CORDIS bietet Links zu öffentlichen Ergebnissen und Veröffentlichungen von HORIZONT-Projekten.
Links zu Ergebnissen und Veröffentlichungen von RP7-Projekten sowie Links zu einigen Typen spezifischer Ergebnisse wie Datensätzen und Software werden dynamisch von OpenAIRE abgerufen.
Leistungen
A non-technical guideline will be produced to describe the DST integration procedures developed in the SAFE-10-T project. This will be published on the website and advertised in the newsletter.
Report on Machine learning algorithms (öffnet in neuem Fenster)A report describing the machine learning algorithm developed to improve risk assessment at object and network levels will be delivered. At the object level this will detail how to incorporate SHM and climate/traffic info, at the network level forecasts of demand will be addressed. It will be published on the SAFE-10-T website. The deliverable is linked to task 3.3.
Report on Network Model (öffnet in neuem Fenster)The report will describe the macroscopic network traffic model developed within SAFE-10-T. With a focus on nodes and interchanges, the model will identify gaps between demand and current capacity. It will be used to perform stress tests to assess the systems resilience to climate hazards. The deliverable is linked to task 2.2.
Guideline document on resilience assessment (öffnet in neuem Fenster)A non-technical guideline will be produced to describe the SAFE-10-T approach to resilience assessment. This will be published on the website and advertised in the newsletter.
Report on Advanced Safety Model for Tunnels (öffnet in neuem Fenster)This report will describe a probabilistic based displacement model for the Heinenoord tunnel and will include measured displacement data. The deliverable is linked to task 1.3.
Report on the results of Case Study 3 – UK (öffnet in neuem Fenster)The application of the complete safety framework on a complex urban station will be described. It will be published on the SAFE-10-T website. The deliverable is linked to task 4.3.
Mid-term report on dissemination activities and update of the dissemination plan (öffnet in neuem Fenster)Mid-term report on dissemination activities and update of the dissemination plan. Public deliverable.
Guideline document on integration of sensor monitoring systems (öffnet in neuem Fenster)A non-technical guideline will be produced to describe the sensor monitoring systems deployed in the SAFE-10-T project. This will be published on the website and advertised in the newsletter.
Newsletter 3 (öffnet in neuem Fenster)A non-technical newsletter will be produced describing the project objectives and including recent work. The newsletter will be updated every six months, sent in pdf form to an extensive mailing list and posted on the project website. The deliverable is linked to task 5.3.
Report on Advanced Safety Model for Bridges (öffnet in neuem Fenster)The report will a present probabilistic basis for assessment of bridge structures for various travel modes. A number of novel techniques will be considered including; (i) System analysis, (ii) Load modelling, (iii) extreme value modelling and (iv)the effect of extreme weather events on bridges will be investigated in a manner which targets the likely future failures, considering well defined climate change models. The deliverable is linked to task 1.2.
Guideline document on traffic flow model (öffnet in neuem Fenster)A non-technical guideline will be produced to describe the SAFE-10-T projects traffic modelling approach. This will be published on the website and advertised in the newsletter.
Report on DST validation (öffnet in neuem Fenster)A workshop will be held to demonstrate and debug the DST. A range of end user from within and outside the project will be invited. The deliverable is linked to task 5.1.
Newsletter 1 (öffnet in neuem Fenster)A non-technical newsletter will be produced describing the project objectives and including recent work. The newsletter will be updated every six months, sent in pdf form to an extensive mailing list and posted on the project website. It will be published on the SAFE-10-T website. The deliverable is linked to task 5.3.
Newsletter 6 (öffnet in neuem Fenster)A non-technical newsletter will be produced describing the project objectives and including recent work. The newsletter will be updated every six months, sent in pdf form to an extensive mailing list and posted on the project website. The deliverable is linked to task 5.3.
Report on the results of Case Study 1 – Netherlands (öffnet in neuem Fenster)A report describing the application of the network model to at the Port of Rotterdam will be delivered. It will be published on the SAFE-10-T website. The deliverable is linked to task 4.1.
Newsletter 4 (öffnet in neuem Fenster)A non-technical newsletter will be produced describing the project objectives and including recent work. The newsletter will be updated every six months, sent in pdf form to an extensive mailing list and posted on the project website. The deliverable is linked to task 5.3.
Newsletter 2 (öffnet in neuem Fenster)A non-technical newsletter will be produced describing the project objectives and including recent work. The newsletter will be updated every six months, sent in pdf form to an extensive mailing list and posted on the project website. The deliverable is linked to task 5.3.
Report on Embedded Monitoring Systems (öffnet in neuem Fenster)This task will develop a series of methods for self-monitoring of critical infrastructure objects in order to optimise the structural safety models. the application include tunnels, earthworks and bridges. The deliverable is linked to task 1.5.
Report on Advanced Safety Model for Earthworks (öffnet in neuem Fenster)This report will describe a probabilistic framework which will evaluate the stability of earth slopes (cuttings, embankments and dykes) considering environmental loading and variation due to climate change. The deliverable is linked to task 1.4.
Report on the results of Case Study 2 – Croatia (öffnet in neuem Fenster)A report describing the application of the complete safety framework at the port of Rijeka will be delivered. It will be published on the SAFE-10-T website. The deliverable is linked to task 4.2.
Guideline document on integration of Safety Management procedures (öffnet in neuem Fenster)A non-technical guideline will be produced to describe the Safety Management procedures developed in the SAFE-10-T project. This will be published on the website and advertised in the newsletter.
Final report on dissemination activities (öffnet in neuem Fenster)Final report on dissemination activities. Public deliverable.
Report on integration of Big Data from and to open source (öffnet in neuem Fenster)The core platform to collect, correlate, and make available data from multiple sources for the entire project and specifically for integration with the work undertaken in Task 3.3 (Machine Learning) and in Task 3.4 (the Decision Support Tool) is described. It will be published on the SAFE-10-T website. The deliverable is linked to task 3.2.
Report on User demand analysis (öffnet in neuem Fenster)The report will describe the current and future demands of users of the EU road, rail and waterway networks. It will be published on the SAFE-10-T website. The deliverable is linked to task 2.1.
Guideline document for Integrated Safety Management System (öffnet in neuem Fenster)A guideline will be developed to describe the economic and environmental analysis part of the SAFE-10-T global safety framework. It will be published on the SAFE-10-T website. The deliverable is linked to task 2.4.
Report on Decision Support Tool (öffnet in neuem Fenster)The report will detail how the decision support tool operates. The purpose of the tool is to allow IM's to make robust, cost-effective decisions that maintain safety and maximise network capacity. It will be published on the SAFE-10-T website. The deliverable is linked to task 3.4.
Newsletter 5 (öffnet in neuem Fenster)A non-technical newsletter will be produced describing the project objectives and including recent work. The newsletter will be updated every six months, sent in pdf form to an extensive mailing list and posted on the project website. The deliverable is linked to task 5.3.
Report on Whole Life Cycle Model (öffnet in neuem Fenster)The SAFE-10-T LCA model be developed with the aim of integrating owners, users and societal costs related to transport infrastructure.
Guideline document on global safety indicators (öffnet in neuem Fenster)A non-technical guideline will be produced to describe the SAFE-10-T projects global safety indicators. This will be published on the website and advertised in the newsletter.
Report on Probabilistic Consideration of Resilience (öffnet in neuem Fenster)A guidelines will be presented detailing how the information from embedded monitoring systems can be used to optimise resilience assessment of infrastructure elements. The deliverable is linked to Task 1.1.
Report on Global Safety Framework (öffnet in neuem Fenster)A summary report on the global safety framework will be prepared. It will be published on the SAFE-10-T website. The deliverable is linked to task 3.1.
A project specific website will be developed. The site will contain a public section with a project description, public deliverables etc. and a private area where participants can upload information.
Veröffentlichungen
Autoren:
FEHRL & GDG
Veröffentlicht in:
FEHRL Infrastructure Research Magazine, Ausgabe Ausgabe 10, August 2017, 2017, Seite(n) 12, ISSN 2294-8295
Herausgeber:
FEHRL
Autoren:
Bacic, M., Gavin, K., Stipanović, I., Kovačević, M.S.
Veröffentlicht in:
Engineering Power: Bulletin of the Croatian Academy of Engineering, Ausgabe 13(3), 2018, Seite(n) 10-18, ISSN 1331-7210
Herausgeber:
Croatian Academy of Engineering
Autoren:
FEHRL (supported by project partners)
Veröffentlicht in:
FEHRL Infrastructure Research Magazine, Ausgabe 13, 2019, Seite(n) 14-15, ISSN 2294-8295
Herausgeber:
FEHRL
Autoren:
FEHRL (supported by project partners)
Veröffentlicht in:
FEHRL Infrastructure Research Magazine, Ausgabe 14, 2019, ISSN 2294-8295
Herausgeber:
FEHRL
Autoren:
Carey, C., Corbally, R., Connolly, L., O’Connor, A.
Veröffentlicht in:
Civil Engineering Research in Ireland 2018, Ausgabe 2018 Proceedings, 2018, Seite(n) 323-328, ISBN 978-0-9573957-3-2
Herausgeber:
Civil Engineering Research Association of Ireland
Autoren:
Donnelly, R., Connolly, L., O’Connor, A., Rocco, L.
Veröffentlicht in:
Civil Engineering Research in Ireland 2018, Ausgabe 2018 Proceedings, 2018, Seite(n) 67-72, ISBN 978-0-9573957-3-2
Herausgeber:
Civil Engineering Research Association of Ireland
Autoren:
De Paor, C., Connolly, L., Ðuranovic, M., O’Connor, A., Bowe, C.
Veröffentlicht in:
Civil Engineering Research in Ireland 2018, Ausgabe 2018 Proceedings, 2018, Seite(n) 613-617, ISBN 978-0-9573957-3-2
Herausgeber:
Civil Engineering Research Association of Ireland
Autoren:
ROD-IS
Veröffentlicht in:
1st SENSKIN workshop, 2017
Herausgeber:
SENSKIN project
Autoren:
Ðuranovic, M., Connolly, L., O’Connor, A, Bowe, C.
Veröffentlicht in:
Civil Engineering Research in Ireland 2018, Ausgabe 2018 Proceedings, 2018, Seite(n) 73-78, ISBN 978-0-9573957-3-2
Herausgeber:
Civil Engineering Research Association of Ireland
Autoren:
Clarke, J., van der Tuin, M., Connolly, L.
Veröffentlicht in:
13th Intelligence Transport Systems European Congress, Ausgabe 13, 2019
Herausgeber:
ERTICO – ITS Europe
Autoren:
Kovačević, M.S., Stipanović, I., Gavin, K., Skarić, S., Libric, L.
Veröffentlicht in:
Workshop on Life Cycle Management 2019, Ausgabe 2019 Proceedings, 2019
Herausgeber:
InfraQuest / Rijkswaterstaat
Autoren:
van der Tuin, M., Pel, A.J.
Veröffentlicht in:
Workshop on Life Cycle Management 2019, Ausgabe 2019 Proceedings, 2019
Herausgeber:
InfraQuest / Rijkswaterstaat
Autoren:
Stipanović, I., Connolly, L., Skarić, S., Ðuranovic, M.
Veröffentlicht in:
Workshop on Life Cycle Management 2019, Ausgabe 2019 Proceedings, 2019
Herausgeber:
InfraQuest / Rijkswaterstaat
Autoren:
Kovačević, M.S., Bacic, M., Vukomanovic, M., Ceric, A.
Veröffentlicht in:
14th International Conference Organisation, Technology and Management in Construction & 7th International Project Management Association Research Conference, Ausgabe 2019 Proceedings, 2019, Seite(n) 507-517, ISBN 978-953-7686-08-6
Herausgeber:
Croatian Association for Construction Management
Autoren:
Tanasic, N., Clarke, J., Connolly, L., van der Tuin, M., Wells, S., Rocco, L., Hajdin, R.
Veröffentlicht in:
Transport Research Arena 2020 (cancelled due to spread of COVID-19 but book of abstracts available online), Ausgabe 2020 Proceedings, 2020
Herausgeber:
Finnish Ministry of Transport and Communications
Autoren:
Skarić, S., Stipanović, I., van der Tuin, M., Bakker, J., Bakx-Leenheer, M.
Veröffentlicht in:
Transport Research Arena 2020 (cancelled due to spread of COVID-19 but book of abstracts available online), Ausgabe 2020 Proceedings, 2020
Herausgeber:
Finnish Ministry of Transport and Communications
Autoren:
Connolly, L.
Veröffentlicht in:
8th International Conference on Weigh-In-Motion, Ausgabe 2019 Proceedings, 2019
Herausgeber:
International Society for Weigh-In-Motion
Autoren:
Donnelly, R., Connolly, L., O’Connor, A., O’Brien, E.J.
Veröffentlicht in:
8th International Conference on Weigh-in-Motion, Ausgabe 2019 Proceedings, 2019
Herausgeber:
International Society for Weigh-In-Motion
Autoren:
Corbally, R., Connolly, L., O’Brien, E., O’Connor, A., Cahill, F.
Veröffentlicht in:
8th International Conference on Weigh-In-Motion, Ausgabe 2019 Proceedings, 2019
Herausgeber:
International Society for Weigh-In-Motion
Autoren:
W.H. Wu, L.J. Prendergast, K. Gavin
Veröffentlicht in:
Journal of Sound and Vibration, Ausgabe 431, 2018, Seite(n) 1-19, ISSN 0022-460X
Herausgeber:
Academic Press
DOI:
10.1016/j.jsv.2018.05.049
Autoren:
L.J. Prendergast, C. Reale, K. Gavin
Veröffentlicht in:
Marine Structures, Ausgabe 57, 2018, Seite(n) 87-104, ISSN 0951-8339
Herausgeber:
Elsevier BV
DOI:
10.1016/j.marstruc.2017.09.009
Autoren:
Luke J. Prendergast, Maria P. Limongelli, Naida Ademovic, Andrej Anžlin, Kenneth Gavin, Mariano Zanini
Veröffentlicht in:
Structural Engineering International, Ausgabe 28/3, 2018, Seite(n) 296-307, ISSN 1016-8664
Herausgeber:
International Association for Bridge and Structural Engineering
DOI:
10.1080/10168664.2018.1472534
Autoren:
Marieke S. van der Tuin, Adam J. Pel
Veröffentlicht in:
European Transport Research Review, Ausgabe 12/1, 2020, ISSN 1867-0717
Herausgeber:
Springer Verlag
DOI:
10.1186/s12544-020-0398-9
Autoren:
Meho Saša Kovačević, Mario Bačić, Kenneth Gavin
Veröffentlicht in:
Canadian Geotechnical Journal, 2020, ISSN 0008-3674
Herausgeber:
NRC Research Press
DOI:
10.1139/cgj-2019-0693
Autoren:
G. Chortis, A. Askarinejad, L.J. Prendergast, Q. Li, K. Gavin
Veröffentlicht in:
Ocean Engineering, Ausgabe 197, 2020, Seite(n) 106838, ISSN 0029-8018
Herausgeber:
Pergamon Press Ltd.
DOI:
10.1016/j.oceaneng.2019.106838
Autoren:
Stipanović, I., Connolly, L., Skarić, S., Ðuranovic, M., Donnelly, R., Bernardini, I., Bakker, J.
Veröffentlicht in:
Frontiers in Built Environment, section Bridge Engineering (accepted), 2020, ISSN 2297-3362
Herausgeber:
Frontiers
DOI:
10.3389/fbuil.2020.00100
Autoren:
K.G. Gavin, W. Broere, M.S. Kovačević, K. de Haas
Veröffentlicht in:
Tunnels and Underground Cities: Engineering and Innovation meet Archaeology, Architecture and Art, 2019, Seite(n) 4831-4838, ISBN 9780-429424441
Herausgeber:
CRC Press
DOI:
10.1201/9780429424441-512
Suche nach OpenAIRE-Daten ...
Bei der Suche nach OpenAIRE-Daten ist ein Fehler aufgetreten
Es liegen keine Ergebnisse vor