Virtual Power Plant for Interoperable and Smart isLANDS

CORDIS fornisce collegamenti ai risultati finali pubblici e alle pubblicazioni dei progetti ORIZZONTE.

I link ai risultati e alle pubblicazioni dei progetti del 7° PQ, così come i link ad alcuni tipi di risultati specifici come dataset e software, sono recuperati dinamicamente da .OpenAIRE .

Risultati finali

Results of assembly and guide of installation and configuration (si apre in una nuova finestra)

The deliverable will describe all modular functionalities APIs and interfaces taking into account the migration to an European cloudbased platform as a service for proper solution scalability including also a userfriendly guide for installation and configuration of each module

VPP4Islands networking, JV and cooperation activities (si apre in una nuova finestra)

Including the main findings lessons learnt and impacts of the collaboration and networking activities

Report on D&C activities (si apre in una nuova finestra)

It details the activities carried out for D&C, reports the lesson learnt and best practicies to expand our communities and verifies the compliance with actions defined in D8.1

VPP4Islands Smart Contracts Specifications (si apre in una nuova finestra)

The deliverable will contain a report on the definition of requirements, specifics and contents of VPP4Islands smart contracts.

The results and analysis of the validation tests (si apre in una nuova finestra)

Validation processes will be undertaken to verify that the tool satisfies specified requirements and the key resources nonintrusive fastimplementing and opensector

VPP risk assessment (si apre in una nuova finestra)

The deliverable will provide a risk management plan and activities framework for VPP exposing the risk management approach of the project

AAI Infrastructure API Specification and Prototype (si apre in una nuova finestra)

This deliverable will contain the application programming interface API and architecture of the AAI infrastructure especially defining an reactive publishsubscribe service for authorization and filtering as well as APIs for extending the AAI with domain specific Policy Information Points A reference implementation will be delivered for partners to develop and test against

Dissemination and communication plan (si apre in una nuova finestra)

D8.1 will include the roadmap of the different activities to be carried out during the project. It will updated at M12

Assessment of GDPR, standards and SSH compliance (si apre in una nuova finestra)

D56 includes the impacts of implemented standards policies risk analysis and guidance based on the outcomes of demos It will be updated at M20 with lesson learnt and best practices

Islands energy transition policies and legislation (si apre in una nuova finestra)
VESS API and analysis (si apre in una nuova finestra)

This deliverable will introduce the FLEXIS demonstration area that consists of a variety of distributed generation and virtual storage technologies. A use case within the demonstration area will be introduced. The defined case study will be introduced to assess and validate the economic and technical benefits of the VESS API and how it can be improved with the novel technologies.

The design and architecture of the digital twin (si apre in una nuova finestra)

Digital Twin’s architecture will be an application able to connect the databases (DB) from the original sources with the 3D model. Having this purpose, the platform will be able to display the 3D model along with the databases’s integration (such as real time data, historical data, etc.) The result thus will be a virtual copy of the real site which is able not only to behave in the same way that the built system performs but also to simulate future situations that will allow to optimise the entire system’s efficiency.

Analysis of obstacles to innovations in islands (si apre in una nuova finestra)
Report on the solution comparison and recommendations for improvement (si apre in una nuova finestra)

Including difficulties, enablers, best practices, new experiences and lessons learnt from different uses cases

PMP and Quality Assurance (si apre in una nuova finestra)

Project Management Plan, Quality assurance plan and risk assessment

VPP4Islands networking, JV and cooperation plan (si apre in una nuova finestra)

D8.3 will determine the main collaborations to be established, the role of each partners and the planning actions.

Requirements and needs for island energy services (si apre in una nuova finestra)
VPP4Islands services (si apre in una nuova finestra)

The report will present the existing services and their constraints. D2.5 will report the new tailored services provided for utilities, RTOs and consumers

Kick-off report and detailed roadmap (si apre in una nuova finestra)
Technical specification of VPP4Islands (si apre in una nuova finestra)

The deliverable will contain the technical specification for the setup of the different proposed services in the expected demonstration pilots, taking into account various configurations and scenarios and the proper support to KPI evaluation. Technical specifications will also be outlined for ensuring implemented RES and VPPs interoperability with the power grid, based on the improvement of current standards and protocols.

Report on the VPP4Islands concepts (si apre in una nuova finestra)

The report will establish a strong evidence-based data set and formulate possible VPP4Islands concepts hybrid integration options.

Scenarios for studying VPP4Islands concept (si apre in una nuova finestra)

The deliverable will formalize several complementary piloting scenarios to demonstrate capabilities and values of the VPP4Islands proposed services and solutions providing input to WP3 WP4 and WP5 for the definition of the supporting functionalities the associated architecture and the design and implementation approaches

Pubblicazioni

A Comprehensive Smart Energy Management Strategy for TVPP, CVPP, and Energy Communities (si apre in una nuova finestra)

Autori: Ehsan Heydarian-Forushani, and Seifeddine Ben Elghali
Pubblicato in: Taylor and Francis, 2023, ISBN 9781032189789
Editore: CRC press
DOI: 10.1201/9781003257202-6

High-performance pseudo-anonymization of virtual power plant data on a CPU cluster (si apre in una nuova finestra)

Autori: Mahdi Abbasi, Azam Fazel Najafabadi,Seifeddine Ben Elghali,Mohamed Zerrougui, Mohammad R. Khosravi, Habib Nasser
Pubblicato in: Cluster Computing: The Journal of Networks, Software Tools and Applications, Numero https://www.springer.com/journal/10586, 2022, ISSN 1944-4036
Editore: Springer
DOI: 10.1007/s10586-021-03526-7

Virtual Power Plant Operational Strategies: Models, Markets, Optimization, Challenges, and Opportunities (si apre in una nuova finestra)

Autori: Mohammad Mohammadi Roozbehani ,Ehsan Heydarian-Forushani,Saeed Hasanzadeh and Seifeddine Ben Elghali
Pubblicato in: Sustainability, Numero 20711050, 2022, ISSN 2071-1050
Editore: MDPI Open Access Publishing
DOI: 10.3390/su141912486

Dynamical Model for Power Grid Frequency Fluctuations: Application to Islands with High Penetration of Wind Generation (si apre in una nuova finestra)

Autori: María Martinez-Barbeito, Damià Gomila and Pere Colet
Pubblicato in: IEEE Transactions on Sustainable Energy, 2023, ISSN 1949-3029
Editore: Institute of Electrical and Electronics Engineers
DOI: 10.1109/tste.2022.3231975

An Auction-Based Local Market Clearing for Energy Management in a Virtual Power Plant (si apre in una nuova finestra)

Autori: Ehsan Heydarian-Forushani , Seifeddine Ben Elghali , Mohamed Zerrougui, Massimo La Scala , and Pascal Mestre
Pubblicato in: IEEE TRANSACTIONS ON INDUSTRY APPLICATIONS, 2022, ISSN 0093-9994
Editore: Institute of Electrical and Electronics Engineers
DOI: 10.1109/tia.2022.3188226

Virtual Power Plants Optimization Issue: A Comprehensive Review on Methods, Solutions, and Prospects (si apre in una nuova finestra)

Autori: Wafa Nafkha-Tayari; Seifeddine Ben Elghali; Ehsan Heydarian-Forushani; Mohamed Benbouzid
Pubblicato in: Energies; Volume 15; Numero 10; Pages: 3607, Numero 1, 2022, ISSN 1996-1073
Editore: Multidisciplinary Digital Publishing Institute (MDPI)
DOI: 10.3390/en15103607

A Centralized-Stochastic Solution for Smart Energy Management in a Virtual Power Plant (si apre in una nuova finestra)

Autori: Ehsan Heydarian-Forushani; Seifeddine Ben Elghali; Mohamed Zerrougui; Massimo La Scala; Pascal Mestre
Pubblicato in: 2021 IEEE International Conference on Environment and Electrical Engineering and 2021 IEEE Industrial and Commercial Power Systems Europe (EEEIC / I&CPS Europe), Numero https://ieeexplore.ieee.org/xpl/conhome/9584464/proceeding, 2021
Editore: IEEE
DOI: 10.1109/eeeic/icpseurope51590.2021.9584773

In-Memory Policy Indexing for Policy Retrieval Points in Attribute-Based Access Control (si apre in una nuova finestra)

Autori: Dominic Heutelbeck, Marc Lucas Baur, Martin Kluba
Pubblicato in: Proceedings of the 26th ACM Symposium on Access Control Models and Technologies, Numero https://dl.acm.org/doi/proceedings/10.1145/3450569, 2021
Editore: ACM Digital Library
DOI: 10.1145/3450569.3463562

Data Analysis of Frequency Fluctuations in the Balearic Grid Before and After Coal Closure

Autori: María Martínez-Barbeito
Pubblicato in: IARIA, 2021
Editore: IARIA

È in corso la ricerca di dati su OpenAIRE...

Si è verificato un errore durante la ricerca dei dati su OpenAIRE

Nessun risultato disponibile

Il mio fascicolo 0 0