Skip to main content
Weiter zur Homepage der Europäischen Kommission (öffnet in neuem Fenster)
Deutsch Deutsch
CORDIS - Forschungsergebnisse der EU
CORDIS
Inhalt archiviert am 2024-06-11

Ibermatica s software process improvement

Ziel

The objective is to set up and put on work a measurement system for collecting and analysing all the failures together with improvements to the Development Process towards better quality.

Presently, the Software Development Process is well stabilised and organised, despite the absence of a formal description of it: it is a typical waterfall model, with an initial functional analysis (producing a Functional Specification document), a technical and a detailed design (recently producing reference documents), the coding activity and the testing activity.

THE EXPERIMENT

The experiment will have the following aims:

- to set up and put on work a measurement system for collecting and analysing all the failures and the change requests coming both during the development activities and after the release.
- to introduce within the development process activities for preventing errors and for discovering them as early as possible: process normalisation using analysis and development methodology, coding standards toward a good programming style and systematic functional testing practices introducing a testing methodology for any environment.
- to experiment in a controlled way with the above methodologies on a real project, and evaluating quantitatively the obtained advantages with respect to the past activities.

The baseline project, from the technical point of view is a typical one in a system with DB access and TP monitor, it will be run at branch level of the bank.

The size of developing unit is about 70 full time staff.

EXPECTED IMPACT AND EXPERIENCE

The experiment will have the following aims:

- to set up and put on work a measurement system for collecting and analysing all the failures and the change requests coming both during the development activities and after the release.
- to introduce within the development process activities for preventing errors and for discovering them as early as possible: process normalisation using analysis and development methodology, coding standards toward a good programming style and systematic functional testing practices introducing a testing methodology for any environment.
- to experiment in a controlled way with the above methodologies on a real project, and evaluating quantitatively the obtained advantages in respect to the past activities.

The baseline project, from the technical point of view is a typical one in a system with DB access and TP monitor, it will be run at branch level of the bank.

The size of developing unit is about 70 full time staff.

Wissenschaftliches Gebiet (EuroSciVoc)

CORDIS klassifiziert Projekte mit EuroSciVoc, einer mehrsprachigen Taxonomie der Wissenschaftsbereiche, durch einen halbautomatischen Prozess, der auf Verfahren der Verarbeitung natürlicher Sprache beruht. Siehe: Das European Science Vocabulary.

Sie müssen sich anmelden oder registrieren, um diese Funktion zu nutzen

Programm/Programme

Mehrjährige Finanzierungsprogramme, in denen die Prioritäten der EU für Forschung und Innovation festgelegt sind.

Thema/Themen

Aufforderungen zur Einreichung von Vorschlägen sind nach Themen gegliedert. Ein Thema definiert einen bestimmten Bereich oder ein Gebiet, zu dem Vorschläge eingereicht werden können. Die Beschreibung eines Themas umfasst seinen spezifischen Umfang und die erwarteten Auswirkungen des finanzierten Projekts.

Aufforderung zur Vorschlagseinreichung

Verfahren zur Aufforderung zur Einreichung von Projektvorschlägen mit dem Ziel, eine EU-Finanzierung zu erhalten.

Daten nicht verfügbar

Finanzierungsplan

Finanzierungsregelung (oder „Art der Maßnahme“) innerhalb eines Programms mit gemeinsamen Merkmalen. Sieht folgendes vor: den Umfang der finanzierten Maßnahmen, den Erstattungssatz, spezifische Bewertungskriterien für die Finanzierung und die Verwendung vereinfachter Kostenformen wie Pauschalbeträge.

ACM - Preparatory, accompanying and support measures

Koordinator

Ibermatica
EU-Beitrag
Keine Daten
Adresse
P. Mikeletegi 5
20009 San Sebastian
Spanien

Auf der Karte ansehen

Gesamtkosten

Die Gesamtkosten, die dieser Organisation durch die Beteiligung am Projekt entstanden sind, einschließlich der direkten und indirekten Kosten. Dieser Betrag ist Teil des Gesamtbudgets des Projekts.

Keine Daten
Mein Booklet 0 0