European Commission logo
italiano italiano
CORDIS - Risultati della ricerca dell’UE
CORDIS

Grid Integrated Multi Megawatt High Pressure Alkaline Electrolysers for Energy Applications

Risultati finali

Final report on dissemination activities and materials

Document summarising the activities on dissemination and awareness carried out during ELYntegration project and their impact.

Update 2 of dissemination and awareness plan

A detailed dissemination, communication and awareness plan will be developed at the beginning of the project, being periodically updated and deployed along the project life cycle. The different versions will include the activities actually developed in the project according to the previous plan version as well as the foreseen ones for the next period

Dissemination and awareness plan

A detailed dissemination, communication and awareness plan will be developed at the beginning of the project. The dissemination and awareness plan will describe the dissemination goals, target groups, dissemination channels and individual approaches for particular partners providing a regular flow of information

Assessment on market potential

The market study will focus on the national policies towards renewable energy and energy storage, availability and price of electricity, business climate, the presence of target sectors (e.g. manufacturers) and users, and possible other drivers that could assist in the wider implementation (such as EU structural funds).

Final project report

Final report summarising ELYntegration activities, tasks and main results.

First strategy plan for commercial exploitation of the results

Each partner will generate exploitable results and be responsible for the exploitation; however, the most important synergies can be achieved by a common and long term exploitation strategy aimed at wider implementation of the electrolyser components and systems developed. The first strategy plan will contain the detailed definition of the exploitable results

Final strategy plan for commercial exploitation of the results

Each partner will generate exploitable results and be responsible for the exploitation; however, the most important synergies can be achieved by a common and long term exploitation strategy aimed at wider implementation of the electrolyser components and systems developed. After the second exploitation meeting, D6.7 will include the development of the exploitation strategy and business plan.

Update 1 of dissemination and awareness plan

A detailed dissemination, communication and awareness plan will be developed at the beginning of the project, being periodically updated and deployed along the project life cycle. The different versions will include the activities actually developed in the project according to the previous plan version as well as the foreseen ones for the next period

Midterm project report

Progress report on technical and financial documentation updated for the midterm review

Quality Management Plan

The results of the project will be evaluated and validated to ensure the performance of the objectives and the quality of them. Moreover, during the testing period of the project, data will be collected and analyzed, in order to validate the results developed for the optimization of the system design, operation and control. Project Consortium is deeply committed on assuring high quality results. In order to achieve these high standards, a Quality Management Plan will be developed in task 1.6 (M6) in order to define role and responsibilities to ensure them

Final report on most attractive business models and value chain proposition

Business models for electrolyser operation will be developed, analysed and evaluated, possible industry sectors as well as mobility and public transportation will be determined and the economic impact of arbitrage trade analysed.

Specific national business cases

To help exploiting the project results in Europe, several business cases (case studies) will be developed to support the further implementation of electrolysers integrated in grids with renewable generation. Models and strategies will be developed to solve possible bottlenecks, for example relating to capital, permitting, etc

Demonstration a maximum 4 stacks 250 HP AWE

Assembly, commissioning and test of the performance of the real scale stacks together with the developed C&CS.

ELYntegration website

Development of the website for the project as the main communication tool for dissemination materials and public information

Pubblicazioni

A Powder Metallurgy Route to Produce Raney-Nickel Electrodes for Alkaline Water Electrolysis

Autori: Christian Immanuel Bernäcker, Thomas Rauscher, Tilo Büttner, Bernd Kieback, Lars Röntzsch
Pubblicato in: Journal of The Electrochemical Society, Numero 166/6, 2019, Pagina/e F357-F363, ISSN 0013-4651
Editore: Electrochemical Society, Inc.
DOI: 10.1149/2.0851904jes

Potential of new business models for grid integrated water electrolysis

Autori: Patrick Larscheid, Lara Lück, Albert Moser
Pubblicato in: Renewable Energy, Numero 125, 2018, Pagina/e 599-608, ISSN 0960-1481
Editore: Pergamon Press Ltd.
DOI: 10.1016/j.renene.2018.02.074

Techno-economic modelling of water electrolysers in the range of several MW to provide grid services while generating hydrogen for different applications: a case study in Spain applied to mobility with FCEVs

Autori: Guillermo Matute, José María Yusta, Luis Carlos Correas
Pubblicato in: International Journal of Hydrogen Energy, 2019, ISSN 0360-3199
Editore: Pergamon Press Ltd.

È in corso la ricerca di dati su OpenAIRE...

Si è verificato un errore durante la ricerca dei dati su OpenAIRE

Nessun risultato disponibile