PNEUMATIC INTRODUCTION OF COKE BREEZE CHARGE INTO CUPOLA FURNACE

Ziel

To verify on an industrial scale the technical and economic validity of introducing coke scraps of differing granulometry into the comburant air zone of continuously operating hot blast cupolas, thereby utilizing a product (coke breeze) of high heat and energy content which would be otherwise degraded as a difficult to use, low cost by-product. Scraps recovery of +- 1,400 T/y. will yield a net saving of +- Lit. 170 million. Payback is estimated at 2.2 years.
The project began in December 1982 and work was halted in April 1985. The melting system is considered the heart of the foundry. It supplies liquid metal for the casting line in quality and quantity required. For this reason it has to be technically reliable and economically profitable. Problems arose with the demonstration plant, particularly with clogging and erosion of piping, inconsistency of the coke breeze dose, maintenance difficulties and the gravity feed: consequently the contractor decided it was prudent to abandon the project. It did however yield the following results:
- the efficiency of the coke breeze, blown-in from the tuyeres exceeded 90%;
- pressure inside the cupola is not influenced by the blowing-in of the coke breeze;
- for the introduction of the coke breeze up to +- 500 kg/h, the melting area inside the cupola does not change place;
- working of the cupola does not undergo variations, in fact there appears to be a tendency to work without oxidation (insufficient data makes it impossible to be more exact on this point);
-coke analysis is prefectly controlled;
- maximum allowable humidity in the coke, for the plant to be able to work well, must not exceed 1.5%.
The plant was installed at the Teksid factory and has an annual capacity of 130,000 T of mechanical castings in grey and modular iron, melted in the cupola.
The thermal efficiency of hot blast cupola furnaces depends on a charge of best quality coke. The gauged size of the coke is essential for the regular working of the cupola: this is achieved by sieving of the coke prior to introduction to the cupola.
The demonstrative plant had the function of substituting +- 4% of the coke (90-140 mm) with recovered coke breeze unusable in the cupola owing to its size (+- 8 mm). Coke breeze is collected directly under the coke vibrating screen, then transplanted pneumatically into the silos. From these it is gravity fed into a pneumatic system which meters correct dosage prior to injection, (by coaxially placed nozzles) to the tuyeres, into the coke bed area of the cupola. The solid charge takes more than 60 min. to reach the melting area, becoming iron in the composition required. It is necessary, if the injection system for the coke breeze is used, not to charge the corresponding amount of coke in the charge slip. (In fact the coke charge would have to be increased and take at least 1 hour to reach the melting area).

Wissenschaftliches Gebiet (EuroSciVoc)

CORDIS klassifiziert Projekte mit EuroSciVoc, einer mehrsprachigen Taxonomie der Wissenschaftsbereiche, durch einen halbautomatischen Prozess, der auf Verfahren der Verarbeitung natürlicher Sprache beruht. Siehe: Das European Science Vocabulary.

Dieses Projekt wurde noch nicht bei EuroSciVoc klassifiziert.
Schlagen Sie die Wissenschaftsbereiche vor, die Ihrer Einschätzung nach besonders relevant sind, und helfen Sie uns, unseren Klassifizierungsdienst zu verbessern.

Sie müssen sich anmelden oder registrieren, um diese Funktion zu nutzen

Programm/Programme

Mehrjährige Finanzierungsprogramme, in denen die Prioritäten der EU für Forschung und Innovation festgelegt sind.

Thema/Themen

Aufforderungen zur Einreichung von Vorschlägen sind nach Themen gegliedert. Ein Thema definiert einen bestimmten Bereich oder ein Gebiet, zu dem Vorschläge eingereicht werden können. Die Beschreibung eines Themas umfasst seinen spezifischen Umfang und die erwarteten Auswirkungen des finanzierten Projekts.

Aufforderung zur Vorschlagseinreichung

Verfahren zur Aufforderung zur Einreichung von Projektvorschlägen mit dem Ziel, eine EU-Finanzierung zu erhalten.

Daten nicht verfügbar

Finanzierungsplan

Finanzierungsregelung (oder „Art der Maßnahme“) innerhalb eines Programms mit gemeinsamen Merkmalen. Sieht folgendes vor: den Umfang der finanzierten Maßnahmen, den Erstattungssatz, spezifische Bewertungskriterien für die Finanzierung und die Verwendung vereinfachter Kostenformen wie Pauschalbeträge.

DEM - Demonstration contracts

Koordinator

TEKSID SPA ASTEK
EU-Beitrag
Keine Daten
Adresse
DIV. FONDERIE GHISA VIA G. AGNELLI 60
10022 CARMAGNOLA
Italien

Auf der Karte ansehen

Gesamtkosten

Die Gesamtkosten, die dieser Organisation durch die Beteiligung am Projekt entstanden sind, einschließlich der direkten und indirekten Kosten. Dieser Betrag ist Teil des Gesamtbudgets des Projekts.

Keine Daten
Mein Booklet 0 0