DESIGN AND DEVELOPMENT OF AN INSERT WELLHEAD COMPLETION SYSTEM FOR THE SUBSEA PRODUCTION OF HYDROCARBON RESERVES

Objetivo

Design, manufacture and installation of an insert wellhead completion system offering the inherent safety feature of a protected submudline valve block combined with a low profile above seabed.
To date this is the only insert tree system built and installed.
The project was conceived in may 1978. Manufacture of the completion equipment and acceptance testing were completed february 1980. Field installation was completed june 1982 by the opening up of the well into the offshore production.

Convocatoria de propuestas

Data not available

Régimen de financiación

DEM - Demonstration contracts

Coordinador

SHELL INTERNATIONAL PETROLEUM MAATSCHAPPIJ (SIPM
Aportación de la UE
Sin datos
Dirección
POSTBUS 62 KAREL VAN BIJLANDTLAAN 130
2501 AN DEN HAAG
Países Bajos

Ver en el mapa

Coste total
Sin datos