Cel Design, manufacture and installation of an insert wellhead completion system offering the inherent safety feature of a protected submudline valve block combined with a low profile above seabed.To date this is the only insert tree system built and installed.The project was conceived in may 1978. Manufacture of the completion equipment and acceptance testing were completed february 1980. Field installation was completed june 1982 by the opening up of the well into the offshore production. Program(-y) ENG-HYDROCARB 1C - Programme (EEC) of Community projects in the hydrocarbons sector, 1973-1985 Temat(-y) 1.9 - PRODUCTION SYSTEMS Zaproszenie do składania wniosków Data not available System finansowania DEM - Demonstration contracts Koordynator SHELL INTERNATIONAL PETROLEUM MAATSCHAPPIJ (SIPM Wkład UE Brak danych Adres POSTBUS 62 KAREL VAN BIJLANDTLAAN 130 2501 AN DEN HAAG Niderlandy Zobacz na mapie Koszt całkowity Brak danych