Skip to main content
European Commission logo
English English
CORDIS - EU research results
CORDIS
CORDIS Web 30th anniversary CORDIS Web 30th anniversary

SnapToPowerQuality: Protect Production Facilities from Power Quality Failures using Low-cost Clamp-on Measurements from the Outside of Existing Multiconductor Cables

CORDIS provides links to public deliverables and publications of HORIZON projects.

Links to deliverables and publications from FP7 projects, as well as links to some specific result types such as dataset and software, are dynamically retrieved from OpenAIRE .

Deliverables

Final analytics platform, upgraded after user feedback

D6.9 Final analytics platform, upgraded after user feedback (M24; RM with help from TUE)

SnapToPowerQuality deployment at Pilot 2

D6.3.2 SnapToPowerQuality deployment at Pilot 2 (M18; OS)

Matured embedded sensor and gateway software

D4.3 Matured embedded sensor and gateway software (M15; RM)

Final template user interfaces, upgraded after user feedback

D6.7 Final template user interfaces, upgraded after user feedback (M24; ICB)

Upgraded ReCalc MoniTor GUI generating module

D4.5 Upgraded ReCalc MoniTor GUI generating module (M15; RM)

SnapToPowerQuality deployment at Pilot 1

D6.3.1 SnapToPowerQuality deployment at Pilot 1 (M17; OS)

Production line GUI prototypes made

D53 Production line GUI prototypes made M18 ICB

Data integration APIs for interoperability

D4.1 Data integration APIs for interoperability (M10; ICB)

Cloud platform technical documentation materials

D6.8.1 Cloud platform technical documentation materials (M22; RM)

Prototype software and lab set up running

D3.4 Prototype software and lab set up running (M15, TUE)

Software adapters for at least 4 management systems

D5.1.1 Software adapters for at least 4 management systems (M15, ICB)

Power quality analysis integrated in the existing RM cloud platform

D4.4 Power quality analysis integrated in the existing RM cloud platform (M15; RM)

SnapToPowerQuality deployment at Pilot 3

D6.3.3 SnapToPowerQuality deployment at Pilot 3 (M20; ICB)

Software adapters to at least 5 types of manufacturing equipment

D5.1.2 Software adapters to at least 5 types of manufacturing equipment (M16, ICB)

Mass-production ready hardware solutions

D6.4 Mass-production ready hardware solutions (M24; RM)

Test bead for accelerated integration test

D6.2 Test bead for accelerated integration test (M15; ICB).

Matured sensor hardware

D4.2 Matured sensor hardware (M12; RM)

ReMoni cloud integration APIs

D5.2 ReMoni cloud integration APIs (M16, ICB)

Edge computing platform designed and ready for pilot deployment

D5.3 Edge computing platform designed and ready for pilot deployment (M13; ICB)

Dissemination about project results in popular scientific journals

D24 Dissemination about project results in popular scientific journals M23 TUE

Distribution package incl. sales and marketing materials,

D2.3 Distribution package incl. sales and marketing materials, presentations, flyers, project business card, etc. (M12; RM)

Project website and collaboration portal

D21 Project website and collaboration portal M5 RM

Dissemination about project start through the press and social media

D2.2 Dissemination about project start through the press and social media (M6; TUE)

Operator manual

D683 Operator manual M24 RM

Configuration manual

D682 Configuration manual M24 RM

Method selection documented

D3.1 Method selection documented (M2, TUE)

IPR protection documented on the European Commission portal

D14 IPR protection documented on the European Commission portal M16 RM

Centralized source location method of the power quality issue

D3.3 Centralized source location method of the power quality issue made and documented (M10, TUE)

Pilot deployment report

D66 Pilot deployment report M22 OS

Report on dissemination and networking activities - Period 2

D252 Report on dissemination and networking activities Reporting Period 2 M24 TUE all partners contribute

Report on dissemination and networking activities – Period 1

D2.5.1 Report on dissemination and networking activities – Reporting Period 1 (M12; TUE, all partners contribute)

Distributed power quality measurement method

D3.2 Distributed power quality measurement method made and documented (M4, TUE)

Test bead for accelerated measurement and analytics test

D61 Test bead for accelerated measurement and analytics test M15 TUE

Searching for OpenAIRE data...

There was an error trying to search data from OpenAIRE

No results available