A DEMONSTRATION OF THE COMMERCIALISATION POTENTIAL (VALAR 2,5 MW)

Obiettivo

To demonstrate that by combining two innovative techniques a 2.5 MW offshore wind farm can be constructed more economically than previously believed.
The amount of installed effect of wind generation that an existing electrical grid can accept is often limited by the voltage quality requirements eg. 'flicker'. With the use of a new control system the windfarm can be connected to a "weaker" transmission network.
With this project we aim to demonstrate that with electronic control systems installed in 3 out of 5 WEC's in the wind fann the existing electrical grid can handle a generated output from the wind farm upto a value that is limited only by the thermal overload of the transmission cables. Thus the use of the electronic controllers reduces the requirement for expensive grid strengthening.
The costs of the installation are also reduced through the use of rock-socketed monopile foundations constructed with the aid of a floating jack up barge. With this method the construction period and erection costs of the offshore installation at Bockstigen Valar can be substantially reduced compared with previous offshore installations.
The aims with this project is also to provide better knowledge of:
* offshore windresources
and how offshore windpower influences
* flora and fauna
* the landscape picture
* seafaring.

The site of the project has an estimated mean annual windspeed of 8.0m/s and is on shallow ground in the Baltic sea approximately 4km from the coast of Gotland. The windfarm will consist of of 5 No.stall regulated WEC's type Wind World W-3700/500kW located 250 m apart in a V-formation. The estimated average annual output of the WEC's is 8000 MWh/yr. The WEC's will be specially modified to facilitate service and maintenance offshore. The modifications will involve providing special access decks and 0.69/10 kV transformers will be installed in the base of each of the towers. New "intelligent" electronic control systems by 'Westcontrol' will be installed into the base of 3 of the turbines to enable the wind turbines to be connected into the existing grid without additional grid strenghthening. The controllers will enable the 3 wind turbines to operate at variable speed and will also improve the voltage quality of the electrical output from the remaining turbines in the windfarm.
The turbines will be installed at water depths between 5m and 6.5m using rock-socketed steel monopile foundations 2.65m dia. by 16m long, and erected using one of Seacore's mobile jack up barges. The use of a stable jack up barge simplifies the drilling and erection operation and minimises the number possible delays due to adverse weather, resulting in a total erection period of (35) days.
The installation will be connected via a 3 x 240 mm2 PEX aluminium cable with integrated fibre-optic cable, into the existing land based grid which is operated by Gotland's utility GEAB.tallation will be connected via a 3 x 240 mm2 PEX aluminium cable with integrated fibre-optic cable, into the existing land based grid which is operated by Gotland's utility GEAB.

Programma(i)

Programmi di finanziamento pluriennali che definiscono le priorità dell’UE in materia di ricerca e innovazione.

Argomento(i)

Gli inviti a presentare proposte sono suddivisi per argomenti. Un argomento definisce un’area o un tema specifico per il quale i candidati possono presentare proposte. La descrizione di un argomento comprende il suo ambito specifico e l’impatto previsto del progetto finanziato.

Invito a presentare proposte

Procedura per invitare i candidati a presentare proposte di progetti, con l’obiettivo di ricevere finanziamenti dall’UE.

Dati non disponibili

Meccanismo di finanziamento

Meccanismo di finanziamento (o «Tipo di azione») all’interno di un programma con caratteristiche comuni. Specifica: l’ambito di ciò che viene finanziato; il tasso di rimborso; i criteri di valutazione specifici per qualificarsi per il finanziamento; l’uso di forme semplificate di costi come gli importi forfettari.

DEM - Demonstration contracts

Coordinatore

VINDKOMPANIET AB
Contributo UE
Nessun dato
Indirizzo
BOX 21
620 HEMSE
Svezia

Mostra sulla mappa

Costo totale

I costi totali sostenuti dall’organizzazione per partecipare al progetto, compresi i costi diretti e indiretti. Questo importo è un sottoinsieme del bilancio complessivo del progetto.

Nessun dato
Il mio fascicolo 0 0