Risultati dei progetti
CORDIS fornisce collegamenti ai risultati finali pubblici e alle pubblicazioni dei progetti ORIZZONTE.
I link ai risultati e alle pubblicazioni dei progetti del 7° PQ, così come i link ad alcuni tipi di risultati specifici come dataset e software, sono recuperati dinamicamente da .OpenAIRE .
Risultati finali
Description of the project management strategy and method related to T1.1 : this deliverable will include among other things: a Gantt chart and a Work Breakdown Structure (WBS); A schedule per task, responsible partner related subtasks, related deliverables, and dependencies on other tasks.
ETES and components requirements and KPIs for each use case (si apre in una nuova finestra)The aim of the deliverable is to provide a comprehensive and documented set of specifications that outline the specific requirements for the ETES system and its components for each use cases and this will provide inputs and the complete vision required for ETES development(WP3), modeling, and Digital Twin (WP5). This deliverable will also include KPIs identified, under task 2.3, to evaluate the functionalities of the ETES system
ETES design for each use case (si apre in una nuova finestra)Description of the general design of the ETES. The related components for each use case of the project will be specified and described.
LCA modelling of the ETES (si apre in una nuova finestra)The deliverable report will contain detail LCA models of HP, TES and ORC components based on ISO LCA standards which will include goal and scope, inventory, and impact assessment methodology.
Project management handbook with tempales & guide (first update) (si apre in una nuova finestra)This deliverable updates, according to the project evolutions: the Gantt chart and Work Breakdown Structure (WBS); A schedule per task, responsible partner related subtasks, related deliverables, and dependencies on other tasks.
Definition and validation of a TES SoC for ETES (si apre in una nuova finestra)Experimental validation of the TES State of Charge measurment at lab scale. After the presentation of the SoC selected, specific tests will be lead at CEA to check the ability to predict the amount of thermal energy available in the TES.
Project management handbook with tempales & guide (final update) (si apre in una nuova finestra)According to the project's latest evolutions, this deliverable updates: the Gantt chart and Work Breakdown Structure (WBS); A schedule per task, responsible partner related subtasks, related deliverables, and dependencies on other tasks.
PCM selection for ETES (si apre in una nuova finestra)Review of existing PCM available and suitable for SEHRENE applications. The different familys of PCM will be described and main criterias for selection defined and calculated.
State of the art of TES SoC measurement (si apre in una nuova finestra)Review of TES SoC principles in the state of the art (related to T4.3). This will rely on scientific articles and existing patents describing TES SoC solutions.
Dissemination and Communication Plans (si apre in una nuova finestra)Dissemination and Communication Plan (DCP) - The DCP intends to serve as an operational handbook, guiding the D&C activities within SEHRENE. The objective is to establish a plan that maximizes the overall project visibility and outreach including setting up dissemination and communication methods. The strategy includes information on the objectives, relevant target stakeholder groups and audiences, messages that will be communicated to these groups, the channels and interactive tools to be used, and a timeline of implementation. In addition, a monitoring methodology and framework will also be established to measure the impacts created by the results.
Review of corrosion and ageing issues of materials (SoA) and critical paramters defined (si apre in una nuova finestra)State of the art on main issues on PCM regarding corrosion with Al surfaces (related to T4.2)
Description of operational management related to T1.2. Details on IP management, organization and follow-up related to consortium management
Pubblicazioni
Autori:
Alfani, Dario; bombarda, paola; D'Incalci, Matteo; GHANATOS, Elie; Halaçoğlu, Ural; HAZAR, TUĞRUL; Eren, Feride İrem; Chaudoir, Basile; Janod, Titouan; Lemort, Vincent; Merbecks, Tristan Leonard; Piazza, Mattia
Pubblicato in:
European Geothermal Congress 2025, 2025
Editore:
European Geothermal Energy Council (EGEC)
DOI:
10.5281/ZENODO.17832849
Autori:
Shiladitya Paul, Deepak Sharma, Manish Dinker
Pubblicato in:
CONFERENCE 2026, 2026
Editore:
Association for Materials Protection and Performance (AMPP)
DOI:
10.5006/C2026-00055
Autori:
Matteo Carlo d’Incalci, Dario Alfani, Paola Bombarda
Pubblicato in:
International Seminar on ORC Power Systems conference series 2025, 2026
Editore:
Lappeenranta-Lahti University of Technology (LUT University)
DOI:
10.5281/ZENODO.21036285
Autori:
Paul, Shiladitya; Sharma, Deepak; GHANATOS, Elie
Pubblicato in:
AMPP Annual Conference + Expo 2025, 2025
Editore:
Association for Materials Protection and Performance (AMPP)
DOI:
10.25392/LEICESTER.DATA.30052792
Autori:
Deepak Sharma, Adamantini Loukodimou, Bénédicte Champel, Shiladitya Paul
Pubblicato in:
Journal of Energy Storage, Numero 166, 2026, ISSN 2352-152X
Editore:
Elsevier BV
DOI:
10.1016/J.EST.2026.122473
È in corso la ricerca di dati su OpenAIRE...
Si è verificato un errore durante la ricerca dei dati su OpenAIRE
Nessun risultato disponibile