Ziel
SIRTAKI plans to improve tunnel safety by the development and assessment of an advanced tunnel management system that specifically tackles (i) safety issues and emergencies and (ii) the integration within the overall network management. The benefits expected as result of the Project are measured in technical, social and economic terms, in particular by: Improving safety in tunnels: reducing the risk of accidents in tunnels and the severity of those taking place; Reducing stress in operators and citizens in front of an emergency; Managing tunnels and the rest of the transport network in a co-ordinated way and therefore improving the performance of the available transport infrastructures; Performing the integrated management of not only emergencies, but also other special situations -e.g. congestion, maintenance works, etc. The prototypes will be evaluated in four pilot tunnels in Spain, Italy, France and Germany. These tunnels will be road (urban, interurban), metro and railway which will validate the system developed in a wide range of situations.
Objectives:
- To develop an integrated prototype of tunnel management and decision support system (DSS) to increase tunnel safety, which will be composed by four modules:
a. Tunnel Control Model: an abstraction layer independent of any specific tunnel, which will facilitate an easier customisation of SIRTAKI to the characteristics of the tunnel, the control system and the environment in which it will be applied;
b. Inference Module (IM): a real time decision support system that will help crisis managers to take decisions in emergency situations by automatically identifying potentially dangerous situations;
c. Knowledge Basis: a learning tool that will support training, decision taking and automation of actions by applying previous experiences in emergency management and simulation of emergency situations;
d. Working Environment: it will cover not only the GUI but also those necessary aspects to guarantee the adequate support to the user in critical moments;
- To integrate and validate the SIRTAKI results in five test sites with different characteristics and requirements (urban/interurban, road/railway, etc.) in France, Germany, Italy and Spain;
- To establish a methodology and accompanying guidelines to facilitate the cost-effective adoption of the project results by any tunnel operator in Europe from the project results and lessons learned.
Work description:
The work will begin with the identification of the needs of the users with regards to a decision support system for safety and emergency management in road rail tunnels. The relevant Users will be identified and classified: tunnel operators, Local Authorities, emergency services. The main system requirements and socio-economic constraints will be extracted as conclusions from both user requirements and current system capabilities. Then the Users Requirements will be traced into technical specifications of the system as a whole and of the individual modules. Functional specifications will be provided for SIRTAKI modules: Tunnel Management Model, Inference Module, Knowledge Basis, and Tunnel Operator Working Environment. In each description there is a special focus on the results of the user poll done before to take care of their needs and wishes. An in-depth analysis of the evidenced user needs and system requirements will then be carried out in order to properly design the SIRTAKI DSS.
The next step will be the development of the four modules of SIRTAKI and their integration in the SIRTAKI prototype in laboratory to be fully tested before its installation in the five sites. An Evaluation Plan will be produced stating the methodology, scenarios and expected results for the evaluation. The Evaluation will be applied to the Final prototypes in the five pilot tunnels: Spain (2 road tunnels: 1 urban, 1 interurban), Germany (1 rail tunnel), France (1 metro tunnel) and Italy (1 road interurban tunnel). The conclusions from the individual evaluations and the lessons learned would be merged into a common practice, and guidelines for transferability of the SIRTAKI results to other tunnel management situations will be outlined. The final product will be exploited by the consortium partners: tunnel managers plan to apply SIRTAKI solution in order to increase safety in their tunnels, system suppliers plan to commercially exploit SIRTAKI, universities, research institutes and consultants plan use the conclusions extracted as best practice solutions for tunnel security.
Milestones:
M1 Users Requirements compiled in D1.1;
M2 System Specifications edited in D2.1;
M3 System Design & Implementation reported in D3.1;
M4 SIRTAKI First Prototype: D4.1 first prototype integrated and tested;
M5 Site Prototypes: D5.1 D5.2 D5.3 and D5.4 results from the development and installation of the prototypes in each site;
M6 Validated Prototypes: D6.1 D6.2 and D6.3 evaluation plan, results and transferability;
M7 Exploitation and dissemination plans reported in D7.1 and D7.2.
Wissenschaftliches Gebiet (EuroSciVoc)
CORDIS klassifiziert Projekte mit EuroSciVoc, einer mehrsprachigen Taxonomie der Wissenschaftsbereiche, durch einen halbautomatischen Prozess, der auf Verfahren der Verarbeitung natürlicher Sprache beruht. Siehe: Das European Science Vocabulary.
CORDIS klassifiziert Projekte mit EuroSciVoc, einer mehrsprachigen Taxonomie der Wissenschaftsbereiche, durch einen halbautomatischen Prozess, der auf Verfahren der Verarbeitung natürlicher Sprache beruht. Siehe: Das European Science Vocabulary.
- Technik und Technologie Elektrotechnik, Elektronik, Informationstechnik Elektrotechnik Steuerungssysteme
- Sozialwissenschaften Soziologie industrielle Beziehungen Automatisierung
Sie müssen sich anmelden oder registrieren, um diese Funktion zu nutzen
Wir bitten um Entschuldigung ... während der Ausführung ist ein unerwarteter Fehler aufgetreten.
Sie müssen sich authentifizieren. Ihre Sitzung ist möglicherweise abgelaufen.
Vielen Dank für Ihr Feedback. Sie erhalten in Kürze eine E-Mail zur Übermittlungsbestätigung. Wenn Sie sich für eine Benachrichtigung über den Berichtsstatus entschieden haben, werden Sie auch im Falle einer Änderung des Berichtsstatus benachrichtigt.
Programm/Programme
Mehrjährige Finanzierungsprogramme, in denen die Prioritäten der EU für Forschung und Innovation festgelegt sind.
Mehrjährige Finanzierungsprogramme, in denen die Prioritäten der EU für Forschung und Innovation festgelegt sind.
Thema/Themen
Aufforderungen zur Einreichung von Vorschlägen sind nach Themen gegliedert. Ein Thema definiert einen bestimmten Bereich oder ein Gebiet, zu dem Vorschläge eingereicht werden können. Die Beschreibung eines Themas umfasst seinen spezifischen Umfang und die erwarteten Auswirkungen des finanzierten Projekts.
Aufforderungen zur Einreichung von Vorschlägen sind nach Themen gegliedert. Ein Thema definiert einen bestimmten Bereich oder ein Gebiet, zu dem Vorschläge eingereicht werden können. Die Beschreibung eines Themas umfasst seinen spezifischen Umfang und die erwarteten Auswirkungen des finanzierten Projekts.
Aufforderung zur Vorschlagseinreichung
Verfahren zur Aufforderung zur Einreichung von Projektvorschlägen mit dem Ziel, eine EU-Finanzierung zu erhalten.
Daten nicht verfügbar
Verfahren zur Aufforderung zur Einreichung von Projektvorschlägen mit dem Ziel, eine EU-Finanzierung zu erhalten.
Finanzierungsplan
Finanzierungsregelung (oder „Art der Maßnahme“) innerhalb eines Programms mit gemeinsamen Merkmalen. Sieht folgendes vor: den Umfang der finanzierten Maßnahmen, den Erstattungssatz, spezifische Bewertungskriterien für die Finanzierung und die Verwendung vereinfachter Kostenformen wie Pauschalbeträge.
Finanzierungsregelung (oder „Art der Maßnahme“) innerhalb eines Programms mit gemeinsamen Merkmalen. Sieht folgendes vor: den Umfang der finanzierten Maßnahmen, den Erstattungssatz, spezifische Bewertungskriterien für die Finanzierung und die Verwendung vereinfachter Kostenformen wie Pauschalbeträge.
Koordinator
46014 VALENCIA
Spanien
Die Gesamtkosten, die dieser Organisation durch die Beteiligung am Projekt entstanden sind, einschließlich der direkten und indirekten Kosten. Dieser Betrag ist Teil des Gesamtbudgets des Projekts.