Skip to main content
European Commission logo print header
Zawartość zarchiwizowana w dniu 2022-11-21

Optimisation and control of galvannealing

Cel

The first phase of the project is intended to test principles for modifying a galvannealing line, on a pilot line and through measurements made on an industrial line, with a view to optimising and controlling the coating composition. This modification will be achieved mainly by increasing soaking time at a lower temperature and should also provide improvements in coating thickness control.

Zaproszenie do składania wniosków

Data not available

System finansowania

CSC - Cost-sharing contracts

Koordynator

CENTRE DE RECHERCHES METALLURGIQUES
Wkład UE
Brak danych
Adres
Rue Ernest Solvay, 11
4000 LIEGE
Belgia

Zobacz na mapie

Koszt całkowity
Brak danych

Uczestnicy (4)