CORDIS fournit des liens vers les livrables publics et les publications des projets HORIZON.
Les liens vers les livrables et les publications des projets du 7e PC, ainsi que les liens vers certains types de résultats spécifiques tels que les jeux de données et les logiciels, sont récupérés dynamiquement sur OpenAIRE .
Livrables
A non-technical guideline will be produced to describe the DST integration procedures developed in the SAFE-10-T project. This will be published on the website and advertised in the newsletter.
Report on Machine learning algorithms (s’ouvre dans une nouvelle fenêtre)A report describing the machine learning algorithm developed to improve risk assessment at object and network levels will be delivered. At the object level this will detail how to incorporate SHM and climate/traffic info, at the network level forecasts of demand will be addressed. It will be published on the SAFE-10-T website. The deliverable is linked to task 3.3.
Report on Network Model (s’ouvre dans une nouvelle fenêtre)The report will describe the macroscopic network traffic model developed within SAFE-10-T. With a focus on nodes and interchanges, the model will identify gaps between demand and current capacity. It will be used to perform stress tests to assess the systems resilience to climate hazards. The deliverable is linked to task 2.2.
Guideline document on resilience assessment (s’ouvre dans une nouvelle fenêtre)A non-technical guideline will be produced to describe the SAFE-10-T approach to resilience assessment. This will be published on the website and advertised in the newsletter.
Report on Advanced Safety Model for Tunnels (s’ouvre dans une nouvelle fenêtre)This report will describe a probabilistic based displacement model for the Heinenoord tunnel and will include measured displacement data. The deliverable is linked to task 1.3.
Report on the results of Case Study 3 – UK (s’ouvre dans une nouvelle fenêtre)The application of the complete safety framework on a complex urban station will be described. It will be published on the SAFE-10-T website. The deliverable is linked to task 4.3.
Mid-term report on dissemination activities and update of the dissemination plan (s’ouvre dans une nouvelle fenêtre)Mid-term report on dissemination activities and update of the dissemination plan. Public deliverable.
Guideline document on integration of sensor monitoring systems (s’ouvre dans une nouvelle fenêtre)A non-technical guideline will be produced to describe the sensor monitoring systems deployed in the SAFE-10-T project. This will be published on the website and advertised in the newsletter.
Newsletter 3 (s’ouvre dans une nouvelle fenêtre)A non-technical newsletter will be produced describing the project objectives and including recent work. The newsletter will be updated every six months, sent in pdf form to an extensive mailing list and posted on the project website. The deliverable is linked to task 5.3.
Report on Advanced Safety Model for Bridges (s’ouvre dans une nouvelle fenêtre)The report will a present probabilistic basis for assessment of bridge structures for various travel modes. A number of novel techniques will be considered including; (i) System analysis, (ii) Load modelling, (iii) extreme value modelling and (iv)the effect of extreme weather events on bridges will be investigated in a manner which targets the likely future failures, considering well defined climate change models. The deliverable is linked to task 1.2.
Guideline document on traffic flow model (s’ouvre dans une nouvelle fenêtre)A non-technical guideline will be produced to describe the SAFE-10-T projects traffic modelling approach. This will be published on the website and advertised in the newsletter.
Report on DST validation (s’ouvre dans une nouvelle fenêtre)A workshop will be held to demonstrate and debug the DST. A range of end user from within and outside the project will be invited. The deliverable is linked to task 5.1.
Newsletter 1 (s’ouvre dans une nouvelle fenêtre)A non-technical newsletter will be produced describing the project objectives and including recent work. The newsletter will be updated every six months, sent in pdf form to an extensive mailing list and posted on the project website. It will be published on the SAFE-10-T website. The deliverable is linked to task 5.3.
Newsletter 6 (s’ouvre dans une nouvelle fenêtre)A non-technical newsletter will be produced describing the project objectives and including recent work. The newsletter will be updated every six months, sent in pdf form to an extensive mailing list and posted on the project website. The deliverable is linked to task 5.3.
Report on the results of Case Study 1 – Netherlands (s’ouvre dans une nouvelle fenêtre)A report describing the application of the network model to at the Port of Rotterdam will be delivered. It will be published on the SAFE-10-T website. The deliverable is linked to task 4.1.
Newsletter 4 (s’ouvre dans une nouvelle fenêtre)A non-technical newsletter will be produced describing the project objectives and including recent work. The newsletter will be updated every six months, sent in pdf form to an extensive mailing list and posted on the project website. The deliverable is linked to task 5.3.
Newsletter 2 (s’ouvre dans une nouvelle fenêtre)A non-technical newsletter will be produced describing the project objectives and including recent work. The newsletter will be updated every six months, sent in pdf form to an extensive mailing list and posted on the project website. The deliverable is linked to task 5.3.
Report on Embedded Monitoring Systems (s’ouvre dans une nouvelle fenêtre)This task will develop a series of methods for self-monitoring of critical infrastructure objects in order to optimise the structural safety models. the application include tunnels, earthworks and bridges. The deliverable is linked to task 1.5.
Report on Advanced Safety Model for Earthworks (s’ouvre dans une nouvelle fenêtre)This report will describe a probabilistic framework which will evaluate the stability of earth slopes (cuttings, embankments and dykes) considering environmental loading and variation due to climate change. The deliverable is linked to task 1.4.
Report on the results of Case Study 2 – Croatia (s’ouvre dans une nouvelle fenêtre)A report describing the application of the complete safety framework at the port of Rijeka will be delivered. It will be published on the SAFE-10-T website. The deliverable is linked to task 4.2.
Guideline document on integration of Safety Management procedures (s’ouvre dans une nouvelle fenêtre)A non-technical guideline will be produced to describe the Safety Management procedures developed in the SAFE-10-T project. This will be published on the website and advertised in the newsletter.
Final report on dissemination activities (s’ouvre dans une nouvelle fenêtre)Final report on dissemination activities. Public deliverable.
Report on integration of Big Data from and to open source (s’ouvre dans une nouvelle fenêtre)The core platform to collect, correlate, and make available data from multiple sources for the entire project and specifically for integration with the work undertaken in Task 3.3 (Machine Learning) and in Task 3.4 (the Decision Support Tool) is described. It will be published on the SAFE-10-T website. The deliverable is linked to task 3.2.
Report on User demand analysis (s’ouvre dans une nouvelle fenêtre)The report will describe the current and future demands of users of the EU road, rail and waterway networks. It will be published on the SAFE-10-T website. The deliverable is linked to task 2.1.
Guideline document for Integrated Safety Management System (s’ouvre dans une nouvelle fenêtre)A guideline will be developed to describe the economic and environmental analysis part of the SAFE-10-T global safety framework. It will be published on the SAFE-10-T website. The deliverable is linked to task 2.4.
Report on Decision Support Tool (s’ouvre dans une nouvelle fenêtre)The report will detail how the decision support tool operates. The purpose of the tool is to allow IM's to make robust, cost-effective decisions that maintain safety and maximise network capacity. It will be published on the SAFE-10-T website. The deliverable is linked to task 3.4.
Newsletter 5 (s’ouvre dans une nouvelle fenêtre)A non-technical newsletter will be produced describing the project objectives and including recent work. The newsletter will be updated every six months, sent in pdf form to an extensive mailing list and posted on the project website. The deliverable is linked to task 5.3.
Report on Whole Life Cycle Model (s’ouvre dans une nouvelle fenêtre)The SAFE-10-T LCA model be developed with the aim of integrating owners, users and societal costs related to transport infrastructure.
Guideline document on global safety indicators (s’ouvre dans une nouvelle fenêtre)A non-technical guideline will be produced to describe the SAFE-10-T projects global safety indicators. This will be published on the website and advertised in the newsletter.
Report on Probabilistic Consideration of Resilience (s’ouvre dans une nouvelle fenêtre)A guidelines will be presented detailing how the information from embedded monitoring systems can be used to optimise resilience assessment of infrastructure elements. The deliverable is linked to Task 1.1.
Report on Global Safety Framework (s’ouvre dans une nouvelle fenêtre)A summary report on the global safety framework will be prepared. It will be published on the SAFE-10-T website. The deliverable is linked to task 3.1.
A project specific website will be developed. The site will contain a public section with a project description, public deliverables etc. and a private area where participants can upload information.
Publications
Auteurs:
FEHRL & GDG
Publié dans:
FEHRL Infrastructure Research Magazine, Numéro Numéro 10, August 2017, 2017, Page(s) 12, ISSN 2294-8295
Éditeur:
FEHRL
Auteurs:
Bacic, M., Gavin, K., Stipanović, I., Kovačević, M.S.
Publié dans:
Engineering Power: Bulletin of the Croatian Academy of Engineering, Numéro 13(3), 2018, Page(s) 10-18, ISSN 1331-7210
Éditeur:
Croatian Academy of Engineering
Auteurs:
FEHRL (supported by project partners)
Publié dans:
FEHRL Infrastructure Research Magazine, Numéro 13, 2019, Page(s) 14-15, ISSN 2294-8295
Éditeur:
FEHRL
Auteurs:
FEHRL (supported by project partners)
Publié dans:
FEHRL Infrastructure Research Magazine, Numéro 14, 2019, ISSN 2294-8295
Éditeur:
FEHRL
Auteurs:
Carey, C., Corbally, R., Connolly, L., O’Connor, A.
Publié dans:
Civil Engineering Research in Ireland 2018, Numéro 2018 Proceedings, 2018, Page(s) 323-328, ISBN 978-0-9573957-3-2
Éditeur:
Civil Engineering Research Association of Ireland
Auteurs:
Donnelly, R., Connolly, L., O’Connor, A., Rocco, L.
Publié dans:
Civil Engineering Research in Ireland 2018, Numéro 2018 Proceedings, 2018, Page(s) 67-72, ISBN 978-0-9573957-3-2
Éditeur:
Civil Engineering Research Association of Ireland
Auteurs:
De Paor, C., Connolly, L., Ðuranovic, M., O’Connor, A., Bowe, C.
Publié dans:
Civil Engineering Research in Ireland 2018, Numéro 2018 Proceedings, 2018, Page(s) 613-617, ISBN 978-0-9573957-3-2
Éditeur:
Civil Engineering Research Association of Ireland
Auteurs:
ROD-IS
Publié dans:
1st SENSKIN workshop, 2017
Éditeur:
SENSKIN project
Auteurs:
Ðuranovic, M., Connolly, L., O’Connor, A, Bowe, C.
Publié dans:
Civil Engineering Research in Ireland 2018, Numéro 2018 Proceedings, 2018, Page(s) 73-78, ISBN 978-0-9573957-3-2
Éditeur:
Civil Engineering Research Association of Ireland
Auteurs:
Clarke, J., van der Tuin, M., Connolly, L.
Publié dans:
13th Intelligence Transport Systems European Congress, Numéro 13, 2019
Éditeur:
ERTICO – ITS Europe
Auteurs:
Kovačević, M.S., Stipanović, I., Gavin, K., Skarić, S., Libric, L.
Publié dans:
Workshop on Life Cycle Management 2019, Numéro 2019 Proceedings, 2019
Éditeur:
InfraQuest / Rijkswaterstaat
Auteurs:
van der Tuin, M., Pel, A.J.
Publié dans:
Workshop on Life Cycle Management 2019, Numéro 2019 Proceedings, 2019
Éditeur:
InfraQuest / Rijkswaterstaat
Auteurs:
Stipanović, I., Connolly, L., Skarić, S., Ðuranovic, M.
Publié dans:
Workshop on Life Cycle Management 2019, Numéro 2019 Proceedings, 2019
Éditeur:
InfraQuest / Rijkswaterstaat
Auteurs:
Kovačević, M.S., Bacic, M., Vukomanovic, M., Ceric, A.
Publié dans:
14th International Conference Organisation, Technology and Management in Construction & 7th International Project Management Association Research Conference, Numéro 2019 Proceedings, 2019, Page(s) 507-517, ISBN 978-953-7686-08-6
Éditeur:
Croatian Association for Construction Management
Auteurs:
Tanasic, N., Clarke, J., Connolly, L., van der Tuin, M., Wells, S., Rocco, L., Hajdin, R.
Publié dans:
Transport Research Arena 2020 (cancelled due to spread of COVID-19 but book of abstracts available online), Numéro 2020 Proceedings, 2020
Éditeur:
Finnish Ministry of Transport and Communications
Auteurs:
Skarić, S., Stipanović, I., van der Tuin, M., Bakker, J., Bakx-Leenheer, M.
Publié dans:
Transport Research Arena 2020 (cancelled due to spread of COVID-19 but book of abstracts available online), Numéro 2020 Proceedings, 2020
Éditeur:
Finnish Ministry of Transport and Communications
Auteurs:
Connolly, L.
Publié dans:
8th International Conference on Weigh-In-Motion, Numéro 2019 Proceedings, 2019
Éditeur:
International Society for Weigh-In-Motion
Auteurs:
Donnelly, R., Connolly, L., O’Connor, A., O’Brien, E.J.
Publié dans:
8th International Conference on Weigh-in-Motion, Numéro 2019 Proceedings, 2019
Éditeur:
International Society for Weigh-In-Motion
Auteurs:
Corbally, R., Connolly, L., O’Brien, E., O’Connor, A., Cahill, F.
Publié dans:
8th International Conference on Weigh-In-Motion, Numéro 2019 Proceedings, 2019
Éditeur:
International Society for Weigh-In-Motion
Auteurs:
W.H. Wu, L.J. Prendergast, K. Gavin
Publié dans:
Journal of Sound and Vibration, Numéro 431, 2018, Page(s) 1-19, ISSN 0022-460X
Éditeur:
Academic Press
DOI:
10.1016/j.jsv.2018.05.049
Auteurs:
L.J. Prendergast, C. Reale, K. Gavin
Publié dans:
Marine Structures, Numéro 57, 2018, Page(s) 87-104, ISSN 0951-8339
Éditeur:
Elsevier BV
DOI:
10.1016/j.marstruc.2017.09.009
Auteurs:
Luke J. Prendergast, Maria P. Limongelli, Naida Ademovic, Andrej Anžlin, Kenneth Gavin, Mariano Zanini
Publié dans:
Structural Engineering International, Numéro 28/3, 2018, Page(s) 296-307, ISSN 1016-8664
Éditeur:
International Association for Bridge and Structural Engineering
DOI:
10.1080/10168664.2018.1472534
Auteurs:
Marieke S. van der Tuin, Adam J. Pel
Publié dans:
European Transport Research Review, Numéro 12/1, 2020, ISSN 1867-0717
Éditeur:
Springer Verlag
DOI:
10.1186/s12544-020-0398-9
Auteurs:
Meho Saša Kovačević, Mario Bačić, Kenneth Gavin
Publié dans:
Canadian Geotechnical Journal, 2020, ISSN 0008-3674
Éditeur:
NRC Research Press
DOI:
10.1139/cgj-2019-0693
Auteurs:
G. Chortis, A. Askarinejad, L.J. Prendergast, Q. Li, K. Gavin
Publié dans:
Ocean Engineering, Numéro 197, 2020, Page(s) 106838, ISSN 0029-8018
Éditeur:
Pergamon Press Ltd.
DOI:
10.1016/j.oceaneng.2019.106838
Auteurs:
Stipanović, I., Connolly, L., Skarić, S., Ðuranovic, M., Donnelly, R., Bernardini, I., Bakker, J.
Publié dans:
Frontiers in Built Environment, section Bridge Engineering (accepted), 2020, ISSN 2297-3362
Éditeur:
Frontiers
DOI:
10.3389/fbuil.2020.00100
Auteurs:
K.G. Gavin, W. Broere, M.S. Kovačević, K. de Haas
Publié dans:
Tunnels and Underground Cities: Engineering and Innovation meet Archaeology, Architecture and Art, 2019, Page(s) 4831-4838, ISBN 9780-429424441
Éditeur:
CRC Press
DOI:
10.1201/9780429424441-512
Recherche de données OpenAIRE...
Une erreur s’est produite lors de la recherche de données OpenAIRE
Aucun résultat disponible