Use of a hydro-pneumatic clearing machine to reduce the physical strain involved in breaking out refractory material in converters

Cel

Aims of project:

The aim of the project is to reduce the physically demanding work associated with breaking out converters. At present the job is performed by workers using pneumatic drills inside the converters.

The development work will be carried out in the following stages:

Analysis of the current situation
Preparation of a system analysis
Anthropometric studies
Registering and processing of information
Analysis of conceivable incidents
Training of the operators concerned by the project
Study and assessment of the target situation.

Temat(-y)

Data not available

Zaproszenie do składania wniosków

Data not available

System finansowania

Data not available

Koordynator

Klöckner Stahl GmbH
Wkład UE
Brak danych
Adres
Bayreuther Straße 2
92237 Sulzbach-Rosenberg
Niemcy

Zobacz na mapie

Koszt całkowity
Brak danych