Risultati finali
Critical actors identified that are needed to implement the ReCreate value chain commercially (including both direct and indirect actors as well as currently existing actors and possibly missing actors). These mappings depict the actors and linkages between them, and consequently, structures of the business ecosystem as well gaps and dynamics within it. D7.1 is based on the work done in Task 7.1.
Project handbookA handbook for all project participants including project management plan guidelines training material for partners eg on research ethics project procedures gender issuesD101 is based on the work done in Task 101 and Task 106
Best Practise Guidelines and recommendations deconstruction to optimised reuseBased on the experiences and know how developed in the real-life pilots, this report will evaluate the projects on their merits and drawbacks and formulate the overall recommendations regarding the deconstruction phase. Different deconstruction and harvesting techniques for precast elements are evaluated, comparing deconstruction processes and equipment from economic, technical, work safety and sustainability viewpoints with recommendations for the development of equipment. Recommendations and general methodology for achieving an optimised deconstruction process, which starts with the pre-deconstruction audit feeding the data into the design and BIM environment, combined withquality management requirements and LCA calculations, thus optimising the overall reuse benefit balance. A methodology towards deconstruction optimisation in relation to new designs and to be used as input for design optimisation in WP5.D2.2 is based on the work done in Task 2.2.
Identified, analysed and developed business model canvases for concrete rebuild businessesBusiness model canvases for concrete reuse are identified, analysed and developed. This includes the value proposition (offering, customers), how value is captured (costs, revenues) and how value is delivered (e.g. partners, channels) through concrete reuse. Business model canvases provide profound understanding on how concrete reuse businesses are construed on company, system and process levels and enable developing business models for concrete reuse.D7.2 is based on the work done in Task 7.2.
Quality assurance planA document defining quality management practices for example setting criteria for how and by whom the project deliverables will be reviewed prior to submissionD102 is based on the work done in Task 103
Procedure for quality managementMethods and procedure described and tested in pilot project. Results will fed to T2.1, T3.3 and T5.1–T5.3.D4.1 is based on the work done in Task 4.1.
Document on legal and technical requirements for reuse planning and building permitsA document in aid of project planning employing reused concrete elements.D8.2 is based on the work done in Task 8.2.
Properties and quality of deconstructed components for pilot projects ensuredTesting methods described in T4.3 and T4.4 will be used to ensure elements for reuse. The documentation of the necessary test will be fed to T5.4.D4.2 is based on the work done in Tasks 4.2, 4.3 and 4.4.
BIM-Based pre-deconstructon audit processGuidelines are given for the structure content and procedures of a predeconstruction audit when component reuse is the ultimate aim while implementing a BIM approach The recommendations focus on the preharvesting processes and linking elements to their taxonomic data ie WP 1 data and their individual properties ie data from the current WP and WP 4D21 is based on the work done in Task 21
Guide for coalition buildingThe policy processes that the actors face during the implementation of the pilot projects are identified through document analysis and interviews with policy makers. Consequently, a guide on important policy-making considerations for planning reused concrete elements in building projects is created. D8.1 is based on the work done in Task 8.1.
At least three real-life deconstruction pilots (FI, DE, NL) – in SE, deconstruction may take partly place on company funding prior to the beginning of the ReCreate project. The pilot has been successfully implemented when the elements have been deconstructed from the donor building.D2.3 is based on the work done in Task 2.3.
Presentation video and aminations are created.D9.3 is based on the work done in Task 9.3.
Diagram of building, component and connector typologiesA visualisation of the order of precast concrete elements at three different scales of building, component, and connector. The diagrams describe and become a way of identifying which system a component belongs to. It also identifies the prevalence of characteristics in precast systems by building, component or connector types.D1.2 is based on the work done in Task 1.2.
Data management plan for the project is createdD104 is based on the work done in Task 105
Project logo visual identity and website are createdD92 is based on the work done in Task 92
Pubblicazioni
Autori:
Stenberg, Erik; Hernandez Vargas, José; Huuhka, Satu
Pubblicato in:
ARQ (Santiago), Numero 112, 2022, Pagina/e 84-95, ISSN 0717-6996
Editore:
Pontificia Universidad Católica de Chile, Escuela de Arquitectura
DOI:
10.4067/s0717-69962022000300084
Autori:
Arlind Dervishaj, Arianna Fonsati, José Hernández Vargas, Kjartan Gudmundsson
Pubblicato in:
Digital Design Reconsidered - Proceedings of the 41st Conference on Education and Research in Computer Aided Architectural Design in Europe (eCAADe 2023) - Volume 2, Graz, 20-22 September 2023, Numero 41, 2023, Pagina/e 177–186
Editore:
Education and research in Computer Aided Architectural Design in Europe
DOI:
10.52842/conf.ecaade.2023.2.177
Autori:
Thijs Lambrechts, Fred Mudge, Simon Wijte, Patrick Teuffel
Pubblicato in:
Life-Cycle of Structures and Infrastructure Systems: Proceedings of the 8th international symposium on life-cycle civil engineering (IALCCE 2023), 2-6 JULY, 2023, Politecnico di Milano, Milan, Italy., 2023, Pagina/e 165-171, ISBN 9781003323020
Editore:
CRC Press
Autori:
Aapo Räsänen and Jukka Lahdensivu
Pubblicato in:
Life-Cycle of Structures and Infrastructure Systems: Proceedings of the 8th international symposium on life-cycle civil engineering (IALCCE 2023), 2-6 JULY, 2023, Politecnico di Milano, Milan, Italy., 2023, Pagina/e 142-148, ISBN 9781003323020
Editore:
CRC Press.
Autori:
Leena Aarikka-Stenroos, Lauri Alkki, Linnea Harala, Mari Riuttala
Pubblicato in:
Proceedings of ISPIM Connects Valencia: Reconnect, Rediscover, Reimagine, 2021, ISBN 978-952-335-691-7
Editore:
The International Society for Professional Innovation Management (ISPIM)
Autori:
Arlind Dervishaj, José Hernández Vargas, Kjartan Gudmundsson
Pubblicato in:
Proceedings of the 2023 European Conference on Computing in Construction and the 40th International CIB W78 Conference, 2023, ISBN 978-0-701702-73-1
Editore:
European Council on Computing in Construction (EC3)
DOI:
10.35490/ec3.2023.220
Autori:
Linnea Harala; Lauri Alkki; Leena Aarikka-Stenroos; Ahmad Al-Najjar; Tove Malmqvist
Pubblicato in:
Journal of Cleaner Production, Numero 389, 2023, Pagina/e 135885, ISSN 0959-6526
Editore:
Elsevier BV
DOI:
10.1016/j.jclepro.2023.135885
Autori:
Mari Riuttala, Linnea Harala, Leena Aarikka-Stenroos, Satu Huuhka
Pubblicato in:
Journal of Cleaner Production, Numero 443, 2024, Pagina/e 141112, ISSN 0959-6526
Editore:
Elsevier BV
DOI:
10.1016/j.jclepro.2024.141112
Autori:
Paul Jonker-Hoffrén
Pubblicato in:
Buildings and Cities, Numero 4(1), 2023, Pagina/e 405–421, ISSN 2632-6655
Editore:
Ubiquity Press
DOI:
10.5334/bc.305
Autori:
Arlind Dervishaj, Tove Malmqvist, Johan Silfwerbrand, Kjartan Gudmundsson
Pubblicato in:
Journal of Building Engineering, Numero 96, 2024, Pagina/e 110536, ISSN 2352-7102
Editore:
Elsevier
DOI:
10.1016/j.jobe.2024.110536
Autori:
Arlind Dervishaj; Kjartan Gudmundsson
Pubblicato in:
Resources, Conservation and Recycling, Numero 200, 2023, Pagina/e 107291, ISSN 0921-3449
Editore:
Elsevier BV
DOI:
10.1016/j.resconrec.2023.107291
Autori:
Mikko Sairanen, Leena Aarikka-Stenroos, Jenni Kaipainen
Pubblicato in:
Industrial Marketing Management, Numero 117, 2024, Pagina/e 321-343, ISSN 0019-8501
Editore:
Elsevier BV
DOI:
10.1016/j.indmarman.2024.01.006
Autori:
Satu Huuhka, Leena Aarikka-Stenroos, Jukka Lahdensivu, Paul Jonker-Hoffrén, Viktoria Arnold, Erik Stenberg, Rijk Blok, Kjartan Gudmundsson, Patrick Teuffel, Angelika Mettke
Pubblicato in:
The Routledge Handbook of Catalysts for a Sustainable Circular Economy, 2023, Pagina/e 42-66, ISBN 9781003267492
Editore:
Routledge
DOI:
10.4324/9781003267492-4