Obiettivo Design, manufacture and installation of an insert wellhead completion system offering the inherent safety feature of a protected submudline valve block combined with a low profile above seabed.To date this is the only insert tree system built and installed.The project was conceived in may 1978. Manufacture of the completion equipment and acceptance testing were completed february 1980. Field installation was completed june 1982 by the opening up of the well into the offshore production. Programma(i) ENG-HYDROCARB 1C - Programme (EEC) of Community projects in the hydrocarbons sector, 1973-1985 Argomento(i) 1.9 - PRODUCTION SYSTEMS Invito a presentare proposte Data not available Meccanismo di finanziamento DEM - Demonstration contracts Coordinatore SHELL INTERNATIONAL PETROLEUM MAATSCHAPPIJ (SIPM Contributo UE Nessun dato Indirizzo POSTBUS 62 KAREL VAN BIJLANDTLAAN 130 2501 AN DEN HAAG Paesi Bassi Mostra sulla mappa Costo totale Nessun dato