During the second period of the SatisFactory project, the SatisFactory Consortium has completed the circle of all necessary actions denoted in the project’s Description of Action (DoA –Annex I). The work in the second period of the project (M19-M36) focused on the fulfilment of user requirements analysis and use cases finalization, as well as on the overall SatisFactory system implementation and evaluation. In parallel, the development efforts have been finalised in all domains of the SatisFactory project, e.g. social collaboration platform, gamification framework, HR re-adaptation toolkit, context-aware manager, decision support engine, IoT infrastructure, AR glasses, AR toolkit and “on-the-job” education toolkit, along with the technical developments of the SatisFactory hardware infrastructure. Moreover, project efforts proceeded in focusing also on several horizontal activities regarding diffusing project objectives, concepts and achievements in key stakeholders as well as to the general public.
The developments for the reporting period can be summarized, but not limited to the following points:
1. Definition of end-user, shop-floor and system requirements and specifications. Finally 89 requirements have been defined from the 3 pilot shop-floors.
2. Actors and procedures interconnection modelling. There were defined 3-6 actors groups, depending on the shop-floor, which can be divided at 11 subcategories.
3. Definition of the SatisFactory Use-Cases and Application Scenarios. Eleven (11) business scenarios and twenty three (23) cases (UCs) were defined.
4. Implementation of the Common Information Data Exchange Model (CIDEM) and its APIs for the storing information of the shop-floors.
5. Development of the Plant Data Exchange Component (PDEC), in order to connect existing shop-floor infrastructure with the SatisFactory or other frameworks.
6. Definition of the SatisFactory architecture.
7. Development of novel tools for increasing attractiveness of the workplaces:
o Social Collaboration platform;
o Gamification platform;
o Suggestions for improvements platform;
o Digital Andon;
8. Implementation of a human resources optimization and re-adaptation toolkit;
9. Development of context-aware components to enable Knowledge Share and support Decision Making process:
o Localization manager (LM);
o Multiple-media manager;
o Gesture and content recognition manager;
o Incident detection algorithms;
10. Development of the SatisFactory decision support system (DSS):
o Core DSS engine;
o Incident detection – Malfunction diagnosis application;
11. Design and development of IoT infrastructure:
o UWB localization infrastructure;
o Single & multi-radio nodes for collecting data from shop-floor sensors;
o Comfort-related IoT devices;
12. Design and creation of Augmented Reality Glasses to improve attractiveness & knowledge share on the move;
13. Design and development of a AR “On-The-Job” education toolkit:
o Creation toolkit;
o Presentation tool;
o Image processing algorithms supporting AR operation;
14. Development of an intelligent notification and control middleware;
15. Definition of the project’s Data Management Plan;
Furthermore, the installation and testing at the pre-pilot shop-floor (CERTH/CPERI) has been finalized, while the SatisFactory framework has been successfully deployed in the industrial pilot shop-floors (COMAU and SUNLIGHT). The system has been evaluated, while the evaluation results and the lessons learned has been documented.
Regarding the horizontal activities of the project, the consortium established and effectively maintained a bulk of facilities for the dissemination of the project concept, objectives and results. Some indicative are the official SatisFactory web site (
http://www.satisfactory-project.eu/(öffnet in neuem Fenster)) popular social media, publications in scientific conferences and journals, a video, brochures, press-releases, etc.