TELEPHONIC CONTROL AND MONITORING OF ENERGY CONSUMPTION : 'XYNTAX' IN SCHOOL BUILDINGS IN ESSEX

Obiettivo

To install control units in 12 existing schools to give optimum performance of the heating and hot-water systems by means of a land-line link to a central computer for remote-control.
The aim is a 25-30% saving on previous energy consumption levels.
Expected payback was 4 years.
Work on the buildings was finished in late 1982 and the link-ups with the central computer became operative in early 1983.
The project supervision and evaluation took place in 1983 and 1984.
The fuel consumption (adjusted with the degree-days) has been reduced by 24% compared with previous consumption.
An extra 10% reduction was reached through building improvements such as thermal insulation, air tightness, etc...
The simple payback time is 9.6 years and takes into account:
-The maintenance and operation costs, i.e. 21% of the monetary savings on fuel consumption.
-The investment devoted to building improvements: those investments reach
more than 50% of the bulk investment costs. For new installations (i.e. with
thermal efficient buildings) the simple pay back time should be 4.1 years only.
The project covers 12 schools (i.e. 20 different buildings) in and around Chelmsford, Essex, England and incorporates the following features:
1. The zoning of heat distribution in the buildings and arranging the boilers so as to permit cascade control.
2. The installation of sensors and an automatic control substation in each school to provide: - optimum heating control in each zone, giving the required room temperature only when the premises are occupied;
- cascade control of the boilers so as to use only as many as are absolutely necessary, while ensuring that the boilers do not operate at too low a temperature;
- transmission of data to the central computer by land line (temperatures, energy consumption data, warning signals, etc.)
3. The installation of a central computer to gather, store and process data from the different buildings, to signal warning and remotely adjust the parameters (preset temperatures, times of occupation, etc.) of the local control substations. This central computer enables the maintenance service to monitor a large number of buildings throughout the region with a small staff.
A special feature of the system is that the local substations are programmed to operate independently should the central computer or the link with it fail.

Campo scientifico (EuroSciVoc)

CORDIS classifica i progetti con EuroSciVoc, una tassonomia multilingue dei campi scientifici, attraverso un processo semi-automatico basato su tecniche NLP. Cfr.: Il Vocabolario Scientifico Europeo.

Questo progetto non è ancora stato classificato con EuroSciVoc.
Suggerisci i campi scientifici che ritieni più rilevanti e aiutaci a migliorare il nostro servizio di classificazione.

È necessario effettuare l’accesso o registrarsi per utilizzare questa funzione

Programma(i)

Programmi di finanziamento pluriennali che definiscono le priorità dell’UE in materia di ricerca e innovazione.

Argomento(i)

Gli inviti a presentare proposte sono suddivisi per argomenti. Un argomento definisce un’area o un tema specifico per il quale i candidati possono presentare proposte. La descrizione di un argomento comprende il suo ambito specifico e l’impatto previsto del progetto finanziato.

Invito a presentare proposte

Procedura per invitare i candidati a presentare proposte di progetti, con l’obiettivo di ricevere finanziamenti dall’UE.

Dati non disponibili

Meccanismo di finanziamento

Meccanismo di finanziamento (o «Tipo di azione») all’interno di un programma con caratteristiche comuni. Specifica: l’ambito di ciò che viene finanziato; il tasso di rimborso; i criteri di valutazione specifici per qualificarsi per il finanziamento; l’uso di forme semplificate di costi come gli importi forfettari.

DEM - Demonstration contracts

Coordinatore

Potterton Energy Controls Ltd
Contributo UE
Nessun dato
Indirizzo
Cambridge Science Park Milton Road
CB4 4BH Cambridge
Regno Unito

Mostra sulla mappa

Costo totale

I costi totali sostenuti dall’organizzazione per partecipare al progetto, compresi i costi diretti e indiretti. Questo importo è un sottoinsieme del bilancio complessivo del progetto.

Nessun dato
Il mio fascicolo 0 0