CORDIS bietet Links zu öffentlichen Ergebnissen und Veröffentlichungen von HORIZONT-Projekten.
Links zu Ergebnissen und Veröffentlichungen von RP7-Projekten sowie Links zu einigen Typen spezifischer Ergebnisse wie Datensätzen und Software werden dynamisch von OpenAIRE abgerufen.
Leistungen
D6.9 Final analytics platform, upgraded after user feedback (M24; RM with help from TUE)
SnapToPowerQuality deployment at Pilot 2 (öffnet in neuem Fenster)D6.3.2 SnapToPowerQuality deployment at Pilot 2 (M18; OS)
Matured embedded sensor and gateway software (öffnet in neuem Fenster)D4.3 Matured embedded sensor and gateway software (M15; RM)
Final template user interfaces, upgraded after user feedback (öffnet in neuem Fenster)D6.7 Final template user interfaces, upgraded after user feedback (M24; ICB)
Upgraded ReCalc MoniTor GUI generating module (öffnet in neuem Fenster)D4.5 Upgraded ReCalc MoniTor GUI generating module (M15; RM)
SnapToPowerQuality deployment at Pilot 1 (öffnet in neuem Fenster)D6.3.1 SnapToPowerQuality deployment at Pilot 1 (M17; OS)
Production line GUI prototypes made (öffnet in neuem Fenster)D53 Production line GUI prototypes made M18 ICB
Data integration APIs for interoperability (öffnet in neuem Fenster)D4.1 Data integration APIs for interoperability (M10; ICB)
Cloud platform technical documentation materials (öffnet in neuem Fenster)D6.8.1 Cloud platform technical documentation materials (M22; RM)
Prototype software and lab set up running (öffnet in neuem Fenster)D3.4 Prototype software and lab set up running (M15, TUE)
Software adapters for at least 4 management systems (öffnet in neuem Fenster)D5.1.1 Software adapters for at least 4 management systems (M15, ICB)
Power quality analysis integrated in the existing RM cloud platform (öffnet in neuem Fenster)D4.4 Power quality analysis integrated in the existing RM cloud platform (M15; RM)
SnapToPowerQuality deployment at Pilot 3 (öffnet in neuem Fenster)D6.3.3 SnapToPowerQuality deployment at Pilot 3 (M20; ICB)
Software adapters to at least 5 types of manufacturing equipment (öffnet in neuem Fenster)D5.1.2 Software adapters to at least 5 types of manufacturing equipment (M16, ICB)
Mass-production ready hardware solutions (öffnet in neuem Fenster)D6.4 Mass-production ready hardware solutions (M24; RM)
Test bead for accelerated integration test (öffnet in neuem Fenster)D6.2 Test bead for accelerated integration test (M15; ICB).
Matured sensor hardware (öffnet in neuem Fenster)D4.2 Matured sensor hardware (M12; RM)
ReMoni cloud integration APIs (öffnet in neuem Fenster)D5.2 ReMoni cloud integration APIs (M16, ICB)
Edge computing platform designed and ready for pilot deployment (öffnet in neuem Fenster)D5.3 Edge computing platform designed and ready for pilot deployment (M13; ICB)
D24 Dissemination about project results in popular scientific journals M23 TUE
Distribution package incl. sales and marketing materials, (öffnet in neuem Fenster)D2.3 Distribution package incl. sales and marketing materials, presentations, flyers, project business card, etc. (M12; RM)
Project website and collaboration portal (öffnet in neuem Fenster)D21 Project website and collaboration portal M5 RM
Dissemination about project start through the press and social media (öffnet in neuem Fenster)D2.2 Dissemination about project start through the press and social media (M6; TUE)
Operator manual (öffnet in neuem Fenster)D683 Operator manual M24 RM
Configuration manual (öffnet in neuem Fenster)D682 Configuration manual M24 RM
D3.1 Method selection documented (M2, TUE)
IPR protection documented on the European Commission portal (öffnet in neuem Fenster)D14 IPR protection documented on the European Commission portal M16 RM
Centralized source location method of the power quality issue (öffnet in neuem Fenster)D3.3 Centralized source location method of the power quality issue made and documented (M10, TUE)
Pilot deployment report (öffnet in neuem Fenster)D66 Pilot deployment report M22 OS
Report on dissemination and networking activities - Period 2 (öffnet in neuem Fenster)D252 Report on dissemination and networking activities Reporting Period 2 M24 TUE all partners contribute
Report on dissemination and networking activities – Period 1 (öffnet in neuem Fenster)D2.5.1 Report on dissemination and networking activities – Reporting Period 1 (M12; TUE, all partners contribute)
Distributed power quality measurement method (öffnet in neuem Fenster)D3.2 Distributed power quality measurement method made and documented (M4, TUE)
D61 Test bead for accelerated measurement and analytics test M15 TUE
Suche nach OpenAIRE-Daten ...
Bei der Suche nach OpenAIRE-Daten ist ein Fehler aufgetreten
Es liegen keine Ergebnisse vor