The deliverable aims to provide the set of design documentation required to authorize and perform the retrofit work on the second case study (T8.2). The indicator of success is the full completion of the necessary documentation (descriptive reports, drawings, bill of materials, etc.).
Dissemination and communication strategy and plan I (öffnet in neuem Fenster)The document is the first version of the Communication & Dissemination Strategy (T10.1-T10.3). The document will guide for all dissemination and communication activities throughout the duration of the project. The strategy contains the description of the activities included in the dissemination and communications plan, including a detailed plan for demonstration activities. The indicator of success is the completeness of the plan its meeting KPIs and targets set in the strategy.
Methodology to test the reliability of subsystems I (öffnet in neuem Fenster)The deliverable aims to define the scenarios of the external agents and actions to be assumed for the setup of the laboratory test, the testing procedures to be applied for the laboratory test of systems and components reliability and will provide criteria and methods to interpret the laboratory test results (T3.1). The indicator of success is the comprehensiveness in respect to RE-SKIN components.
Dissemination and communication strategy and plan II (öffnet in neuem Fenster)The document is the updated version of the Communication & Dissemination Strategy (T10.1-T10.3). The document will guide for all dissemination and communication activities for the remaining duration of the project. The strategy contains the description of the activities included in the dissemination and communications plan, including a detailed plan for demonstration activities. The indicator of success is the completeness of the plan its meeting KPIs and targets set in the strategy.
Optimized technical specifications of each component I (öffnet in neuem Fenster)This deliverable contains the first release of the optimized technical specification of each component of the toolkit (T4.1). In detail, the features of the components/solutions of each consortium partner, which represent the baseline for the development of the toolkit, must be reported. The indicator of success is to provide all the required data (for each component) in a common datasheet format in order to collect all the basic information needed within a standardized framework.
Operative standardization procedures and CoC model I (öffnet in neuem Fenster)The deliverable is constituted by a set of documents aimed at standardizing the delivery on the market of recycled/reused/repurposed and biosourced components of the RESKIN system (T7.3-T7.4). The documents will include: process specifications for the remanufacturing/reuse activities; technical data sheets with performances and characteristics of the re-(manufactured/used/cycled) components; process qualification procedures to assure that the re- components will provide the expected performances and characteristics. The indicator of success is the comprehensiveness in respect to RE-SKIN components.
Project management and quality Plan I (öffnet in neuem Fenster)The scope of this deliverable is to preliminary define all key procedures related to project scientific/administrative management and quality assurance and control (T1.1 and 1.2) such as the project organization strategy, the procedures, the roles and responsibilities related to project and quality management, etc. The indication of success is the comprehensiveness/clarity of the procedures according to what established in the Grant Agreement.
Project management and quality Plan III (öffnet in neuem Fenster)The scope of this deliverable is to define the final version of key procedures related to project scientific/administrative management and quality assurance and control (T1.1 and 1.2) such as the project organization strategy, the procedures, the roles and responsibilities related to project and quality management, etc. The indication of success is the comprehensiveness/clarity of the procedures and the evidence of smooth advancement of the project according to what established in the Grant Agreement.
Requirements to optimize resilience and maintenance I (öffnet in neuem Fenster)The deliverable provides a set of maintainability factors that shall be used during the basic design stage for the whole system configuration and during detailed design (or procurement) of the main sub-components (T3.1-T3.2). The deliverable will also include a specific procedure to perform maintainability reviews during the design process at appropriate stages.
Optimized installation and disassembly procedures II (öffnet in neuem Fenster)The document aims to provide the second version of the decommissioning and disassembly procedures of every package’s component (T4.4 and T4.5). The indicator of success will be the establishment of improved technical specifications for each component of the system.
Manufacturing design of the multifunctional façade cladding I (öffnet in neuem Fenster)The document provides the first version of the specification of the manufacturing design of the multifunctional façade cladding and the results of preliminary pilot testing (T5.1), preparatory to application in the first case study. The indicator of success is the completeness of the technical specification and the successfulness of first testing activities.
Energy audits and surveys II (öffnet in neuem Fenster)The aim of the document is to provide a comprehensive energy audit of the pre-retrofit state of the second case study building as wall as an overall survey of its architectonical and technical systems features (T8.1). The indicator of success is the full completion of the audit and survey phase.
Manufacturing design of the technical components I (öffnet in neuem Fenster)The document provides the first version of the specification of the manufacturing design of the technical systems and the results of preliminary pilot testing (T6.1-T6.5), preparatory to application in the first case study. The indicator of success is the completeness of the technical specification and the successfulness of first testing activities.
Manufacturing design of the BIPVT roof system I (öffnet in neuem Fenster)The document provides the first version of the specification of the manufacturing design of the BIPVT roof and the results of preliminary pilot testing (T5.3), preparatory to application in the first case study. The indicator of success is the completeness of the technical specification and the successfulness of first testing activities.
Manufacturing design of the technical components II (öffnet in neuem Fenster)The document provides the second version of the specification of the manufacturing design of the technical systems and the results of pilot testing (T6.1-T6.5), preparatory to application in the second case study. The indicator of success is the completeness of the technical specification and the successfulness of first testing activities.
Business Models Design Report (öffnet in neuem Fenster)The report aims to describe the results of the screening process through the SWOT and the economic feasibility study as long as the selection of best suitable business models for the exploitation of RE-SKIN (T9.2). The indicator of success is the comprehensiveness and completion of the proposed business models.
Optimized installation and disassembly procedures I (öffnet in neuem Fenster)The document aims to provide the first version of the decommissioning and disassembly procedures of every package’s component (T4.4 and T4.5). The indicator of success will be the establishment of improved technical specifications for each component of the system.
Verification of the final configuration of the system I (öffnet in neuem Fenster)The aim of the document is to provide an updated simulation about the interaction and the behaviour of the entire system (T4.3) once RE-SKIN subcomponents have been further optimized and tested individually. The indicator of success is the positive result of the simulations in respect to the expected system performances.
Application context periodic update I (öffnet in neuem Fenster)The aim of the document is to provide the first periodic update of the application context in the target countries (T2.1-2.4) and the results of the site risk assessment (T2.6). The indicator of success is to give a comprehensive overview of all the key elements of the context (e.g. retrofit market status, regulatory framework, etc.) and of the site risk assessment (e.g. multihazard and multirisk assessment maps) for every target country of the application context.
Circular economy evaluation procedure/tool (öffnet in neuem Fenster)The document aims to describe in details algorithms/procedures and the overall structure of the circular economy evaluation tool (T7.1). The indicator of success is the comprehensiveness of the description of all elements involved in the tool.
Energy audits and surveys I (öffnet in neuem Fenster)The aim of the document is to provide a comprehensive energy audit of the pre-retrofit state of the first case study building as wall as an overall survey of its architectonical and technical systems features (T8.1). The indicator of success is the full completion of the audit and survey phase.document contains the results of the energy audits before the retrofit interventions.
Final design of the renovation intervention I (öffnet in neuem Fenster)The deliverable aims to provide the set of design documentation required to authorize and perform the retrofit work on the first case study (T8.2). The indicator of success is the full completion of the necessary documentation (descriptive reports, drawings, bill of materials, etc.).
Manufacturing design of the multifunctional façade cladding III (öffnet in neuem Fenster)The document provides the third version of the specification of the manufacturing design of the multifunctional façade cladding and the results of pilot testing (T5.1), preparatory to application in the third case study. The indicator of success is the completeness of the technical specification and the successfulness of first testing activities.
Manufacturing design of the multifunctional façade cladding II (öffnet in neuem Fenster)The document provides the second version of the specification of the manufacturing design of the multifunctional faade cladding and the results of pilot testing (T5.1), preparatory to application in the second case study. The indicator of success is the completeness of the technical specification and the successfulness of first testing activities.
Verification of the final configuration of the system II (öffnet in neuem Fenster)The documents describe the specification of the final configuration of the system, including also the verification reports.
Application context periodic update II (öffnet in neuem Fenster)The aim of the document is to provide the second periodic update of the application context in the target countries (T2.1-2.4) and the results of the site risk assessment (T2.6). The indicator of success is to give a comprehensive overview of all the key elements of the context (e.g. retrofit market status, regulatory framework, etc.) and of the site risk assessment (e.g. multihazard and multirisk assessment maps) for every target country of the application context.
Project management and quality Plan II (öffnet in neuem Fenster)The scope of this deliverable is to update key procedures related to project scientific/administrative management and quality assurance and control (T1.1 and 1.2) such as the project organization strategy, the procedures, the roles and responsibilities related to project and quality management, etc. The indication of success is the comprehensiveness/clarity of the procedures and the evidence of smooth advancement of the project according to what established in the Grant Agreement.
Manufacturing design of the BIPVT roof system II (öffnet in neuem Fenster)The document provides the second version of the specification of the manufacturing design of the BIPVT roof and the results of pilot testing (T5.3), preparatory to application in the second case study. The indicator of success is the completeness of the technical specification and the successfulness of first testing activities.
Optimized technical specifications of each component II (öffnet in neuem Fenster)This deliverable contains the update of the the optimized technical specification of each component of the toolkit (T4.1). Starting from the features of the components/solutions of each consortium partner that have been reported in D4.1, which represent the baseline for the development of the toolkit, the technical specifications of each new or updated element are defined. The indicator of success is the update of all the required data (for each component) in a common datasheet format in order to collect all the basic information needed within a standardized framework.
Stakeholders Mapping and Workshops Results (öffnet in neuem Fenster)The aim of the document is to provide the maps of involved stakeholders and the summary of results of co-design workshops (T9.1). The indicator of success is the completeness of the mapping activity with respect to the target context.
The aim of the deliverable is to describe the final envelope components manufactured for the demonstration phase in the second case study (T5.1-T5.4). The indicator of success is the completion of the manufacturing process for all needed components.
Envelope components for on-field demonstration I (öffnet in neuem Fenster)The aim of the deliverable is to describe the final envelope components manufactured for the demonstration phase in the first case study (T5.1-T5.4). The indicator of success is the completion of the manufacturing process for all needed components.
Lab testing report I (öffnet in neuem Fenster)The document provides the draft template for lab testing report based on input from work done in T3.1 and described in D3.1. The mean of verification is the completeness of the testing procedures regarding RE-SKIN components.
Technical components for on-field demonstration II (öffnet in neuem Fenster)The aim of the deliverable is to describe the final technical systems manufactured for the demonstration phase in the second case study (T6.1-T6.5). The indicator of success is the completion of the manufacturing process for all needed components.
Lab testing report II (öffnet in neuem Fenster)The document aims to provide the final template for lab testing report, updating the draft template based on input from D3.5 and the methodology defined under T3.1 and described in D3.2. The document also contains the results of the first testing activities. The mean of verification is the completeness of the testing procedures regarding RE-SKIN components.
Technical components for on-field demonstration I (öffnet in neuem Fenster)The aim of the deliverable is to describe the final technical systems manufactured for the demonstration phase in the first case study (T6.1-T6.5). The indicator of success is the completion of the manufacturing process for all needed components.
Envelope components for on-field demonstration III (öffnet in neuem Fenster)The aim of the deliverable is to describe the final envelope components manufactured for the demonstration phase in the third case study (T5.1-T5.4). The indicator of success is the completion of the manufacturing process for all needed components.
Veröffentlichungen
Autoren:
A. Dalla Valle; M. Lavagna; A. Campioli; F. Leonforte; N. Aste
Veröffentlicht in:
2024
Herausgeber:
Associazione Rete Italiana LCA
Autoren:
Niccolò Aste, Claudio Del Pero, Fabrizio Leonforte, Harold Enrique Huerto Cardenas
Veröffentlicht in:
2025 International Conference on Clean Electrical Power (ICCEP), 2025
Herausgeber:
IEEE
DOI:
10.1109/ICCEP65222.2025.11143698
Autoren:
H. E. Huerto-Cardenas, N. Aste, C. Del Pero, F. Leonforte, F. Asvadi
Veröffentlicht in:
2025 International Conference on Clean Electrical Power (ICCEP), 2025
Herausgeber:
IEEE
DOI:
10.1109/ICCEP65222.2025.11143713
Suche nach OpenAIRE-Daten ...
Bei der Suche nach OpenAIRE-Daten ist ein Fehler aufgetreten
Es liegen keine Ergebnisse vor