CORDIS fornisce collegamenti ai risultati finali pubblici e alle pubblicazioni dei progetti ORIZZONTE.
I link ai risultati e alle pubblicazioni dei progetti del 7° PQ, così come i link ad alcuni tipi di risultati specifici come dataset e software, sono recuperati dinamicamente da .OpenAIRE .
Risultati finali
This deliverable will report the functionalities that the project will deliver for HEMS and BEMS (T4.1, T4.2, T4.3)
Plug and Play Asset Registration (si apre in una nuova finestra)The deliverable will describe the methodology for plug and play asset registration and the architecture and the services developed that will allow assets to auto-registered via the blockchain to the OPENTUNITY platform. (T3.3)
Project Management Plan (v1) (si apre in una nuova finestra)It includes all project management procedures and templates, a detailed technical, implementation plan, the risk assessment and ethics monitoring frameworks. (T1.1, T1.2, T1.3)
Federated Data Exchange Infrastructure Architecture (si apre in una nuova finestra)The deliverable will present OPENTUNITY’s Federated Data Exchange Infrastructure (FDEI) architecture, as well as document the service and interfaces developed to support the management of data space participants and data/service offerings (T3.1, T3.2, T3.4).In the Annex will appear the related Use Cases about Data Spaces and the SGAM layers about those Use Cases.
Optimal selection of available flexibility (v1) (si apre in una nuova finestra)This deliverable shows the optimization algorithms that the project will provide to aggregators in order to select the most suitable flexibility sources under its portfolio of clients. (T4.4)
OPENTUNITY asset and planning developments (v2) (si apre in una nuova finestra)This deliverable will include all the developments made to ensure a proper long-term management of the operations of DSOs and TSOs and the different assets under their control. (T5.4, T5.5)
Dissemination and Communication activities Report (v2) (si apre in una nuova finestra)A report will be generated after each of the planned workshops, dissemination and communication activities containing the minutes, report, photo or video overview of the meeting, presentation used, participants list or number of people present, and feedback from- if appropriate-: the stakeholder group, people present. This content will be included in this deliverable which will be updated on Month 30 and Month 48. (T8.1, T8.2 and T8.3)
OPENTUNITY power flow developments (v1) (si apre in una nuova finestra)This deliverable will include all the developments made by the project addressed to the management of the power flows of the grids. (T5.2, T5.3)
Federated Data Exchange Infrastructure Architecture (v2) (si apre in una nuova finestra)The deliverable will present OPENTUNITY’s Federated Data Exchange Infrastructure (FDEI) architecture, as well as document the service and interfaces developed to support the management of data space participants and data/service offerings (T3.1, T3.2, T3.4).
Deployment and demonstration plan (si apre in una nuova finestra)This deliverable will report the deployment and demonstration plan of the Pilot Sites that will serve as a basis for the actual demonstration activities of the project. (T6.1)
OPENTUNITY flexibility market (v2) (si apre in una nuova finestra)This deliverable will show how the flexibility markets in the different demo countries will function according to NODES platform and its connection with local actors (DSOs and flexibility providers). (T4.5)
Plan for Dissemination, Communication and Exploitation of Results (si apre in una nuova finestra)Detail the strategy and concrete actions for the dissemination, communication and exploitation of the project results to audiences that may use those results. (T8.1, T8.2, T8.3, T8.4)
OPENTUNITY asset and planning developments (v1) (si apre in una nuova finestra)This deliverable will include all the developments made to ensure a proper long-term management of the operations of DSOs and TSOs and the different assets under their control. (T5.4, T5.5)
Project Management Plan (v2) (si apre in una nuova finestra)It includes all project management procedures and templates, a detailed technical, implementation plan, the risk assessment and ethics monitoring frameworks. (T1.1, T1.2, T1.3)
Open architecture report (si apre in una nuova finestra)The purpose of this deliverable is twofold: first define the BE-SGAM framework to enable blockchain-based solutions to be efficiently modeled using SGAM and second to actually use BE-SGAM for modeling the use cases defined under T2.1 with a focus to define an open, secure, and flexible architecture for the OPENTUNITY project. (T2.4)
Technical foundations (si apre in una nuova finestra)This deliverable will report the work performed in order to set the technical basis of the projects and will reflect the needed output for software development and Pilot integration in WP3, WP4, WP5 and WP6. (T2.1, T2.5)
Optimal selection of available flexibility (v2) (si apre in una nuova finestra)This deliverable shows the optimization algorithms that the project will provide to aggregators in order to select the most suitable flexibility sources under its portfolio of clients. (T4.4)
Standardization landscape and socioeconomic context (si apre in una nuova finestra)This deliverable will report the preliminary analysis on standards and socioeconomic context of the project. (T2.2, T2.3)
OPENTUNITY flexibility market (v1) (si apre in una nuova finestra)This deliverable will show how the flexibility markets in the different demo countries will function according to NODES platform and its connection with local actors (DSOs and flexibility providers). (T4.5)
Enhanced, user-friendly EMS for residential/building flexibility discovery and delivery (v2) (si apre in una nuova finestra)This deliverable will report the functionalities that the project will deliver for HEMS and BEMS (T4.1, T4.2, T4.3)
OPENTUNITY Grid integration methodology (si apre in una nuova finestra)This deliverable will provide the guidelines to be followed in order to utilize the methodology developed within Task 5.1. (T5.1)
Dissemination and Communication activities Report (v1) (si apre in una nuova finestra)A report will be generated after each of the planned workshops, dissemination and communication activities containing the minutes, report, photo or video overview of the meeting, presentation used, participants list or number of people present, and feedback from- if appropriate-: the stakeholder group, people present. This content will be included in this deliverable which will be updated on Month 30 and Month 48. (T8.1, T8.2 and T8.3)
OPENTUNITY power flow developments (v2) (si apre in una nuova finestra)This deliverable will include all the developments made by the project addressed to the management of the power flows of the grids. (T5.2, T5.3)
It will include the initial DMP along the FAIR principles and the corresponding roles of partners and resources to be utilized. It is provided as a separate deliverable due to the strong data-relevant nature of the project. Updates of the DMP will be provided as part of the Periodic Management Reports. (T1.2, T1.3)
Pubblicazioni
Autori:
Sapountzakis, Haris; Andresakis, Kyriakos; Xygkis, Themistoklis; Dimeas, Aris; Korres, Georgios; Hatziargyriou, Nikos; National Technical University of Athens
Pubblicato in:
2025
DOI:
10.5281/ZENODO.14608822
È in corso la ricerca di dati su OpenAIRE...
Si è verificato un errore durante la ricerca dei dati su OpenAIRE
Nessun risultato disponibile