CORDIS provides links to public deliverables and publications of HORIZON projects.
Links to deliverables and publications from FP7 projects, as well as links to some specific result types such as dataset and software, are dynamically retrieved from OpenAIRE .
Deliverables
D6.9 Final analytics platform, upgraded after user feedback (M24; RM with help from TUE)
SnapToPowerQuality deployment at Pilot 2 (opens in new window)D6.3.2 SnapToPowerQuality deployment at Pilot 2 (M18; OS)
Matured embedded sensor and gateway software (opens in new window)D4.3 Matured embedded sensor and gateway software (M15; RM)
Final template user interfaces, upgraded after user feedback (opens in new window)D6.7 Final template user interfaces, upgraded after user feedback (M24; ICB)
Upgraded ReCalc MoniTor GUI generating module (opens in new window)D4.5 Upgraded ReCalc MoniTor GUI generating module (M15; RM)
SnapToPowerQuality deployment at Pilot 1 (opens in new window)D6.3.1 SnapToPowerQuality deployment at Pilot 1 (M17; OS)
Production line GUI prototypes made (opens in new window)D53 Production line GUI prototypes made M18 ICB
Data integration APIs for interoperability (opens in new window)D4.1 Data integration APIs for interoperability (M10; ICB)
Cloud platform technical documentation materials (opens in new window)D6.8.1 Cloud platform technical documentation materials (M22; RM)
Prototype software and lab set up running (opens in new window)D3.4 Prototype software and lab set up running (M15, TUE)
Software adapters for at least 4 management systems (opens in new window)D5.1.1 Software adapters for at least 4 management systems (M15, ICB)
Power quality analysis integrated in the existing RM cloud platform (opens in new window)D4.4 Power quality analysis integrated in the existing RM cloud platform (M15; RM)
SnapToPowerQuality deployment at Pilot 3 (opens in new window)D6.3.3 SnapToPowerQuality deployment at Pilot 3 (M20; ICB)
Software adapters to at least 5 types of manufacturing equipment (opens in new window)D5.1.2 Software adapters to at least 5 types of manufacturing equipment (M16, ICB)
Mass-production ready hardware solutions (opens in new window)D6.4 Mass-production ready hardware solutions (M24; RM)
Test bead for accelerated integration test (opens in new window)D6.2 Test bead for accelerated integration test (M15; ICB).
Matured sensor hardware (opens in new window)D4.2 Matured sensor hardware (M12; RM)
ReMoni cloud integration APIs (opens in new window)D5.2 ReMoni cloud integration APIs (M16, ICB)
Edge computing platform designed and ready for pilot deployment (opens in new window)D5.3 Edge computing platform designed and ready for pilot deployment (M13; ICB)
D24 Dissemination about project results in popular scientific journals M23 TUE
Distribution package incl. sales and marketing materials, (opens in new window)D2.3 Distribution package incl. sales and marketing materials, presentations, flyers, project business card, etc. (M12; RM)
Project website and collaboration portal (opens in new window)D21 Project website and collaboration portal M5 RM
Dissemination about project start through the press and social media (opens in new window)D2.2 Dissemination about project start through the press and social media (M6; TUE)
Operator manual (opens in new window)D683 Operator manual M24 RM
Configuration manual (opens in new window)D682 Configuration manual M24 RM
D3.1 Method selection documented (M2, TUE)
IPR protection documented on the European Commission portal (opens in new window)D14 IPR protection documented on the European Commission portal M16 RM
Centralized source location method of the power quality issue (opens in new window)D3.3 Centralized source location method of the power quality issue made and documented (M10, TUE)
Pilot deployment report (opens in new window)D66 Pilot deployment report M22 OS
Report on dissemination and networking activities - Period 2 (opens in new window)D252 Report on dissemination and networking activities Reporting Period 2 M24 TUE all partners contribute
Report on dissemination and networking activities – Period 1 (opens in new window)D2.5.1 Report on dissemination and networking activities – Reporting Period 1 (M12; TUE, all partners contribute)
Distributed power quality measurement method (opens in new window)D3.2 Distributed power quality measurement method made and documented (M4, TUE)
D61 Test bead for accelerated measurement and analytics test M15 TUE
Searching for OpenAIRE data...
There was an error trying to search data from OpenAIRE
No results available