HANSTHOLM HARBOUR ONSHORE WIND TURBINE FARM

Ziel

The aim of the project is to carry on with an EC and Danish financed research and development project (EN3W - 0071-DK) of a 925 kW stall regulated wind turbine for commercial utilization. A wind farm of 4 wind turbines will be located at the beach of the North Sea whereby optimum production of energy and protection of an exposed stretch of coast is obtained.
The wind farm will be integrated in a coast protecting plan near the harbour. Hereby it will be demonstrated that wind turbines on an economical basis, without disadvantages, can be located at untraditional localities which is in the planning are not traditionally considered as useable for erection of wind turbines.
The annual calculalet production of electricity will be 5 MWh's which give a payback time of 8 years.
1. Integration and coast protection :
The project has provided valuable practical experience with on-shore foundation, and this experience is directly applicable to wind turbines forming part of coastal protection.
In the years to come, the Danish Coast Inspectorate expects a withdrawal of the coastline at the onshore farm.
A result of a withdrawal will be that the foundations will act as nuclei of a current reconstruction of the coastline like ordinary breakwaters, groynes, and the like.
The future development will decide whether it will be necessary to connect the foundations with the coastline.
In that the foundations will form the heads of actual coast protection groynes.
2. Technical optimization :
The result of the technical optimisation has been the development of a successful wind turbine design which is specially adapted to the on-shore environment.
The technical adaptation includes full exploitation of the superior wind resources and seaproof foundations able to withstand direct exposure to the sea.
3. Energy production :
In 1997, the total amount of electricity produced in 1997 by the wind turbine park was 5.6 GWh. The estimated production was 5 GWh. The part produced by the prototype wind turbine was 1.31 GWh which means that the three new wind turbines produced 4.29 GWh. This is 1.43 GWh each in average, 9% more than the prototype.
However, one of the wind new turbines was out of operation for one month. With a full production, the total production of the new turbines would have been approximately 4.41 GWh.
The corresponding production per new turbine is 1.47 GWh which is 12% higher than the prototype
The innovative part of the project consists of the following main points :
1. Integration of windfarm and coast protection.
2. Optimizing of materials in the wind turbine, and construction of various moulds and models for prefabrication.
3. Optimizing of the wind turbine's aerodynamic adjustment with a view to an optimizing of the wind turbine's annual production of energy.
By integrating a wind farm in the coast protection it is possible to achieve a competitive price for the electricity compared with turbines placed at traditional in land locations.
Energy key figure = project price/annual production = Dkk/kWh/year
Onshore wind farm : Energy key figure = 2,86 DDK/kWh/year
Corresponding project at inland location, roughness class 2: Energy key figure = 3,61 DDK/kWh/year.

Wissenschaftliches Gebiet (EuroSciVoc)

CORDIS klassifiziert Projekte mit EuroSciVoc, einer mehrsprachigen Taxonomie der Wissenschaftsbereiche, durch einen halbautomatischen Prozess, der auf Verfahren der Verarbeitung natürlicher Sprache beruht. Siehe: Das European Science Vocabulary.

Dieses Projekt wurde noch nicht bei EuroSciVoc klassifiziert.
Schlagen Sie die Wissenschaftsbereiche vor, die Ihrer Einschätzung nach besonders relevant sind, und helfen Sie uns, unseren Klassifizierungsdienst zu verbessern.

Sie müssen sich anmelden oder registrieren, um diese Funktion zu nutzen

Programm/Programme

Mehrjährige Finanzierungsprogramme, in denen die Prioritäten der EU für Forschung und Innovation festgelegt sind.

Thema/Themen

Aufforderungen zur Einreichung von Vorschlägen sind nach Themen gegliedert. Ein Thema definiert einen bestimmten Bereich oder ein Gebiet, zu dem Vorschläge eingereicht werden können. Die Beschreibung eines Themas umfasst seinen spezifischen Umfang und die erwarteten Auswirkungen des finanzierten Projekts.

Daten nicht verfügbar

Aufforderung zur Vorschlagseinreichung

Verfahren zur Aufforderung zur Einreichung von Projektvorschlägen mit dem Ziel, eine EU-Finanzierung zu erhalten.

Daten nicht verfügbar

Finanzierungsplan

Finanzierungsregelung (oder „Art der Maßnahme“) innerhalb eines Programms mit gemeinsamen Merkmalen. Sieht folgendes vor: den Umfang der finanzierten Maßnahmen, den Erstattungssatz, spezifische Bewertungskriterien für die Finanzierung und die Verwendung vereinfachter Kostenformen wie Pauschalbeträge.

DEM - Demonstration contracts

Koordinator

HANSTHOLM-MOELLEN APS
EU-Beitrag
Keine Daten
Adresse
NIELS JUELSVEJ 9
7730 HANSTHOLM
Dänemark

Auf der Karte ansehen

Gesamtkosten

Die Gesamtkosten, die dieser Organisation durch die Beteiligung am Projekt entstanden sind, einschließlich der direkten und indirekten Kosten. Dieser Betrag ist Teil des Gesamtbudgets des Projekts.

Keine Daten
Mein Booklet 0 0