CORDIS proporciona enlaces a los documentos públicos y las publicaciones de los proyectos de los programas marco HORIZONTE.
Los enlaces a los documentos y las publicaciones de los proyectos del Séptimo Programa Marco, así como los enlaces a algunos tipos de resultados específicos, como conjuntos de datos y «software», se obtienen dinámicamente de OpenAIRE .
Resultado final
A non-technical guideline will be produced to describe the DST integration procedures developed in the SAFE-10-T project. This will be published on the website and advertised in the newsletter.
Report on Machine learning algorithms (se abrirá en una nueva ventana)A report describing the machine learning algorithm developed to improve risk assessment at object and network levels will be delivered. At the object level this will detail how to incorporate SHM and climate/traffic info, at the network level forecasts of demand will be addressed. It will be published on the SAFE-10-T website. The deliverable is linked to task 3.3.
Report on Network Model (se abrirá en una nueva ventana)The report will describe the macroscopic network traffic model developed within SAFE-10-T. With a focus on nodes and interchanges, the model will identify gaps between demand and current capacity. It will be used to perform stress tests to assess the systems resilience to climate hazards. The deliverable is linked to task 2.2.
Guideline document on resilience assessment (se abrirá en una nueva ventana)A non-technical guideline will be produced to describe the SAFE-10-T approach to resilience assessment. This will be published on the website and advertised in the newsletter.
Report on Advanced Safety Model for Tunnels (se abrirá en una nueva ventana)This report will describe a probabilistic based displacement model for the Heinenoord tunnel and will include measured displacement data. The deliverable is linked to task 1.3.
Report on the results of Case Study 3 – UK (se abrirá en una nueva ventana)The application of the complete safety framework on a complex urban station will be described. It will be published on the SAFE-10-T website. The deliverable is linked to task 4.3.
Mid-term report on dissemination activities and update of the dissemination plan (se abrirá en una nueva ventana)Mid-term report on dissemination activities and update of the dissemination plan. Public deliverable.
Guideline document on integration of sensor monitoring systems (se abrirá en una nueva ventana)A non-technical guideline will be produced to describe the sensor monitoring systems deployed in the SAFE-10-T project. This will be published on the website and advertised in the newsletter.
Newsletter 3 (se abrirá en una nueva ventana)A non-technical newsletter will be produced describing the project objectives and including recent work. The newsletter will be updated every six months, sent in pdf form to an extensive mailing list and posted on the project website. The deliverable is linked to task 5.3.
Report on Advanced Safety Model for Bridges (se abrirá en una nueva ventana)The report will a present probabilistic basis for assessment of bridge structures for various travel modes. A number of novel techniques will be considered including; (i) System analysis, (ii) Load modelling, (iii) extreme value modelling and (iv)the effect of extreme weather events on bridges will be investigated in a manner which targets the likely future failures, considering well defined climate change models. The deliverable is linked to task 1.2.
Guideline document on traffic flow model (se abrirá en una nueva ventana)A non-technical guideline will be produced to describe the SAFE-10-T projects traffic modelling approach. This will be published on the website and advertised in the newsletter.
Report on DST validation (se abrirá en una nueva ventana)A workshop will be held to demonstrate and debug the DST. A range of end user from within and outside the project will be invited. The deliverable is linked to task 5.1.
Newsletter 1 (se abrirá en una nueva ventana)A non-technical newsletter will be produced describing the project objectives and including recent work. The newsletter will be updated every six months, sent in pdf form to an extensive mailing list and posted on the project website. It will be published on the SAFE-10-T website. The deliverable is linked to task 5.3.
Newsletter 6 (se abrirá en una nueva ventana)A non-technical newsletter will be produced describing the project objectives and including recent work. The newsletter will be updated every six months, sent in pdf form to an extensive mailing list and posted on the project website. The deliverable is linked to task 5.3.
Report on the results of Case Study 1 – Netherlands (se abrirá en una nueva ventana)A report describing the application of the network model to at the Port of Rotterdam will be delivered. It will be published on the SAFE-10-T website. The deliverable is linked to task 4.1.
Newsletter 4 (se abrirá en una nueva ventana)A non-technical newsletter will be produced describing the project objectives and including recent work. The newsletter will be updated every six months, sent in pdf form to an extensive mailing list and posted on the project website. The deliverable is linked to task 5.3.
Newsletter 2 (se abrirá en una nueva ventana)A non-technical newsletter will be produced describing the project objectives and including recent work. The newsletter will be updated every six months, sent in pdf form to an extensive mailing list and posted on the project website. The deliverable is linked to task 5.3.
Report on Embedded Monitoring Systems (se abrirá en una nueva ventana)This task will develop a series of methods for self-monitoring of critical infrastructure objects in order to optimise the structural safety models. the application include tunnels, earthworks and bridges. The deliverable is linked to task 1.5.
Report on Advanced Safety Model for Earthworks (se abrirá en una nueva ventana)This report will describe a probabilistic framework which will evaluate the stability of earth slopes (cuttings, embankments and dykes) considering environmental loading and variation due to climate change. The deliverable is linked to task 1.4.
Report on the results of Case Study 2 – Croatia (se abrirá en una nueva ventana)A report describing the application of the complete safety framework at the port of Rijeka will be delivered. It will be published on the SAFE-10-T website. The deliverable is linked to task 4.2.
Guideline document on integration of Safety Management procedures (se abrirá en una nueva ventana)A non-technical guideline will be produced to describe the Safety Management procedures developed in the SAFE-10-T project. This will be published on the website and advertised in the newsletter.
Final report on dissemination activities (se abrirá en una nueva ventana)Final report on dissemination activities. Public deliverable.
Report on integration of Big Data from and to open source (se abrirá en una nueva ventana)The core platform to collect, correlate, and make available data from multiple sources for the entire project and specifically for integration with the work undertaken in Task 3.3 (Machine Learning) and in Task 3.4 (the Decision Support Tool) is described. It will be published on the SAFE-10-T website. The deliverable is linked to task 3.2.
Report on User demand analysis (se abrirá en una nueva ventana)The report will describe the current and future demands of users of the EU road, rail and waterway networks. It will be published on the SAFE-10-T website. The deliverable is linked to task 2.1.
Guideline document for Integrated Safety Management System (se abrirá en una nueva ventana)A guideline will be developed to describe the economic and environmental analysis part of the SAFE-10-T global safety framework. It will be published on the SAFE-10-T website. The deliverable is linked to task 2.4.
Report on Decision Support Tool (se abrirá en una nueva ventana)The report will detail how the decision support tool operates. The purpose of the tool is to allow IM's to make robust, cost-effective decisions that maintain safety and maximise network capacity. It will be published on the SAFE-10-T website. The deliverable is linked to task 3.4.
Newsletter 5 (se abrirá en una nueva ventana)A non-technical newsletter will be produced describing the project objectives and including recent work. The newsletter will be updated every six months, sent in pdf form to an extensive mailing list and posted on the project website. The deliverable is linked to task 5.3.
Report on Whole Life Cycle Model (se abrirá en una nueva ventana)The SAFE-10-T LCA model be developed with the aim of integrating owners, users and societal costs related to transport infrastructure.
Guideline document on global safety indicators (se abrirá en una nueva ventana)A non-technical guideline will be produced to describe the SAFE-10-T projects global safety indicators. This will be published on the website and advertised in the newsletter.
Report on Probabilistic Consideration of Resilience (se abrirá en una nueva ventana)A guidelines will be presented detailing how the information from embedded monitoring systems can be used to optimise resilience assessment of infrastructure elements. The deliverable is linked to Task 1.1.
Report on Global Safety Framework (se abrirá en una nueva ventana)A summary report on the global safety framework will be prepared. It will be published on the SAFE-10-T website. The deliverable is linked to task 3.1.
A project specific website will be developed. The site will contain a public section with a project description, public deliverables etc. and a private area where participants can upload information.
Publicaciones
Autores:
FEHRL & GDG
Publicado en:
FEHRL Infrastructure Research Magazine, Edición Edición 10, August 2017, 2017, Página(s) 12, ISSN 2294-8295
Editor:
FEHRL
Autores:
Bacic, M., Gavin, K., Stipanović, I., Kovačević, M.S.
Publicado en:
Engineering Power: Bulletin of the Croatian Academy of Engineering, Edición 13(3), 2018, Página(s) 10-18, ISSN 1331-7210
Editor:
Croatian Academy of Engineering
Autores:
FEHRL (supported by project partners)
Publicado en:
FEHRL Infrastructure Research Magazine, Edición 13, 2019, Página(s) 14-15, ISSN 2294-8295
Editor:
FEHRL
Autores:
FEHRL (supported by project partners)
Publicado en:
FEHRL Infrastructure Research Magazine, Edición 14, 2019, ISSN 2294-8295
Editor:
FEHRL
Autores:
Carey, C., Corbally, R., Connolly, L., O’Connor, A.
Publicado en:
Civil Engineering Research in Ireland 2018, Edición 2018 Proceedings, 2018, Página(s) 323-328, ISBN 978-0-9573957-3-2
Editor:
Civil Engineering Research Association of Ireland
Autores:
Donnelly, R., Connolly, L., O’Connor, A., Rocco, L.
Publicado en:
Civil Engineering Research in Ireland 2018, Edición 2018 Proceedings, 2018, Página(s) 67-72, ISBN 978-0-9573957-3-2
Editor:
Civil Engineering Research Association of Ireland
Autores:
De Paor, C., Connolly, L., Ðuranovic, M., O’Connor, A., Bowe, C.
Publicado en:
Civil Engineering Research in Ireland 2018, Edición 2018 Proceedings, 2018, Página(s) 613-617, ISBN 978-0-9573957-3-2
Editor:
Civil Engineering Research Association of Ireland
Autores:
ROD-IS
Publicado en:
1st SENSKIN workshop, 2017
Editor:
SENSKIN project
Autores:
Ðuranovic, M., Connolly, L., O’Connor, A, Bowe, C.
Publicado en:
Civil Engineering Research in Ireland 2018, Edición 2018 Proceedings, 2018, Página(s) 73-78, ISBN 978-0-9573957-3-2
Editor:
Civil Engineering Research Association of Ireland
Autores:
Clarke, J., van der Tuin, M., Connolly, L.
Publicado en:
13th Intelligence Transport Systems European Congress, Edición 13, 2019
Editor:
ERTICO – ITS Europe
Autores:
Kovačević, M.S., Stipanović, I., Gavin, K., Skarić, S., Libric, L.
Publicado en:
Workshop on Life Cycle Management 2019, Edición 2019 Proceedings, 2019
Editor:
InfraQuest / Rijkswaterstaat
Autores:
van der Tuin, M., Pel, A.J.
Publicado en:
Workshop on Life Cycle Management 2019, Edición 2019 Proceedings, 2019
Editor:
InfraQuest / Rijkswaterstaat
Autores:
Stipanović, I., Connolly, L., Skarić, S., Ðuranovic, M.
Publicado en:
Workshop on Life Cycle Management 2019, Edición 2019 Proceedings, 2019
Editor:
InfraQuest / Rijkswaterstaat
Autores:
Kovačević, M.S., Bacic, M., Vukomanovic, M., Ceric, A.
Publicado en:
14th International Conference Organisation, Technology and Management in Construction & 7th International Project Management Association Research Conference, Edición 2019 Proceedings, 2019, Página(s) 507-517, ISBN 978-953-7686-08-6
Editor:
Croatian Association for Construction Management
Autores:
Tanasic, N., Clarke, J., Connolly, L., van der Tuin, M., Wells, S., Rocco, L., Hajdin, R.
Publicado en:
Transport Research Arena 2020 (cancelled due to spread of COVID-19 but book of abstracts available online), Edición 2020 Proceedings, 2020
Editor:
Finnish Ministry of Transport and Communications
Autores:
Skarić, S., Stipanović, I., van der Tuin, M., Bakker, J., Bakx-Leenheer, M.
Publicado en:
Transport Research Arena 2020 (cancelled due to spread of COVID-19 but book of abstracts available online), Edición 2020 Proceedings, 2020
Editor:
Finnish Ministry of Transport and Communications
Autores:
Connolly, L.
Publicado en:
8th International Conference on Weigh-In-Motion, Edición 2019 Proceedings, 2019
Editor:
International Society for Weigh-In-Motion
Autores:
Donnelly, R., Connolly, L., O’Connor, A., O’Brien, E.J.
Publicado en:
8th International Conference on Weigh-in-Motion, Edición 2019 Proceedings, 2019
Editor:
International Society for Weigh-In-Motion
Autores:
Corbally, R., Connolly, L., O’Brien, E., O’Connor, A., Cahill, F.
Publicado en:
8th International Conference on Weigh-In-Motion, Edición 2019 Proceedings, 2019
Editor:
International Society for Weigh-In-Motion
Autores:
W.H. Wu, L.J. Prendergast, K. Gavin
Publicado en:
Journal of Sound and Vibration, Edición 431, 2018, Página(s) 1-19, ISSN 0022-460X
Editor:
Academic Press
DOI:
10.1016/j.jsv.2018.05.049
Autores:
L.J. Prendergast, C. Reale, K. Gavin
Publicado en:
Marine Structures, Edición 57, 2018, Página(s) 87-104, ISSN 0951-8339
Editor:
Elsevier BV
DOI:
10.1016/j.marstruc.2017.09.009
Autores:
Luke J. Prendergast, Maria P. Limongelli, Naida Ademovic, Andrej Anžlin, Kenneth Gavin, Mariano Zanini
Publicado en:
Structural Engineering International, Edición 28/3, 2018, Página(s) 296-307, ISSN 1016-8664
Editor:
International Association for Bridge and Structural Engineering
DOI:
10.1080/10168664.2018.1472534
Autores:
Marieke S. van der Tuin, Adam J. Pel
Publicado en:
European Transport Research Review, Edición 12/1, 2020, ISSN 1867-0717
Editor:
Springer Verlag
DOI:
10.1186/s12544-020-0398-9
Autores:
Meho Saša Kovačević, Mario Bačić, Kenneth Gavin
Publicado en:
Canadian Geotechnical Journal, 2020, ISSN 0008-3674
Editor:
NRC Research Press
DOI:
10.1139/cgj-2019-0693
Autores:
G. Chortis, A. Askarinejad, L.J. Prendergast, Q. Li, K. Gavin
Publicado en:
Ocean Engineering, Edición 197, 2020, Página(s) 106838, ISSN 0029-8018
Editor:
Pergamon Press Ltd.
DOI:
10.1016/j.oceaneng.2019.106838
Autores:
Stipanović, I., Connolly, L., Skarić, S., Ðuranovic, M., Donnelly, R., Bernardini, I., Bakker, J.
Publicado en:
Frontiers in Built Environment, section Bridge Engineering (accepted), 2020, ISSN 2297-3362
Editor:
Frontiers
DOI:
10.3389/fbuil.2020.00100
Autores:
K.G. Gavin, W. Broere, M.S. Kovačević, K. de Haas
Publicado en:
Tunnels and Underground Cities: Engineering and Innovation meet Archaeology, Architecture and Art, 2019, Página(s) 4831-4838, ISBN 9780-429424441
Editor:
CRC Press
DOI:
10.1201/9780429424441-512
Buscando datos de OpenAIRE...
Se ha producido un error en la búsqueda de datos de OpenAIRE
No hay resultados disponibles