CORDIS bietet Links zu öffentlichen Ergebnissen und Veröffentlichungen von HORIZONT-Projekten.
Links zu Ergebnissen und Veröffentlichungen von RP7-Projekten sowie Links zu einigen Typen spezifischer Ergebnisse wie Datensätzen und Software werden dynamisch von OpenAIRE abgerufen.
Leistungen
Supporting agreements to enable Task 61
Societal and legal effects of transport decision: Stakeholder analysis. (öffnet in neuem Fenster)Report on the output of Task 5.1
Development of technology for track and ride quality monitoring (öffnet in neuem Fenster)Report on progress in Task 42
Cost/benefit data and application methodology for lean in railway S&C (öffnet in neuem Fenster)Reporting output of Task 231
Lubrication systems and data available, with estimates of costs and benefits (öffnet in neuem Fenster)Reporting output of Task 251
Preliminary transition zone model and detailed modelling plan (öffnet in neuem Fenster)Reporting output of Task 261
Final business case synthesis final report (öffnet in neuem Fenster)Reporting output of Task 1.6
Low cost track based monitoring modules for plain line and S&C. (öffnet in neuem Fenster)Report on the output of Task 41
Incentives final report (öffnet in neuem Fenster)Reporting output of Task 15
Database of economic data on case study lines, with accompanying meta-data description to document structure (öffnet in neuem Fenster)Achievement, problems, mitigation action, and any deviations in creation of the database of economic data. Sample data to be appended.
Model to support increasing the resilience of power supply infrastructure to changing climate. (öffnet in neuem Fenster)Report on the output of Task 3.2
Interface definition for input of GNSS (or ground-based train odometry) location data to monitoring technology. (öffnet in neuem Fenster)Report on output of Task 44
Development status of smartphone technology for track and ride quality monitoring. (öffnet in neuem Fenster)Report on progress in Task 4.3
Status report on current design & maintenance criteria relative to needs, static illustration for case study lines (öffnet in neuem Fenster)Report on the output of Task 65
Harmonised interface to transmit on-board monitoring data to the traffic control centre. (öffnet in neuem Fenster)Report on output of Task 44
Corrugation reduction strategies for NeTIRail-INFRA track types, with estimates of costs and benefits (öffnet in neuem Fenster)Reporting output of Task 2.4.1
Practices and track technology tailored to particular lines. (öffnet in neuem Fenster)Reporting the output of Task 22
Overview of technical developments and innovation with direct or possible future expected impact on existing guidelines. (öffnet in neuem Fenster)Reporting output of Task 75
Low cost smartphone based track and ride quality monitoring technology. (öffnet in neuem Fenster)Report on output of Task 43
Project Management Plan. (öffnet in neuem Fenster)Generated in work package 8
Project Website (public and private) (öffnet in neuem Fenster)Achievement, problems, mitigation action, and any deviations in creation of the project website. Sample of website to be appended.
Report on selection of case studies (öffnet in neuem Fenster)Report on selection of case studies generated by T11
Tailoring lubrication to duty and climate: Safe, effective and eco-friendly avoidance of track wear and damage (öffnet in neuem Fenster)Reporting output of Task 252
Decision support tools for implementation of technologies (öffnet in neuem Fenster)Achievement, problems, mitigation action, and any deviations in creation of the decision support tools in Task 6.3. Sample of tool to be appended.
Cost and User benefit report (öffnet in neuem Fenster)Reporting output of Task 13
Data report on network-related technical and operational data (öffnet in neuem Fenster)Report on the output of Task 61
Tailoring track to avoid corrugations: Traffic dependant selection of rail cross-section, clips and pads to avoid or delay corrugation (öffnet in neuem Fenster)Reporting output of Task 2.4.2
Modular packages of component grades and design specifications for new installations of power infrastructure tailored to traffic and operational needs. (öffnet in neuem Fenster)Report on the output of Task 33
Cost effective transition zone design tailored to line type and traffic (öffnet in neuem Fenster)Report on output of Task 2.6.2
Wider economic benefits intermediate report (öffnet in neuem Fenster)Reporting output of Task 14
Cost-benefit and societal analysis report illustrated by case study line data (öffnet in neuem Fenster)Report on the output of Task 6.4
Tailored decision support for track and vehicle maintenance through conversion of data to information. (öffnet in neuem Fenster)Report on output of Task 4.5
Project Quality Plan (öffnet in neuem Fenster)Generated in work package 8
Cost model development report (öffnet in neuem Fenster)Reporting output of Task 13
Data on system damage for different combinations of wire tension, pantograph collector strip material and upload force. (öffnet in neuem Fenster)Report on the output of Task 3.5
Validated monitoring equipment produced by testing of instrumentation in the real environment. (öffnet in neuem Fenster)Report on output of Task 46
Data collection equipment in the laboratory environment, and plan for field trials (öffnet in neuem Fenster)Report on the output of Task 41
Overview of project related recommended future development needs. (öffnet in neuem Fenster)Reporting output of Task 76
Tailored combinations of wire tension, pantograph collector strip material and upload force for optimum performance. (öffnet in neuem Fenster)Report on the output of Task 34
Wider economic benefits final report. (öffnet in neuem Fenster)Reporting output of Task 1.4
Balancing societal effects and cost-benefit of different infrastructure decisions. (öffnet in neuem Fenster)Report on the output of Task 5.3
Track and ride quality monitoring technology based on train-borne measurements in standard vehicles. (öffnet in neuem Fenster)Report on output of Task 42
Analysis of “big data”: geospatial analysis of costs, drivers of failure and life of track infrastructure. (öffnet in neuem Fenster)Reporting output of Task 21
Analysis of “big data”: tailoring overhead line infrastructure specification and needs through geospatial analysis of duty and life of equipment. (öffnet in neuem Fenster)Report on the output of Task 32
Power supply technologies and practices of low and high-density railways, identifying learning points and future opportunities. (öffnet in neuem Fenster)Report on output of Task 31
Perception of different service options: User study and data analysis (öffnet in neuem Fenster)Report on the output of Task 52
Case study line data scenarios playable in the web application (öffnet in neuem Fenster)Report on output of Task 64
GIS-based web application (öffnet in neuem Fenster)Achievement, problems, mitigation action, and any deviations in creation of the GIS-based web application in Task 6.2. Sample of application to be appended.
Application of lean and automotive industry techniques to produce a step change in railway S&C life and costs (öffnet in neuem Fenster)Reporting output of Task 2.3.2
Functional, operational and technical specification for simplified interlocking of user autonomous switches in low density lines. (öffnet in neuem Fenster)Report on achievement problems mitigation action and any deviations from expectations in demonstration of equipment designed in Task 44
Project communications and publicity. Three issues: Month 12, 24, 36.
Project Flyer (öffnet in neuem Fenster)Project communications and publicity
NeTIRail-INFRA Final brochure (öffnet in neuem Fenster)Project communications and publicity
Veröffentlichungen
Autoren:
Ali Jamshidi, Alfredo Núñez, Rolf Dollevoet, Zili Li
Veröffentlicht in:
Journal of Infrastructure Systems, Ausgabe 23/3, 2017, Seite(n) 04017006, ISSN 1076-0342
Herausgeber:
American Society of Civil Engineers
DOI:
10.1061/(ASCE)IS.1943-555X.0000357
Autoren:
Alfredo Nunez, Ali Jamshidi, Hongrui Wang
Veröffentlicht in:
IEEE Transactions on Industrial Informatics, 2018, Seite(n) 1-1, ISSN 1551-3203
Herausgeber:
Institute of Electrical and Electronics Engineers
DOI:
10.1109/TII.2018.2847736
Autoren:
Shaoguang Li, Zili Li, Alfredo Núñez, Rolf Dollevoet
Veröffentlicht in:
Applied Sciences, Ausgabe 7/8, 2017, Seite(n) 807, ISSN 2076-3417
Herausgeber:
Applied Sciences
DOI:
10.3390/app7080807
Autoren:
Maider Oregui, Alfredo Núñez, Rolf Dollevoet, Zili Li
Veröffentlicht in:
Journal of Engineering Mechanics, Ausgabe 143/5, 2017, Seite(n) 04017011, ISSN 0733-9399
Herausgeber:
American Society of Civil Engineers
DOI:
10.1061/(ASCE)EM.1943-7889.0001207
Autoren:
A. Nunez, TU Delft
Veröffentlicht in:
IEEE WCCI 2018, Rio de Janeiro, Brazil, 2018
Herausgeber:
IEEE World Congress on Computational Intelligence
Autoren:
Prof. Andrew Smith, University of Leeds
Prof. Chris Nash, CERRE & University of Leed
Veröffentlicht in:
http://www.cerre.eu, 2018
Herausgeber:
Centre on Regulation in Europe (CERRE) a.s.b.l.
Autoren:
A. Nunez, TU Delft
Veröffentlicht in:
World Transport Convention 2018, 2018
Herausgeber:
World Transport Convention 2018
Autoren:
Andrew Smith, University of Leeds
Veröffentlicht in:
ResearchGate, 2018
Herausgeber:
ResearchGate
Autoren:
Jamshidi, A.; Hajizadeh, S.; Naeimi, M.; Nunez Vicencio, Alfredo; Li, Z.
Veröffentlicht in:
1st International Conference on Rail Transportation: ICRT2017, Ausgabe 1, 2017
Herausgeber:
First International Conference on Rail Transportation
Autoren:
LIU, Baisi; GHAZEL, Mohamed
Veröffentlicht in:
Railway Engineering-2017, Edinburgh, Ausgabe 1, 2017
Herausgeber:
Railway Engineering-2017
Suche nach OpenAIRE-Daten ...
Bei der Suche nach OpenAIRE-Daten ist ein Fehler aufgetreten
Es liegen keine Ergebnisse vor