DESIGN AND DEVELOPMENT OF AN INSERT WELLHEAD COMPLETION SYSTEM FOR THE SUBSEA PRODUCTION OF HYDROCARBON RESERVES

Obiettivo

Design, manufacture and installation of an insert wellhead completion system offering the inherent safety feature of a protected submudline valve block combined with a low profile above seabed.
To date this is the only insert tree system built and installed.
The project was conceived in may 1978. Manufacture of the completion equipment and acceptance testing were completed february 1980. Field installation was completed june 1982 by the opening up of the well into the offshore production.

Invito a presentare proposte

Data not available

Meccanismo di finanziamento

DEM - Demonstration contracts

Coordinatore

SHELL INTERNATIONAL PETROLEUM MAATSCHAPPIJ (SIPM
Contributo UE
Nessun dato
Indirizzo
POSTBUS 62 KAREL VAN BIJLANDTLAAN 130
2501 AN DEN HAAG
Paesi Bassi

Mostra sulla mappa

Costo totale
Nessun dato