriate the document will reference to other IP specification documents for detail and / or propose common formats where necessary.
Study on potential energy savings by new concepts and smart control of HVAC systemsDocumentation of smart approaches and their potentials for HVAC energy savings in BEMU recommendations for future actions especially concerning evaluation of thermal comfort with suitable approachesmeasures eg in existing testing facilities
ICT and Data Elements for Infrastructure, Rolling Stock and transported goodsFunctional and nonfunctional description including subroutinesservices API Task 112 for the interfaces between integration layer and TMS freight and asset management services and description of proposal for data elements including attributes for infrastructure and rolling stock and transported goods
Publicaciones
Autores:
Dittus, H. and Pröhl, L
Publicado en:
Proceedings of the 4th SmartRaCon Scientific Seminar, 2022, ISSN 1866-721X
Editor:
DLR
Autores:
A. Malkoun, M. Ripert, G. Schleinzer, A. Guiral
Publicado en:
forumacusticum 2023, 2023
Editor:
10th Convention of the European Acoustics Association
DOI:
10.61782/fa.2023.1253
Autores:
R. Caminal, A. Guiral Garcia, I. Eugui Larrea and J. Sapena
Publicado en:
Internoise 2024, 2024
Editor:
International Institute of Noise Control Engineering
Autores:
Donner, S. ; Elola, I. ; Dittus, H.
Publicado en:
2021
Editor:
Aachen University
DOI:
10.18154/rwth-2022-01608
Autores:
G.Schleinzer, M. Ripert, Ph. Rüst, A. Malkou, A. Guiral, R. Garburg
Publicado en:
Tagungsband Bahnakustik 2023, 2023
Editor:
MBBM Group
Autores:
Hermann, S., Stiebel, D., Mahlert, N., Garburg, R.
Publicado en:
IWRN 2022, 2024, Página(s) 93-101, ISBN 978-981-99-7851-9
Editor:
Springer
DOI:
10.1007/978-981-99-7852-6_7
Autores:
R. Caminal, R. Rumpler, A. Curien, A. Cloix, Martin Rissmann, A. Guiral Garcia, I. Eugui Larrea and J. Sapena1
Publicado en:
IWRN14, 2024, Página(s) 63-71, ISBN 978-981-99-7851-9
Editor:
Springer
DOI:
10.1007/978-981-99-7852-6_4
Autores:
Donner, Sylvio und Konrad, Marcel und Dittus, Holger und Schenker, Moritz
Publicado en:
ThermoSIM 2022, 2022
Editor:
DLR
Autores:
Donner, Sylvio und Dittus, Holger
Publicado en:
2022
Editor:
DLR
Buscando datos de OpenAIRE...
Se ha producido un error en la búsqueda de datos de OpenAIRE
No hay resultados disponibles