CORDIS - Forschungsergebnisse der EU
CORDIS

Improvement of the plastic packaging waste chain from a circular economy approach

Leistungen

Review of the PlastiCircle Data Management Plan [ITENE, M30].

[D9.7] Review of the PlastiCircle Data Management Plan [ICLEI, M30]. -This deliverable is based on the results of all WPs Second version of the PlastiCircle Data Management Plan updated in accordance with the development in the project. -This deliverable is the basis for dissemination and communication activities

Definition of the PlastiCircle data management plan [ICLEI, M6].

[D9.2] Definition of the PlastiCircle data management plan [ICLEI, M6]. -This deliverable is based on the results of all WPs -It is a plan on how to manage the data generated within the project. Concretely it is a first version of the PlastiCircle Data Management Plan, including the link to PlastiCircle portal. -This deliverable is the basis for dissemination and communication activities

System design and preliminary specifications

System design and preliminary specifications [SAV; M6]: - This deliverable will include the results of T2.1. including the container design and architecture, list of materials and component and flow diagrams. -The information on this deliverable will be the basis for T2.2. to 2.7. and WP3.

Technical description of the sorter to be developed

[D4.2] Technical description of the sorter to be developed [PICVISA, M16]. -This deliverable is based on the results of T4.2. and T4.3. -It is a report describing the technical specifications and design of the sorter: THz (Tera-Hertz) imaging and Whisk Broom Scanner. -This deliverable is the basis for T4.4. and T4.5.

Technical description of the production processes in lab scale.

[D5.2] Technical description of the production processes in lab scale. [SINTEF, M30]. -This deliverable is based on the results of T5.2. -It will be a report technically describing the production processes developed in lab scale: formulation of materials and process parameters. -This deliverable will be the basis for T5.3.

Initial replication guide [MOV, M36].

[D9.8] Initial replication guide [MOV, M36]. -This deliverable is based on the results of T9.3. -It is a report for facilitate an implementation model of PlastiCircle

General architecture of the collection and transport system

General architecture of the collection and transport system: User/ system requirements [ITENE, M4]. -This deliverable will be based on the result of WP2 and the initial expectations defined in T3.1. and T3.3. - It will be a report describing the general architecture of the system as well as the requirements of users and the system in general. This document will guide the work within the WP. -This deliverable will be the basis for all the tasks of the WP (T3.1. to T3.5).

Sorting requirements

D4.1] Sorting requirements [AXION, M10]. -This deliverable is based on the results of T4.1. -It is a report on the requirements of the sorted fractions to be taken into consideration for the development of the prototype: composition of packaging waste collected and sorted, characterization protocol, technical requirements of sorted fractions. -This deliverable is the basis for all the tasks of this WP (T4.2 to T4.5.).

Social Life Cycle Assessment [ITENE, M44].

D75Social Life Cycle Assessment ITENE M44 This deliverable is based on the results of T74 It is based on a social LCA comparing the situation on the three cities and in Europe in general before and after PlastiCircleThis deliverable is the basis for T75

Final Replication Guide

This deliverable is based on the results of T93 It is the final report to facilitate an implementation model of PlastiCircleThis document will serve as a guide for cities interested in replicating the PlastiCircle approach This document will be an update of the initial replication guide and will include information about the pilots developed as part of the project This deliverable will spin aroundstakeholders engagement and ownership from administration to citizens compliance with regulations financing preparting the ground for the technology solution installation operation ensure sustainability of the replication and maintenance after the installation

Pilot planning

[D6.1] Pilot planning [SINTEF, M25]. -This deliverable is based on the results of T6.1. - It is a report describing the plan for each pilot: localization of the pilot, (2) involved actors, (3) time plan for the pilot, (4) starting conditions, (5) technical requirements to be considered for the pilot, (6) communication to citizens, (7) planning of logistics, (8) pilot blue-prints, (9) installation plans and maps, (10) phase in and phase out of equipment, (11) KPIs. -This deliverable is the basis for the T6.2., T6.3. and T6.4.

Final dissemination report [ICLEI, M48].

D99 Final dissemination report ICLEI M48This deliverable is based on the results of T92 It is a report describing all the dissemination activities carried out

Pilot Alba Iulia

D64Pilot Alba IuliaALBA IULIA M38This deliverable is based on the results of T64 It is a report describing the results obtained in the pilot in Alba Iulia This deliverable is the basis for T65

Technical description of the production processes in pilot scale.

D54 Technical description of the production processes in pilot scale SINTEF AS and S SINTEF TP M42This deliverable is based on the results of T53It will be a report technically describing the production processes developed in pilot scale formulation of materials and process parametersThis deliverable will be the basis for T54

Final communication report

D910 Final communication report ICLEI M48 This deliverable is based on the results of T96 It is a report describing all the communication activities carried out

Life cycle definition and description

[D7.1] Life cycle definition and description [ITENE, M8]. -This deliverable is based on the results of T7.1. - It will include the life cycle model of the current plastic waste collection, transport, sorting and treatment in the three cities and in a EU level. -This deliverable is the basis for T7.2., T7.3., T7.4., T7.5. and T7.6.

Sustainability assessment

D76Sustainability Assessment ITENE M45 This deliverable is based on the results of T75It is based on a comparative of the sustainability approach on collection transport sorting and recycling before and after PlastiCircle in the three cities and in Europe in general

Pilot Utrecht

[D6.3] Pilot Utrecht [UTRECHT, M34]. -This deliverable is based on the results of T6.3. - It is a report describing the results obtained in the pilot in Utrecht. - This deliverable is the basis for T6.4. and T6.5.

Methodology, planning and results of the co-design activities [Las Naves, M24].

[D9.6] Methodology, planning and results of the co-design activities [LAS NAVES, M24]. - This deliverable will be updated in M48. -This deliverable is based on the results of T9.4. -It is a summary of the co-design activities carried out and the results obtained.

Life Cycle Cost

D74Life Cycle Cost SINTEF AS M44 This deliverable is based on the results of T73It is based on a LCC comparing the situation on the three cities and in Europe in general before and after PlastiCircleThis deliverable is the basis for T75

Performance test of prototype

[D4.4] Performance test of prototype [PICVISA, M35]. -This deliverable is based on the preliminary results of T4.5. -It will be a report compiling the results of the testing and validation of the sorting prototype. -This deliverable will be the basis for T4.5.

Characterization protocol and compensation procedure

Characterization protocol and compensation procedure. [ITENE, M18]. -This deliverable will be based on the results of the T3.3. -It will be a report on the description of the procedure to characterize unitary garbage bags by waste managers and the associated proposal for citizens´compensation. -This deliverable will be the basis for T3.5.

Pilot Valencia

[D6.2] Pilot Valencia [LAS NAVES, M30]. -This deliverable is based on the results of T6.2. - It is a report describing the results obtained in the pilot in Valencia - This deliverable is the basis for T6.3., T6.4. and T6.5.

Results on the integration of the whole PlastiCircle approach

D65 Results on the integration of the whole PlastiCircle approachSINTEF AS and S SINTEF TP M44 This deliverable is based on the results of T65It is based on a description of the achievements on collection transport sorting and recycling in an integrated manner and based on KPIs

Specifications required by end users and comparison with sorted material. Pretreatment needed. Final

[D5.3] Specifications required by end users and comparison with sorted material. Pretreatment needed. Final [AXION, M35]. -This deliverable will include the final results of T5.1. -It will be a report describing the technical specifications required in the material for each one of the applications to be developed: foam boards, automotive parts, bituminous roofing membranes, garbage bags and urban furniture. Also, a comparative will be done with the properties of the materials obtained in WP4. -This deliverable will be the basis for T5.3. and T5.4.

Environmental Life Cycle Assessment

D73Environmental Life Cycle Assessment ITENE M44 This deliverable is based on the results of T72It is based on the environmental LCA comparing the situation on the three cities and in Europe in general before and after PlastiCircleThis deliverable is the basis for T75

Market Analysis for treatment of plastic packaging waste market. Updated M18-36

[D8.1] Market Analysis for treatment of plastic packaging waste market [KIMbcn, M6]. -It will be updated on M18 and M36. -This deliverable is based on the results of T8.2. -It will be a study of actual treatment of plastic packaging waste market needs and size in order to better define the approach for commercialisation. Updated M18-36

Initial Environmental, Economic and Social LCA

[D7.2] Initial Environmental, Economic and Social LCA [ITENE, M18]. -This deliverable is based on the preliminary results of T7.2., T7.3. and T7.4 -It will be based on the environmental, economic and social LCA for the initial situation on the three cities and in Europe in general. -This deliverable is the basis for T7.5.

Training Plan [SAV, M10].

[D9.5] Training Plan [SAV, M10]. -This deliverable is based on the results of T9.3. -It is a scheme and report of the planned training activities.

Specifications required by end users and comparison with sorted material. Pretreatment needed. Draft

[D5.1] Specifications required by end users and comparison with sorted material. Pretreatment needed. Draft [AXION, M15]. -This deliverable will include the preliminary results of T5.1. -It will be a report describing the technical specifications required in the material for each one of the applications to be developed: foam boards, automotive parts, bituminous roofing membranes, garbage bags and urban furniture. Also, a comparative will be done with the properties of the materials obtained in WP4. -This deliverable will be the basis for T5.2., T5.3. and T5.4.

Driving Behaviour Guidance

-This deliverable will be based on the results of T3.4. -It will be a report on the technical description of sensor CAN-Bus and efficient driving. -This deliverable will be the basis for T3.5.

Dissemination and communication plan [ICLEI, M6].

[D9.3] Dissemination and communication plan [ICLEI, M6]. -This deliverable is based on the results of T9.1 and T9.5. -It is a scheme and report of the planned dissemination and communication activities. -This deliverable is the basis for T9.2 and T9.6.

Validated prototype and report on foam boards for wind turbines/roofing structures/sandwich panels

D55 Validated prototype and report on foam boards for wind turbinesroofing structuressandwich panels ARMACELL M42 This deliverable is based on the results of T54It will include 1 the physical prototype and 2 a report technically describing this prototype

Final transport system

[D3.7] Final transport system [ITENE; M42]: -This deliverable will be based on the results of T3.5. - It will be a report describing the specifications of the final PlastiCircle transport system adapted after the pilots.

Container prototype. Evaluation of container performance

Container prototype. Evaluation of container performance [ITENE; M22]: -This deliverable will include the results of the T2.6. and WP3. -It will be a report on the performance of the whole system (filling sensor, transmission system, reading data, user identification and anti-fraud system) in real working conditions. -The information on this deliverable will be the basis for T2.7. and WP3.

Validated prototype and report on garbage bags

D58 Validated prototype and report on garbage bags INTERVAL M42This deliverable is based on the results of T54It will include 1 the physical prototype and 2 a report technically describing this prototype

Validated prototype and report on urban furniture: fences, benches and protection walls

D59 Validated prototype and report on urban furniture fences benches and protection walls HAHN M42This deliverable is based on the results of T54It will include 1 the physical prototype and 2 a report technically describing this prototype

Validated prototype and report on bituminous roofing membranes and asphalt sheets/roofing felts

D57 Validated prototype and report on bituminous roofing membranes and asphalt sheetsroofing felts DERBIGUM M42This deliverable is based on the results of T54It will include 1 the physical prototype and 2 a report technically describing this prototype

Prototype and report on technical and economic validation of products.

D510 Prototype and report on Technical and economic validation of products AXION M43This deliverable is based on the results of T54It will be a report analysing and validated the products from a technical and economic point of view foam boards automotive parts bituminous roofing membranes garbage bags and urban furniture

Validated prototype and report on engine covers, bumpers and dashboards

D56 Validated prototype and report on engine covers bumpers and dashboards CRF M42 This deliverable is based on the results of T54It will include 1 the physical prototype and 2 a report technically describing this prototype

Visual identity: logo and templates

D9.1] Visual identity: logo and templates [ICLEI, M3]. -This deliverable is based on the results of T9.6.

Veröffentlichungen

Effect of SEBS and OBC on the Impact Strength of Recycled Polypropylene/Talc Composites

Autoren: Marco Monti, Maria Teresa Scrivani, Valentina Gianotti
Veröffentlicht in: Recycling, Ausgabe 5/2, 2020, Seite(n) 9, ISSN 2313-4321
Herausgeber: MDPI
DOI: 10.3390/recycling5020009

Suche nach OpenAIRE-Daten ...

Bei der Suche nach OpenAIRE-Daten ist ein Fehler aufgetreten

Es liegen keine Ergebnisse vor