CORDIS fornisce collegamenti ai risultati finali pubblici e alle pubblicazioni dei progetti ORIZZONTE.
I link ai risultati e alle pubblicazioni dei progetti del 7° PQ, così come i link ad alcuni tipi di risultati specifici come dataset e software, sono recuperati dinamicamente da .OpenAIRE .
Risultati finali
D6.9 Final analytics platform, upgraded after user feedback (M24; RM with help from TUE)
SnapToPowerQuality deployment at Pilot 2 (si apre in una nuova finestra)D6.3.2 SnapToPowerQuality deployment at Pilot 2 (M18; OS)
Matured embedded sensor and gateway software (si apre in una nuova finestra)D4.3 Matured embedded sensor and gateway software (M15; RM)
Final template user interfaces, upgraded after user feedback (si apre in una nuova finestra)D6.7 Final template user interfaces, upgraded after user feedback (M24; ICB)
Upgraded ReCalc MoniTor GUI generating module (si apre in una nuova finestra)D4.5 Upgraded ReCalc MoniTor GUI generating module (M15; RM)
SnapToPowerQuality deployment at Pilot 1 (si apre in una nuova finestra)D6.3.1 SnapToPowerQuality deployment at Pilot 1 (M17; OS)
Production line GUI prototypes made (si apre in una nuova finestra)D53 Production line GUI prototypes made M18 ICB
Data integration APIs for interoperability (si apre in una nuova finestra)D4.1 Data integration APIs for interoperability (M10; ICB)
Cloud platform technical documentation materials (si apre in una nuova finestra)D6.8.1 Cloud platform technical documentation materials (M22; RM)
Prototype software and lab set up running (si apre in una nuova finestra)D3.4 Prototype software and lab set up running (M15, TUE)
Software adapters for at least 4 management systems (si apre in una nuova finestra)D5.1.1 Software adapters for at least 4 management systems (M15, ICB)
Power quality analysis integrated in the existing RM cloud platform (si apre in una nuova finestra)D4.4 Power quality analysis integrated in the existing RM cloud platform (M15; RM)
SnapToPowerQuality deployment at Pilot 3 (si apre in una nuova finestra)D6.3.3 SnapToPowerQuality deployment at Pilot 3 (M20; ICB)
Software adapters to at least 5 types of manufacturing equipment (si apre in una nuova finestra)D5.1.2 Software adapters to at least 5 types of manufacturing equipment (M16, ICB)
Mass-production ready hardware solutions (si apre in una nuova finestra)D6.4 Mass-production ready hardware solutions (M24; RM)
Test bead for accelerated integration test (si apre in una nuova finestra)D6.2 Test bead for accelerated integration test (M15; ICB).
Matured sensor hardware (si apre in una nuova finestra)D4.2 Matured sensor hardware (M12; RM)
ReMoni cloud integration APIs (si apre in una nuova finestra)D5.2 ReMoni cloud integration APIs (M16, ICB)
Edge computing platform designed and ready for pilot deployment (si apre in una nuova finestra)D5.3 Edge computing platform designed and ready for pilot deployment (M13; ICB)
D24 Dissemination about project results in popular scientific journals M23 TUE
Distribution package incl. sales and marketing materials, (si apre in una nuova finestra)D2.3 Distribution package incl. sales and marketing materials, presentations, flyers, project business card, etc. (M12; RM)
Project website and collaboration portal (si apre in una nuova finestra)D21 Project website and collaboration portal M5 RM
Dissemination about project start through the press and social media (si apre in una nuova finestra)D2.2 Dissemination about project start through the press and social media (M6; TUE)
Operator manual (si apre in una nuova finestra)D683 Operator manual M24 RM
Configuration manual (si apre in una nuova finestra)D682 Configuration manual M24 RM
D3.1 Method selection documented (M2, TUE)
IPR protection documented on the European Commission portal (si apre in una nuova finestra)D14 IPR protection documented on the European Commission portal M16 RM
Centralized source location method of the power quality issue (si apre in una nuova finestra)D3.3 Centralized source location method of the power quality issue made and documented (M10, TUE)
Pilot deployment report (si apre in una nuova finestra)D66 Pilot deployment report M22 OS
Report on dissemination and networking activities - Period 2 (si apre in una nuova finestra)D252 Report on dissemination and networking activities Reporting Period 2 M24 TUE all partners contribute
Report on dissemination and networking activities – Period 1 (si apre in una nuova finestra)D2.5.1 Report on dissemination and networking activities – Reporting Period 1 (M12; TUE, all partners contribute)
Distributed power quality measurement method (si apre in una nuova finestra)D3.2 Distributed power quality measurement method made and documented (M4, TUE)
D61 Test bead for accelerated measurement and analytics test M15 TUE
È in corso la ricerca di dati su OpenAIRE...
Si è verificato un errore durante la ricerca dei dati su OpenAIRE
Nessun risultato disponibile